X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574243204003

Well Details

Well ID: 0574243204003
Loading map...
Location: 00/04-32-057-24W4/3
Location Alias: 00/04-32-57-24 W4M
Location Alias 2: 00/04-32-057-24 W4/03
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 24
Section: 32
County/Municipality: Sturgeon County
Well Name: DORSET LEGAL 4-32-57-24
Operator Name: Baytex Energy Ltd.
License Number: 0001055
License Date: 1949-12-16
License Status: Abandoned
Spud Date: 1950-01-09
Final Drill Date: 1950-03-01
Well Total Depth: 1245.10 m
Surface Hole Latitude: 53.965546
Surface Hole Longitude: -113.542574

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-12-16 Obtained License
1950-01-28 Drill Stem Test Performed
1950-01-30 Drill Stem Test Performed
1950-02-04 Drill Stem Test Performed
1950-02-06 Drill Stem Test Performed
1950-02-11 Drill Stem Test Performed
1950-02-16 Drill Stem Test Performed
1950-02-20 Drill Stem Test Performed
1950-02-25 Drill Stem Test Performed
1950-02-26 Production Casing Operation Performed
1950-03-01 Finished Drilling
1950-03-01 Perforation Treatment Performed - Open-Hole Completion
1950-03-01 Well Mode changed to Drilled and Cased
1953-02-13 Perforation Treatment Performed - Bullet Perforation
1953-02-13 Perforation Treatment Performed - Cement Plug
1983-07-23 Well Log Performed
1986-07-10 Perforation Treatment Performed - Cement Squeeze
1986-07-10 Plug Back Performed
1986-07-24 Perforation Treatment Performed - Jet Perforation
1986-11-20 Well Began Production
1986-11-20 Well Fluid changed to Gas
1986-11-20 Well Mode changed to Flowing
1993-03-18 Well Log Performed
1993-03-25 Perforation Treatment Performed - Cement Squeeze
1993-03-27 Well Log Performed
1993-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-28 Perforation Treatment Performed - Jet Perforation
1993-03-28 Plug Back Performed
1993-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-29 Perforation Treatment Performed - Jet Perforation
1994-12-31 Well Fluid changed to Gas
1994-12-31 Well Mode changed to Suspended
1999-02-18 Well Abandoned
1999-02-18 Well Fluid changed to Gas
1999-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-03-01 Open Hole/Barefoot Completion 1236.30 1245.10 0
1993-03-28 Perforation 1015.50 1016.50 17
1993-03-28 Packing Device Capped w/Cement 1005.50 1013.50 0
1993-03-29 Perforation 1002.60 1004.60 17
1993-03-29 Packing Device Capped w/Cement 993.50 1001.50 0
1953-02-13 Cement Plug 1175.60 1245.10 0
1953-02-13 Bullet Perforation 797.40 799.20 13
1953-02-13 Bullet Perforation 815.00 819.00 13
1986-07-10 Cement Squeeze 797.40 819.00 0
1986-07-24 Perforation 1018.00 1020.00 13
1986-07-24 Perforation 1020.80 1022.30 13
1993-03-25 Cement Squeeze 1018.00 1022.30 0
1993-03-28 Perforation 1014.00 1015.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 839 0.0 0.0 0.0
1987 2383 0.0 0.0 0.0
1988 3994 0.0 0.0 0.0
1989 4067 0.0 0.0 0.0
1990 1670 0.0 0.0 0.0
1992 1 0.0 0.0 0.0

For data sources see[5]

References