If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0574221502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.922834,"lon":-113.166635,"icon":""}]} |
Location: 00/02-15-057-22W4/0 | |
Location Alias: 00/02-15-57-22 W4M | |
Location Alias 2: 00/02-15-057-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 4 | |
Range: 22 | |
Section: 15 | |
County/Municipality: Sturgeon County | |
Well Name: WESTFIRE HZ REDWATER 2-15-57-22 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0441020 | |
License Date: 2011-12-13 | |
License Status: Issued | |
Spud Date: 2012-02-08 | |
Final Drill Date: 2012-02-12 | |
Well Total Depth: 1862.00 m | |
Surface Hole Latitude: 53.922834 | |
Surface Hole Longitude: -113.166635 |
Date | Event |
---|---|
2011-12-13 | Obtained License |
2012-02-09 | Surface Casing Operation Performed |
2012-02-10 | Direction Drilling Operation Performed - Horizontal |
2012-02-12 | Finished Drilling |
2012-02-12 | Well Log Performed |
2012-02-12 | Well Mode changed to Drilled and Cased |
2012-02-13 | Production Casing Operation Performed |
2012-02-13 | Rig Released |
2012-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-05 | Well Began Production |
2012-03-05 | Well Fluid changed to Crude Oil |
2012-03-05 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-08 | Trinidad Drilling Ltd. | 66 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-10 | 448.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-25 | Multi-Stage Fracture | 1844.30 | 1844.50 | 0 |
2012-02-25 | Multi-Stage Fracture | 1497.40 | 1497.60 | 0 |
2012-02-25 | Multi-Stage Fracture | 1456.20 | 1456.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 1414.90 | 1415.10 | 0 |
2012-02-25 | Multi-Stage Fracture | 1373.70 | 1373.90 | 0 |
2012-02-25 | Multi-Stage Fracture | 1332.50 | 1332.70 | 0 |
2012-02-25 | Multi-Stage Fracture | 1291.20 | 1291.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 1250.00 | 1250.20 | 0 |
2012-02-25 | Multi-Stage Fracture | 1208.70 | 1208.90 | 0 |
2012-02-25 | Multi-Stage Fracture | 1167.50 | 1167.70 | 0 |
2012-02-25 | Multi-Stage Fracture | 1126.20 | 1126.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 1816.70 | 1816.90 | 0 |
2012-02-25 | Multi-Stage Fracture | 1084.90 | 1085.10 | 0 |
2012-02-25 | Multi-Stage Fracture | 1043.60 | 1043.80 | 0 |
2012-02-25 | Multi-Stage Fracture | 1005.10 | 1005.30 | 0 |
2012-02-25 | Multi-Stage Fracture | 963.90 | 964.10 | 0 |
2012-02-25 | Multi-Stage Fracture | 922.60 | 922.80 | 0 |
2012-02-25 | Multi-Stage Fracture | 867.70 | 867.90 | 0 |
2012-02-25 | Multi-Stage Fracture | 1786.20 | 1786.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 1744.90 | 1745.20 | 0 |
2012-02-25 | Multi-Stage Fracture | 1703.70 | 1703.90 | 0 |
2012-02-25 | Multi-Stage Fracture | 1662.40 | 1662.60 | 0 |
2012-02-25 | Multi-Stage Fracture | 1621.20 | 1621.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 1579.90 | 1580.10 | 0 |
2012-02-25 | Multi-Stage Fracture | 1538.70 | 1538.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6927 | 0.0 | 0.0 | 0.0 |
2013 | 8738 | 0.0 | 0.0 | 0.0 |
2014 | 8686 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8733 | 0.0 | 0.0 | 0.0 |
2017 | 8727 | 0.0 | 0.0 | 0.0 |
2018 | 8694 | 0.0 | 0.0 | 0.0 |
2019 | 8729 | 0.0 | 0.0 | 0.0 |
2020 | 1804 | 0.0 | 0.0 | 0.0 |
For data sources see[7]