X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210507000

Well Details

Well ID: 0584210507000
Loading map...
Location: 00/07-05-058-21W4/0
Location Alias: 00/07-05-58-21 W4M
Location Alias 2: 00/07-05-058-21 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 05
County/Municipality: Thorhild County
Well Name: IMP REDWATER 7-5-58-21
Operator Name: Imperial Oil Resources Limited
License Number: 0000583
License Date: 1949-09-09
License Status: Abandoned
Spud Date: 1949-09-16
Final Drill Date: 1949-09-29
Well Total Depth: 996.70 m
Surface Hole Latitude: 53.983456
Surface Hole Longitude: -113.084396

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-09-09 Obtained License
1949-09-22 Drill Stem Test Performed
1949-09-26 Production Casing Operation Performed
1949-09-29 Finished Drilling
1949-09-29 Perforation Treatment Performed - Acid Wash - No Pressure
1949-09-29 Perforation Treatment Performed - Open-Hole Completion
1949-09-29 Well Mode changed to Drilled and Cased
1949-10-01 Well Began Production
1949-10-01 Well Fluid changed to Crude Oil
1949-10-01 Well Mode changed to Pumping
1956-08-04 Perforation Treatment Performed - Open-Hole Completion
1956-08-04 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1957-03-27 Perforation Treatment Performed - Open-Hole Completion
1957-03-27 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1957-08-09 Perforation Treatment Performed - Open-Hole Completion
1957-08-09 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1962-02-04 Perforation Treatment Performed - Open-Hole Completion
1962-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-02-09 Perforation Treatment Performed - Cement Plug
1962-02-09 Perforation Treatment Performed - Open-Hole Completion
1962-02-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1962-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-26 Perforation Treatment Performed - Open-Hole Completion
1963-09-28 Perforation Treatment Performed - Cement Squeeze
1963-10-03 Perforation Treatment Performed - Open-Hole Completion
1963-10-04 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-19 Perforation Treatment Performed - Cement Squeeze
1964-01-19 Well Abandoned
1964-01-19 Well Fluid changed to Crude Oil
1964-01-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-09-29 Open Hole/Barefoot Completion 980.20 996.70 0
1962-02-05 Acid Treatment 994.00 995.20 0
1962-02-09 Cement Plug 983.30 995.20 0
1962-02-09 Open Hole/Barefoot Completion 980.20 983.30 0
1962-02-13 Hydra Jet Perforation 982.10 983.00 0
1962-02-13 Acid Treatment 982.10 983.00 0
1963-09-26 Open Hole/Barefoot Completion 980.20 992.10 0
1963-09-28 Cement Squeeze 983.30 992.10 0
1963-10-03 Open Hole/Barefoot Completion 980.20 983.30 0
1963-10-04 Hydra Jet Perforation 968.00 968.00 0
1964-01-19 Cement Squeeze 968.00 983.30 0
1949-09-29 Acid Wash 980.20 996.70 0
1956-08-04 Resin-Gypsum Squeeze or Plug 989.40 996.70 0
1956-08-04 Open Hole/Barefoot Completion 980.20 989.40 0
1957-03-27 Resin-Gypsum Squeeze or Plug 987.60 989.40 0
1957-03-27 Open Hole/Barefoot Completion 980.20 987.60 0
1957-08-09 Resin-Gypsum Squeeze or Plug 985.10 987.60 0
1957-08-09 Open Hole/Barefoot Completion 980.20 985.10 0
1962-02-04 Open Hole/Barefoot Completion 980.20 995.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References