X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574222915000

Well Details

Well ID: 0574222915000
Loading map...
Location: 00/15-29-057-22W4/0
Location Alias: 00/15-29-57-22 W4M
Location Alias 2: 00/15-29-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 29
County/Municipality: Sturgeon County
Well Name: WESTFIRE HZ REDWATER 15-29-57-22
Operator Name: Long Run Exploration Ltd.
License Number: 0439673
License Date: 2011-11-25
License Status: Suspension
Spud Date: 2012-01-25
Final Drill Date: 2012-01-29
Well Total Depth: 1579.00 m
Surface Hole Latitude: 53.959707
Surface Hole Longitude: -113.221270

For data sources see[1][2]

Well History

Date Event
2011-11-25 Obtained License
2012-01-25 Surface Casing Operation Performed
2012-01-25 Well Log Performed
2012-01-26 Direction Drilling Operation Performed - Horizontal
2012-01-29 Finished Drilling
2012-01-29 Production Casing Operation Performed
2012-01-29 Well Log Performed
2012-01-29 Well Mode changed to Drilled and Cased
2012-01-30 Rig Released
2012-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Well Began Production
2012-02-15 Well Fluid changed to Crude Oil
2012-02-15 Well Mode changed to Pumping
2019-10-31 Well Fluid changed to Crude Oil
2019-10-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-25 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-26 287.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-06 Multi-Stage Fracture 1520.90 1521.00 0
2012-02-06 Multi-Stage Fracture 1215.00 1215.10 0
2012-02-06 Multi-Stage Fracture 1174.50 1174.60 0
2012-02-06 Multi-Stage Fracture 1133.40 1133.50 0
2012-02-06 Multi-Stage Fracture 1092.10 1092.20 0
2012-02-07 Multi-Stage Fracture 1050.80 1050.90 0
2012-02-07 Multi-Stage Fracture 1009.60 1009.70 0
2012-02-06 Multi-Stage Fracture 1493.30 1493.40 0
2012-02-06 Multi-Stage Fracture 1462.80 1462.90 0
2012-02-06 Multi-Stage Fracture 1435.20 1435.30 0
2012-02-06 Multi-Stage Fracture 1407.50 1407.60 0
2012-02-06 Multi-Stage Fracture 1380.00 1380.10 0
2012-02-06 Multi-Stage Fracture 1338.70 1338.80 0
2012-02-06 Multi-Stage Fracture 1297.50 1297.60 0
2012-02-06 Multi-Stage Fracture 1256.20 1256.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7483 0.0 0.0 0.0
2013 8580 0.0 0.0 0.0
2014 8609 0.0 0.0 0.0
2015 8625 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8747 0.0 0.0 0.0
2018 636 0.0 0.0 0.0

For data sources see[7]

References