X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211004000

Well Details

Well ID: 0574211004000
Loading map...
Location: 00/04-10-057-21W4/0
Location Alias: 00/04-10-57-21 W4M
Location Alias 2: 00/04-10-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 10
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 4-10-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000656
License Date: 1949-09-28
License Status: Issued
Spud Date: 1949-10-29
Final Drill Date: 1949-11-13
Well Total Depth: 996.70 m
Surface Hole Latitude: 53.907163
Surface Hole Longitude: -113.046929

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-09-28 Obtained License
1949-11-10 Production Casing Operation Performed
1949-11-13 Finished Drilling
1949-11-13 Perforation Treatment Performed - Open-Hole Completion
1949-11-13 Well Mode changed to Drilled and Cased
1949-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-11-14 Well Began Production
1949-11-14 Well Fluid changed to Crude Oil
1949-11-14 Well Mode changed to Flowing
1950-08-24 Well Fluid changed to Crude Oil
1950-08-24 Well Mode changed to Pumping
1979-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-03 Well Log Performed
1986-04-04 Perforation Treatment Performed - Cement Plug
1986-04-04 Perforation Treatment Performed - Open-Hole Completion
1986-05-01 Well Fluid changed to Crude Oil
1986-05-01 Well Mode changed to Suspended
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Pumping
1996-09-09 Perforation Treatment Performed - Cement Plug
1996-09-09 Perforation Treatment Performed - Open-Hole Completion
1996-09-10 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-13 Open Hole/Barefoot Completion 965.60 996.70 0
1949-11-14 Acid Treatment 965.60 996.70 0
1979-03-30 Acid Treatment 965.60 972.90 0
1986-04-04 Cement Plug 978.20 984.50 0
1986-04-04 Open Hole/Barefoot Completion 965.60 978.20 0
1996-09-09 Cement Plug 975.70 978.20 0
1996-09-09 Open Hole/Barefoot Completion 965.60 975.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1975 120 0.0 0.0 0.0
1976 4115 0.0 0.0 0.0
1977 6346 0.0 0.0 0.0
1978 8526 0.0 0.0 0.0
1979 7242 0.0 0.0 0.0
1980 7943 0.0 0.0 0.0
1981 8013 0.0 0.0 0.0
1982 8516 0.0 0.0 0.0
1983 8726 0.0 0.0 0.0
1984 8528 0.0 0.0 0.0
1985 7762 0.0 0.0 0.0
1986 2549 0.0 0.0 0.0
1996 2464 0.0 0.0 0.0
1997 8670 0.0 0.0 0.0
1998 8541 0.0 0.0 0.0
1999 8158 0.0 0.0 0.0
2000 7789 0.0 0.0 0.0
2001 7783 0.0 0.0 0.0
2002 8204 0.0 0.0 0.0
2003 8718 0.0 0.0 0.0
2004 8641 0.0 0.0 0.0
2005 8291 0.0 0.0 0.0
2006 8574 0.0 0.0 0.0
2007 7712 0.0 0.0 0.0
2008 8411 0.0 0.0 0.0
2009 8740 0.0 0.0 0.0
2010 8653 0.0 0.0 0.0
2011 8077 0.0 0.0 0.0
2012 8461 0.0 0.0 0.0
2013 8169 0.0 0.0 0.0
2014 8621 0.0 0.0 0.0
2015 8009 0.0 0.0 0.0
2016 7802 0.0 0.0 0.0
2017 8197 0.0 0.0 0.0
2018 7816 0.0 0.0 0.0
2019 7559 0.0 0.0 0.0
2020 1875 0.0 0.0 0.0

For data sources see[5]

References