X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212214000

Well Details

Well ID: 0574212214000
Loading map...
Location: 00/14-22-057-21W4/0
Location Alias: 00/14-22-57-21 W4M
Location Alias 2: 00/14-22-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 22
County/Municipality: Sturgeon County
Well Name: ACCEL HOLDINGS REDWATER 14-22-57-21
Operator Name: ACCEL Canada Holdings Limited
License Number: 0000718
License Date: 1949-10-07
License Status: Issued
Spud Date: 1949-10-20
Final Drill Date: 1949-11-01
Well Total Depth: 998.50 m
Surface Hole Latitude: 53.947098
Surface Hole Longitude: -113.040895

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-10-07 Obtained License
1949-10-30 Production Casing Operation Performed
1949-11-01 Finished Drilling
1949-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-11-01 Perforation Treatment Performed - Open-Hole Completion
1949-11-01 Well Mode changed to Drilled and Cased
1949-11-02 Well Began Production
1949-11-02 Well Fluid changed to Crude Oil
1949-11-02 Well Mode changed to Flowing
1950-09-01 Well Fluid changed to Crude Oil
1950-09-01 Well Mode changed to Pumping
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1984-09-05 Well Log Performed
1984-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-20 Plug Back Performed
1984-11-20 Well Fluid changed to Crude Oil
1984-11-20 Well Mode changed to Abandoned Zone
1984-11-21 Perforation Treatment Performed - Jet Perforation
1984-11-21 Well Log Performed
1984-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-03-16 Well Log Performed
1988-09-20 Perforation Treatment Performed - Cement Squeeze
1988-09-20 Plug Back Performed
1993-10-25 Well Log Performed
1993-11-11 Well Fluid changed to Crude Oil
1993-11-11 Well Mode changed to Flowing
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-01 Open Hole/Barefoot Completion 974.40 998.50 0
1949-11-01 Acid Treatment 974.40 998.50 0
1984-11-20 Packing Device Capped w/Cement 945.40 954.00 0
1984-11-21 Perforation 744.50 746.50 7
1984-11-26 Acid Treatment 744.50 746.50 0
1988-03-16 Perforation 608.00 615.00 13
1988-09-20 Cement Squeeze 608.00 615.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 736 0.0 0.0 0.0
1974 7019 0.0 0.0 0.0
1975 5592 0.0 0.0 0.0
1976 6404 0.0 0.0 0.0
1977 7608 0.0 0.0 0.0
1978 8488 0.0 0.0 0.0
1979 688 0.0 0.0 0.0
1980 22 0.0 0.0 0.0
1993 1214 0.0 0.0 0.0
1994 8363 0.0 0.0 0.0
1995 8489 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 8676 0.0 0.0 0.0
1998 8482 0.0 0.0 0.0
1999 8091 0.0 0.0 0.0
2000 8732 0.0 0.0 0.0
2001 8688 0.0 0.0 0.0
2002 8376 0.0 0.0 0.0
2003 8520 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 8251 0.0 0.0 0.0
2006 8577 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8389 0.0 0.0 0.0
2009 8671 0.0 0.0 0.0
2010 8650 0.0 0.0 0.0
2011 8512 0.0 0.0 0.0
2012 8722 0.0 0.0 0.0
2013 7921 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8205 0.0 0.0 0.0
2016 8228 0.0 0.0 0.0
2017 8683 0.0 0.0 0.0
2018 8130 0.0 0.0 0.0
2019 8060 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References