X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212807000

Well Details

Well ID: 0574212807000
Loading map...
Location: 00/07-28-057-21W4/0
Location Alias: 00/07-28-57-21 W4M
Location Alias 2: 00/07-28-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 28
County/Municipality: Sturgeon County
Well Name: IMPERIAL REDWATER NO. 65 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0001062
License Date: 1949-12-21
License Status: RecCertified
Spud Date: 1950-01-15
Final Drill Date: 1950-02-05
Well Total Depth: 982.10 m
Surface Hole Latitude: 53.954516
Surface Hole Longitude: -113.059610

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-12-21 Obtained License
1950-01-21 Drill Stem Test Performed
1950-01-23 Drill Stem Test Performed
1950-01-28 Drill Stem Test Performed
1950-02-02 Production Casing Operation Performed
1950-02-05 Finished Drilling
1950-02-05 Perforation Treatment Performed - Open-Hole Completion
1950-02-05 Well Mode changed to Drilled and Cased
1950-02-08 Perforation Treatment Performed - Acid Wash - No Pressure
1950-02-08 Well Began Production
1950-02-08 Well Fluid changed to Crude Oil
1950-02-08 Well Mode changed to Flowing
1951-12-01 Well Fluid changed to Crude Oil
1951-12-01 Well Mode changed to Pumping
1970-01-24 Well Fluid changed to Liquid Petroleum Gas
1970-01-24 Well Type changed to Storage
1975-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-02 Well Fluid changed to Crude Oil
1980-12-02 Well Mode changed to Pumping
1982-07-15 Well Fluid changed to Crude Oil
1982-07-15 Well Mode changed to Suspended
1985-12-16 Well Log Performed
1985-12-17 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-24 Well Log Performed
1994-04-01 Well Fluid changed to Crude Oil
1994-04-01 Well Mode changed to Pumping
1995-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-15 Plug Back Performed
1995-03-07 Perforation Treatment Performed - Jet Perforation
1995-03-27 Perforation Treatment Performed - Remedial Casing
1995-04-27 Perforation Treatment Performed - Jet Perforation
1995-04-27 Perforation Treatment Performed - Remedial Casing
1995-04-27 Well Fluid changed to Crude Oil
1995-04-27 Well Mode changed to Abandoned
1995-04-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-02-05 Open Hole/Barefoot Completion 946.40 982.10 0
1950-02-08 Acid Wash 946.40 982.10 0
1975-05-16 Acid Treatment 946.40 982.10 0
1994-03-24 Perforation 944.00 947.80 13
1995-02-15 Packing Device Capped w/Cement 932.00 940.00 0
1995-03-07 Perforation 425.00 426.00 13
1995-03-27 Remedial Casing Cementing 425.00 426.00 0
1995-04-27 Perforation 217.00 218.00 13
1995-04-27 Remedial Casing Cementing 217.00 218.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 630 0.0 0.0 0.0
1981 8511 0.0 0.0 0.0
1982 4178 0.0 0.0 0.0
1994 6204 0.0 0.0 0.0
1995 240 0.0 0.0 0.0

For data sources see[5]

References