X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211716000

Well Details

Well ID: 0574211716000
Loading map...
Location: 00/16-17-057-21W4/0
Location Alias: 00/16-17-57-21 W4M
Location Alias 2: 00/16-17-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 17
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 16-17-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0010597
License Date: 1955-12-12
License Status: Abandoned
Spud Date: 1949-03-30
Final Drill Date: 1949-04-17
Well Total Depth: 1000.40 m
Surface Hole Latitude: 53.932643
Surface Hole Longitude: -113.078191

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-04-12 Production Casing Operation Performed
1949-04-17 Finished Drilling
1949-04-17 Perforation Treatment Performed - Open-Hole Completion
1949-04-17 Well Mode changed to Drilled and Cased
1949-04-19 Perforation Treatment Performed - Acid Wash - No Pressure
1949-04-19 Well Began Production
1949-04-19 Well Fluid changed to Crude Oil
1949-04-19 Well Mode changed to Flowing
1949-10-01 Well Fluid changed to Crude Oil
1949-10-01 Well Mode changed to Pumping
1955-12-12 Obtained License
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Suspended
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Pumping
1997-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-04 Perforation Treatment Performed - Jet Perforation
1997-06-04 Perforation Treatment Performed - Remedial Casing
1997-06-04 Plug Back Performed
1997-06-12 Well Abandoned
1997-06-12 Well Fluid changed to Crude Oil
1997-06-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-17 Open Hole/Barefoot Completion 970.20 1000.40 0
1949-04-19 Acid Wash 970.20 1000.40 0
1997-06-04 Packing Device Capped w/Cement 955.60 963.60 0
1997-06-04 Perforation 212.00 213.00 13
1997-06-04 Remedial Casing Cementing 212.00 213.00 0
1997-06-04 Packing Device Capped w/Cement 132.30 217.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4669 0.0 0.0 0.0
1968 4287 0.0 0.0 0.0
1969 4792 0.0 0.0 0.0
1970 5556 0.0 0.0 0.0
1971 6721 0.0 0.0 0.0
1972 6975 0.0 0.0 0.0
1973 8424 0.0 0.0 0.0
1974 8650 0.0 0.0 0.0
1975 8055 0.0 0.0 0.0
1976 8733 0.0 0.0 0.0
1977 8588 0.0 0.0 0.0
1978 1406 0.0 0.0 0.0
1980 698 0.0 0.0 0.0
1981 8293 0.0 0.0 0.0
1982 8665 0.0 0.0 0.0
1983 8563 0.0 0.0 0.0
1984 8630 0.0 0.0 0.0
1985 1449 0.0 0.0 0.0
1986 60 0.0 0.0 0.0
1996 1122 0.0 0.0 0.0

For data sources see[5]

References