X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210606002

Well Details

Well ID: 0584210606002
Loading map...
Location: 00/06-06-058-21W4/2
Location Alias: 00/06-06-58-21 W4M
Location Alias 2: 00/06-06-058-21 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 06
County/Municipality: Thorhild County
Well Name: IMPERIAL EGREMONT NO 20
Operator Name: Imperial Oil Resources Limited
License Number: 0000781
License Date: 1949-10-22
License Status: Abandoned
Spud Date: 1949-10-30
Final Drill Date: 1949-11-18
Well Total Depth: 979.90 m
Surface Hole Latitude: 53.983482
Surface Hole Longitude: -113.115162

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-10-22 Obtained License
1949-11-05 Drill Stem Test Performed
1949-11-06 Drill Stem Test Performed
1949-11-07 Drill Stem Test Performed
1949-11-09 Drill Stem Test Performed
1949-11-10 Drill Stem Test Performed
1949-11-15 Production Casing Operation Performed
1949-11-18 Finished Drilling
1949-11-18 Perforation Treatment Performed - Acid Wash - No Pressure
1949-11-18 Perforation Treatment Performed - Open-Hole Completion
1949-11-18 Well Mode changed to Drilled and Cased
1971-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-09 Perforation Treatment Performed - Cement Plug
1972-11-09 Perforation Treatment Performed - Open-Hole Completion
1983-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-24 Plug Back Performed
1985-07-24 Well Log Performed
1985-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-25 Perforation Treatment Performed - Jet Perforation
1985-07-25 Well Log Performed
1985-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-30 Perforation Treatment Performed - Jet Perforation
1985-07-30 Plug Back Performed
1985-07-30 Well Log Performed
1985-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-03 Perforation Treatment Performed - Cement Squeeze
1985-09-03 Plug Back Performed
1985-09-04 Perforation Treatment Performed - Jet Perforation
1985-09-05 Perforation Treatment Performed - Cement Squeeze
1985-09-05 Plug Back Performed
1985-09-09 Perforation Treatment Performed - Jet Perforation
1985-09-09 Well Log Performed
1985-09-10 Well Began Production
1985-09-10 Well Fluid changed to Gas
1985-09-10 Well Mode changed to Flowing
1985-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-20 Well Fluid changed to Gas
1985-09-20 Well Mode changed to Abandoned Zone
1985-09-23 Perforation Treatment Performed - Jet Perforation
1985-09-23 Well Log Performed
1985-10-08 Perforation Treatment Performed - Fractured
1985-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-07 Plug Back Performed
1996-04-21 Perforation Treatment Performed - Jet Perforation
1996-06-04 Perforation Treatment Performed - Remedial Casing
1996-06-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-18 Open Hole/Barefoot Completion 933.30 979.90 0
1985-07-25 Perforation 686.50 689.00 13
1985-07-25 Acid Treatment 682.50 689.00 0
1985-07-30 Packing Device Capped w/Cement 667.00 675.00 0
1985-07-30 Perforation 648.00 652.50 13
1985-07-31 Acid Treatment 648.00 652.50 0
1985-09-03 Cement Squeeze 648.00 652.50 0
1985-09-04 Perforation 682.50 685.00 13
1985-09-04 Perforation 686.50 689.00 13
1985-09-05 Cement Squeeze 682.50 689.00 0
1985-09-09 Perforation 725.00 728.00 13
1949-11-18 Acid Wash 933.30 979.90 0
1985-09-20 Packing Device Capped w/Cement 631.00 639.00 0
1985-09-23 Perforation 594.30 596.30 13
1985-10-08 Fracture 594.30 596.30 0
1985-12-23 Acid Treatment 594.30 596.30 0
1996-03-07 Packing Device Capped w/Cement 572.00 580.00 0
1996-04-21 Perforation 210.00 211.00 13
1996-06-04 Remedial Casing Cementing 210.00 211.00 0
1971-09-11 Acid Treatment 933.30 979.90 0
1972-11-09 Cement Plug 949.50 979.90 0
1972-11-09 Open Hole/Barefoot Completion 933.30 949.50 0
1983-01-17 Acid Treatment 933.30 939.40 0
1983-11-09 Acid Treatment 933.30 939.40 0
1985-07-24 Packing Device Capped w/Cement 920.00 928.00 0
1985-07-25 Perforation 682.50 685.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 31 0.0 0.0 0.0

For data sources see[5]

References