X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574222107020

Well Details

Well ID: 0574222107020
Loading map...
Location: 02/07-21-057-22W4/0
Location Alias: 02/07-21-57-22 W4M
Location Alias 2: 02/07-21-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 21
County/Municipality: Sturgeon County
Well Name: WESTFIRE HZ 102 REDWATER 7-21-57-22
Operator Name: Long Run Exploration Ltd.
License Number: 0440341
License Date: 2011-12-05
License Status: Issued
Spud Date: 2012-01-26
Final Drill Date: 2012-01-30
Well Total Depth: 1473.00 m
Surface Hole Latitude: 53.938594
Surface Hole Longitude: -113.197768

For data sources see[1][2]

Well History

Date Event
2011-12-05 Obtained License
2012-01-26 Well Log Performed
2012-01-27 Surface Casing Operation Performed
2012-01-28 Direction Drilling Operation Performed - Horizontal
2012-01-30 Finished Drilling
2012-01-30 Well Log Performed
2012-01-30 Well Mode changed to Drilled and Cased
2012-01-31 Production Casing Operation Performed
2012-01-31 Rig Released
2012-02-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Well Began Production
2012-03-12 Well Fluid changed to Crude Oil
2012-03-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-26 Ensign Drilling Inc. 521 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-28 433.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-29 Multi-Stage Fracture 897.10 897.30 0
2012-02-29 Multi-Stage Fracture 1138.90 1139.10 0
2012-02-29 Multi-Stage Fracture 1165.30 1165.40 0
2012-02-29 Multi-Stage Fracture 1192.50 1192.70 0
2012-02-29 Multi-Stage Fracture 1219.30 1219.50 0
2012-02-29 Multi-Stage Fracture 1246.60 1246.80 0
2012-02-29 Multi-Stage Fracture 1272.50 1272.70 0
2012-02-29 Multi-Stage Fracture 1299.60 1299.80 0
2012-02-29 Multi-Stage Fracture 1326.70 1326.90 0
2012-02-29 Multi-Stage Fracture 1354.00 1354.20 0
2012-02-29 Multi-Stage Fracture 1380.90 1381.10 0
2012-02-29 Multi-Stage Fracture 923.90 924.10 0
2012-02-29 Multi-Stage Fracture 1412.00 1412.20 0
2012-02-29 Multi-Stage Fracture 1451.50 1451.70 0
2012-02-29 Multi-Stage Fracture 951.10 951.30 0
2012-02-29 Multi-Stage Fracture 978.10 978.20 0
2012-02-29 Multi-Stage Fracture 1005.40 1005.60 0
2012-02-29 Multi-Stage Fracture 1031.60 1031.80 0
2012-02-29 Multi-Stage Fracture 1058.70 1058.80 0
2012-02-29 Multi-Stage Fracture 1085.40 1085.60 0
2012-02-29 Multi-Stage Fracture 1112.30 1112.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6810 0.0 0.0 0.0
2013 8640 0.0 0.0 0.0
2014 8677 0.0 0.0 0.0
2015 8757 0.0 0.0 0.0
2016 8686 0.0 0.0 0.0
2017 8742 0.0 0.0 0.0
2018 8756 0.0 0.0 0.0
2019 6421 0.0 0.0 0.0

For data sources see[7]

References