X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574223011020

Well Details

Well ID: 0574223011020
Loading map...
Location: 02/11-30-057-22W4/0
Location Alias: 02/11-30-57-22 W4M
Location Alias 2: 02/11-30-057-22 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 22
Section: 30
County/Municipality: Sturgeon County
Well Name: LONG RUN 102 HZ REDWATER 11-30-57-22
Operator Name: Long Run Exploration Ltd.
License Number: 0447036
License Date: 2012-07-06
License Status: Suspension
Spud Date: 2012-07-31
Final Drill Date: 2012-08-04
Well Total Depth: 1568.00 m
Surface Hole Latitude: 53.957444
Surface Hole Longitude: -113.249239

For data sources see[1][2]

Well History

Date Event
2012-07-06 Obtained License
2012-07-31 Well Log Performed
2012-08-01 Surface Casing Operation Performed
2012-08-02 Direction Drilling Operation Performed - Horizontal
2012-08-02 Well Log Performed
2012-08-04 Finished Drilling
2012-08-04 Well Log Performed
2012-08-04 Well Mode changed to Drilled and Cased
2012-08-05 Production Casing Operation Performed
2012-08-05 Rig Released
2012-08-15 Well Log Performed
2012-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping
2018-11-30 Well Fluid changed to Crude Oil
2018-11-30 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-31 Ensign Drilling Inc. 521 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-02 441.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-27 Multi-Stage Fracture 1540.10 1540.50 0
2012-08-27 Multi-Stage Fracture 1183.60 1184.00 0
2012-08-27 Multi-Stage Fracture 1156.60 1157.00 0
2012-08-27 Multi-Stage Fracture 1129.50 1129.90 0
2012-08-27 Multi-Stage Fracture 1102.40 1102.80 0
2012-08-27 Multi-Stage Fracture 1075.40 1075.80 0
2012-08-27 Multi-Stage Fracture 1048.30 1048.70 0
2012-08-27 Multi-Stage Fracture 1021.30 1021.70 0
2012-08-27 Multi-Stage Fracture 994.20 994.60 0
2012-08-27 Multi-Stage Fracture 967.20 967.60 0
2012-08-27 Multi-Stage Fracture 940.10 940.50 0
2012-08-27 Multi-Stage Fracture 1496.50 1496.90 0
2012-08-27 Multi-Stage Fracture 913.10 913.50 0
2012-08-27 Multi-Stage Fracture 1456.10 1456.50 0
2012-08-27 Multi-Stage Fracture 1415.70 1416.10 0
2012-08-27 Multi-Stage Fracture 1375.40 1375.80 0
2012-08-27 Multi-Stage Fracture 1335.00 1335.40 0
2012-08-27 Multi-Stage Fracture 1294.60 1295.00 0
2012-08-27 Multi-Stage Fracture 1251.00 1251.40 0
2012-08-27 Multi-Stage Fracture 1210.60 1211.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2901 0.0 0.0 0.0
2013 7886 0.0 0.0 0.0
2014 8709 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8375 0.0 0.0 0.0
2017 6839 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-27 No Incident Encountered 0.00 0.00
2012-08-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References