X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211610000

Well Details

Well ID: 0574211610000
Loading map...
Location: 00/10-16-057-21W4/0
Location Alias: 00/10-16-57-21 W4M
Location Alias 2: 00/10-16-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 16
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 10-16-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000360
License Date: 1949-07-20
License Status: Abandoned
Spud Date: 1949-10-01
Final Drill Date: 1949-10-14
Well Total Depth: 983.30 m
Surface Hole Latitude: 53.929028
Surface Hole Longitude: -113.059543

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-07-20 Obtained License
1949-10-13 Production Casing Operation Performed
1949-10-14 Finished Drilling
1949-10-14 Perforation Treatment Performed - Open-Hole Completion
1949-10-14 Well Mode changed to Drilled and Cased
1949-10-19 Well Began Production
1949-10-19 Well Fluid changed to Crude Oil
1949-10-19 Well Mode changed to Flowing
1951-05-26 Well Fluid changed to Crude Oil
1951-05-26 Well Mode changed to Pumping
1980-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-05 Well Fluid changed to Crude Oil
1982-08-05 Well Mode changed to Suspended
1983-04-28 Perforation Treatment Performed - Cement Plug
1983-04-28 Perforation Treatment Performed - Open-Hole Completion
1983-07-11 Perforation Treatment Performed - Jet Perforation
1983-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-14 Well Fluid changed to Crude Oil
1983-07-14 Well Mode changed to Pumping
1984-08-16 Perforation Treatment Performed - Cement Plug
1984-08-16 Perforation Treatment Performed - Open-Hole Completion
1984-08-20 Perforation Treatment Performed - Jet Perforation
1984-08-20 Well Log Performed
1999-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-18 Plug Back Performed
1999-04-18 Well Fluid changed to Crude Oil
1999-04-18 Well Log Performed
1999-04-18 Well Mode changed to Abandoned Zone
1999-04-19 Perforation Treatment Performed - Jet Perforation
1999-04-19 Well Log Performed
1999-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-21 Perforation Treatment Performed - Cement Squeeze
1999-04-21 Well Log Performed
1999-04-22 Perforation Treatment Performed - Jet Perforation
2014-08-15 Well Log Performed
2014-08-24 Well Log Performed
2014-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-15 Perforation Treatment Performed - Jet Perforation
2014-10-15 Perforation Treatment Performed - Remedial Casing
2014-10-15 Plug Back Performed
2014-10-15 Well Log Performed
2014-10-16 Perforation Treatment Performed - Jet Perforation
2014-10-16 Well Log Performed
2014-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-17 Perforation Treatment Performed - Remedial Casing
2014-10-17 Plug Back Performed
2014-11-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-10-14 Open Hole/Barefoot Completion 954.60 983.30 0
1984-08-20 Perforation 953.50 963.20 13
1999-04-18 Packing Device Capped w/Cement 930.00 939.00 0
1999-04-19 Perforation 897.60 902.20 17
1999-04-21 Cement Squeeze 897.60 902.20 0
1999-04-21 Packing Device Capped w/Cement 895.30 896.00 0
1999-04-22 Perforation 886.30 888.20 17
1999-04-22 Perforation 889.40 891.80 17
2014-10-15 Packing Device Capped w/Cement 872.00 880.00 0
2014-10-15 Perforation 641.00 643.00 17
2014-10-15 Remedial Casing Cementing 641.00 643.00 0
1980-09-25 Acid Treatment 954.60 983.30 0
2014-10-15 Packing Device Capped w/Cement 616.20 637.00 0
2014-10-16 Perforation 213.00 215.00 17
2014-10-17 Remedial Casing Cementing 213.00 215.00 0
2014-10-17 Packing Device Capped w/Cement 206.70 211.00 0
1982-01-26 Acid Treatment 954.60 983.30 0
1983-04-28 Cement Plug 965.00 983.30 0
1983-04-28 Open Hole/Barefoot Completion 954.60 965.00 0
1983-07-11 Perforation 955.50 962.50 13
1983-07-13 Acid Treatment 954.60 965.00 0
1984-08-16 Cement Plug 964.20 965.00 0
1984-08-16 Open Hole/Barefoot Completion 954.60 964.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2828 0.0 0.0 0.0
1968 2887 0.0 0.0 0.0
1969 3304 0.0 0.0 0.0
1970 4015 0.0 0.0 0.0
1971 4581 0.0 0.0 0.0
1972 5930 0.0 0.0 0.0
1973 7709 0.0 0.0 0.0
1974 6520 0.0 0.0 0.0
1975 5603 0.0 0.0 0.0
1976 5008 0.0 0.0 0.0
1977 8471 0.0 0.0 0.0
1978 8492 0.0 0.0 0.0
1979 8219 0.0 0.0 0.0
1980 7775 0.0 0.0 0.0
1981 8543 0.0 0.0 0.0
1982 5879 0.0 0.0 0.0
1983 4200 0.0 0.0 0.0
1984 8495 0.0 0.0 0.0
1985 8759 0.0 0.0 0.0
1986 8591 0.0 0.0 0.0
1987 8735 0.0 0.0 0.0
1988 8591 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8410 0.0 0.0 0.0
1991 8745 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8724 0.0 0.0 0.0
1994 8600 0.0 0.0 0.0
1995 8730 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8755 0.0 0.0 0.0
1998 8616 0.0 0.0 0.0
1999 2640 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References