X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574222808020

Well Details

Well ID: 0574222808020
Loading map...
Location: 02/08-28-057-22W4/0
Location Alias: 02/08-28-57-22 W4M
Location Alias 2: 02/08-28-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 28
County/Municipality: Sturgeon County
Well Name: WESTFIRE HZ 102 REDWATER 8-28-57-22
Operator Name: Long Run Exploration Ltd.
License Number: 0443584
License Date: 2012-02-01
License Status: Issued
Spud Date: 2012-02-28
Final Drill Date: 2012-03-02
Well Total Depth: 1524.00 m
Surface Hole Latitude: 53.947842
Surface Hole Longitude: -113.206886

For data sources see[1][2]

Well History

Date Event
2012-02-01 Obtained License
2012-02-28 Surface Casing Operation Performed
2012-02-29 Direction Drilling Operation Performed - Horizontal
2012-03-02 Finished Drilling
2012-03-02 Well Log Performed
2012-03-02 Well Mode changed to Drilled and Cased
2012-03-03 Production Casing Operation Performed
2012-03-03 Rig Released
2012-03-10 Well Log Performed
2012-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-02 Well Began Production
2012-04-02 Well Fluid changed to Crude Oil
2012-04-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-28 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-29 362.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-21 Multi-Stage Fracture 938.80 939.00 0
2012-03-21 Multi-Stage Fracture 1200.40 1200.60 0
2012-03-21 Multi-Stage Fracture 1228.00 1228.20 0
2012-03-21 Multi-Stage Fracture 1255.50 1255.70 0
2012-03-21 Multi-Stage Fracture 1283.10 1283.30 0
2012-03-21 Multi-Stage Fracture 1310.40 1310.60 0
2012-03-21 Multi-Stage Fracture 1338.00 1338.20 0
2012-03-21 Multi-Stage Fracture 1365.60 1365.80 0
2012-03-21 Multi-Stage Fracture 1393.10 1393.30 0
2012-03-21 Multi-Stage Fracture 1420.70 1420.90 0
2012-03-21 Multi-Stage Fracture 1448.30 1448.50 0
2012-03-21 Multi-Stage Fracture 980.00 980.20 0
2012-03-21 Multi-Stage Fracture 1478.70 1478.90 0
2012-03-21 Multi-Stage Fracture 1506.30 1506.50 0
2012-03-21 Multi-Stage Fracture 1007.60 1007.80 0
2012-03-21 Multi-Stage Fracture 1035.20 1035.40 0
2012-03-21 Multi-Stage Fracture 1062.70 1062.90 0
2012-03-21 Multi-Stage Fracture 1090.20 1090.40 0
2012-03-21 Multi-Stage Fracture 1117.70 1117.90 0
2012-03-21 Multi-Stage Fracture 1145.30 1145.50 0
2012-03-21 Multi-Stage Fracture 1172.80 1173.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6515 0.0 0.0 0.0
2013 8624 0.0 0.0 0.0
2014 8673 0.0 0.0 0.0
2015 8725 0.0 0.0 0.0
2016 8684 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8608 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 1955 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References