X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211506000

Well Details

Well ID: 0574211506000
Loading map...
Location: 00/06-15-057-21W4/0
Location Alias: 00/06-15-57-21 W4M
Location Alias 2: 00/06-15-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 15
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 6-15-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: B0002804
License Date: 1949-04-26
License Status: Abandoned
Spud Date: 1949-06-04
Final Drill Date: 1949-06-15
Well Total Depth: 976.60 m
Surface Hole Latitude: 53.925414
Surface Hole Longitude: -113.040834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-04-26 Obtained License
1949-06-08 Drill Stem Test Performed
1949-06-13 Production Casing Operation Performed
1949-06-15 Finished Drilling
1949-06-15 Perforation Treatment Performed - Open-Hole Completion
1949-06-15 Well Mode changed to Drilled and Cased
1949-06-16 Perforation Treatment Performed - Acid Wash - No Pressure
1949-06-17 Well Began Production
1949-06-17 Well Fluid changed to Crude Oil
1949-06-17 Well Mode changed to Flowing
1951-01-31 Well Fluid changed to Crude Oil
1951-01-31 Well Mode changed to Pumping
1972-11-22 Perforation Treatment Performed - Cement Plug
1972-11-22 Perforation Treatment Performed - Open-Hole Completion
1983-10-31 Well Fluid changed to Crude Oil
1983-10-31 Well Mode changed to Suspended
1985-09-01 Well Fluid changed to Crude Oil
1985-09-01 Well Mode changed to Pumping
1985-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-31 Well Fluid changed to Crude Oil
1985-10-31 Well Mode changed to Suspended
1996-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-11 Perforation Treatment Performed - Jet Perforation
1996-03-11 Plug Back Performed
1996-03-11 Well Fluid changed to Crude Oil
1996-03-11 Well Mode changed to Abandoned Zone
1996-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-21 Perforation Treatment Performed - Remedial Casing
1996-05-16 Well Abandoned
1996-05-16 Well Fluid changed to Crude Oil
1996-05-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-06-15 Open Hole/Barefoot Completion 953.10 976.60 0
1949-06-16 Acid Wash 953.10 976.60 0
1972-11-22 Cement Plug 969.30 976.60 0
1972-11-22 Open Hole/Barefoot Completion 953.10 969.30 0
1985-10-03 Acid Treatment 953.10 953.90 0
1996-03-11 Packing Device Capped w/Cement 932.00 940.00 0
1996-03-11 Perforation 205.00 206.00 7
1996-04-21 Remedial Casing Cementing 205.00 206.00 0
1996-04-21 Packing Device Capped w/Cement 210.00 210.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 7980 0.0 0.0 0.0
1974 8412 0.0 0.0 0.0
1975 7451 0.0 0.0 0.0
1976 2700 0.0 0.0 0.0
1977 4506 0.0 0.0 0.0
1978 4805 0.0 0.0 0.0
1979 8207 0.0 0.0 0.0
1980 8272 0.0 0.0 0.0
1981 8093 0.0 0.0 0.0
1982 8543 0.0 0.0 0.0
1983 6926 0.0 0.0 0.0
1985 288 0.0 0.0 0.0

For data sources see[5]

References