If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574213308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.968806,"lon":-113.055136,"icon":""}]} |
Location: 02/08-33-057-21W4/0 | |
Location Alias: 02/08-33-57-21 W4M | |
Location Alias 2: 02/08-33-057-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 21 | |
Section: 33 | |
County/Municipality: Sturgeon County | |
Well Name: ESSO REDWATER 8-33-57-21 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0086100 | |
License Date: 1980-10-06 | |
License Status: RecCertified | |
Spud Date: 1980-10-10 | |
Final Drill Date: 1980-10-23 | |
Well Total Depth: 996.50 m | |
Surface Hole Latitude: 53.968806 | |
Surface Hole Longitude: -113.055136 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-10-06 | Obtained License |
1980-10-17 | Well Log Performed |
1980-10-18 | Drill Stem Test Performed |
1980-10-19 | Drill Stem Test Performed |
1980-10-20 | Drill Stem Test Performed |
1980-10-21 | Production Casing Operation Performed |
1980-10-23 | Finished Drilling |
1980-10-23 | Perforation Treatment Performed - Open-Hole Completion |
1980-10-23 | Well Mode changed to Drilled and Cased |
1980-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-12-08 | Well Began Production |
1980-12-08 | Well Fluid changed to Crude Oil |
1980-12-08 | Well Mode changed to Pumping |
1981-10-28 | Perforation Treatment Performed - Cement Plug |
1982-03-04 | Well Fluid changed to Crude Oil |
1982-03-04 | Well Mode changed to Suspended |
1988-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-04 | Plug Back Performed |
1988-03-04 | Well Fluid changed to Crude Oil |
1988-03-04 | Well Log Performed |
1988-03-04 | Well Mode changed to Abandoned Zone |
1988-03-07 | Perforation Treatment Performed - Jet Perforation |
1988-03-07 | Well Log Performed |
1988-03-09 | Perforation Treatment Performed - Cement Squeeze |
1988-03-11 | Perforation Treatment Performed - Jet Perforation |
1988-03-11 | Well Log Performed |
1988-04-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-07-26 | Well Log Performed |
1988-07-28 | Well Log Performed |
1988-07-29 | Perforation Treatment Performed - Jet Perforation |
1989-10-12 | Perforation Treatment Performed - Cement Squeeze |
1989-10-12 | Plug Back Performed |
1990-03-13 | Perforation Treatment Performed - Cement Plug |
1990-03-13 | Plug Back Performed |
1990-03-16 | Well Log Performed |
1990-03-19 | Perforation Treatment Performed - Jet Perforation |
1990-03-19 | Well Log Performed |
1992-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-08 | Perforation Treatment Performed - Jet Perforation |
1992-09-08 | Plug Back Performed |
1992-09-09 | Perforation Treatment Performed - Remedial Casing |
1992-09-17 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-10-23 | Open Hole/Barefoot Completion | 988.00 | 996.50 | 0 |
1988-07-29 | Perforation | 782.00 | 791.00 | 13 |
1989-10-12 | Cement Squeeze | 782.00 | 791.00 | 0 |
1990-03-13 | Cement Plug | 793.90 | 811.70 | 0 |
1990-03-19 | Perforation | 737.00 | 739.50 | 14 |
1990-03-19 | Perforation | 747.70 | 754.70 | 14 |
1990-03-19 | Perforation | 757.20 | 758.20 | 14 |
1992-09-08 | Packing Device Capped w/Cement | 715.00 | 723.00 | 0 |
1992-09-08 | Perforation | 186.00 | 187.00 | 7 |
1992-09-09 | Remedial Casing Cementing | 186.00 | 187.00 | 0 |
1980-11-12 | Acid Treatment | 988.00 | 996.50 | 0 |
1980-11-18 | Acid Treatment | 988.00 | 996.50 | 0 |
1981-10-28 | Cement Plug | 988.90 | 996.50 | 0 |
1988-03-04 | Packing Device Capped w/Cement | 973.00 | 980.00 | 0 |
1988-03-07 | Perforation | 808.50 | 809.50 | 13 |
1988-03-09 | Cement Squeeze | 808.50 | 809.50 | 0 |
1988-03-11 | Perforation | 808.50 | 809.50 | 13 |
1988-04-08 | Acid Treatment | 808.50 | 809.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 3145 | 0.0 | 0.0 | 0.0 |
1982 | 1494 | 0.0 | 0.0 | 0.0 |
For data sources see[5]