X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584210803000

Well Details

Well ID: 0584210803000
Loading map...
Location: 00/03-08-058-21W4/0
Location Alias: 00/03-08-58-21 W4M
Location Alias 2: 00/03-08-058-21 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 21
Section: 08
County/Municipality: Thorhild County
Well Name: ESSO REDWATER B-7
Operator Name: Imperial Oil Resources Limited
License Number: 0000713
License Date: 1949-10-05
License Status: RecCertified
Spud Date: 1949-10-24
Final Drill Date: 1949-11-09
Well Total Depth: 1000.70 m
Surface Hole Latitude: 53.994291
Surface Hole Longitude: -113.090405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-10-05 Obtained License
1949-11-04 Production Casing Operation Performed
1949-11-08 Well Mode changed to Drilled and Cased
1949-11-09 Finished Drilling
1949-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-11-09 Perforation Treatment Performed - Open-Hole Completion
1949-11-09 Well Began Production
1949-11-09 Well Fluid changed to Crude Oil
1949-11-09 Well Mode changed to Flowing
1950-10-20 Well Fluid changed to Crude Oil
1950-10-20 Well Mode changed to Pumping
1980-01-01 Well Fluid changed to Crude Oil
1980-01-01 Well Mode changed to Suspended
1993-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-27 Plug Back Performed
1993-07-27 Well Fluid changed to Crude Oil
1993-07-27 Well Mode changed to Abandoned Zone
1996-05-15 Perforation Treatment Performed - Jet Perforation
1996-06-01 Perforation Treatment Performed - Remedial Casing
1996-07-08 Well Abandoned
1996-07-08 Well Fluid changed to Crude Oil
1996-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-09 Open Hole/Barefoot Completion 987.20 1000.70 0
1949-11-09 Acid Treatment 987.20 1000.70 0
1993-07-27 Packing Device Capped w/Cement 969.30 981.00 0
1996-05-15 Perforation 184.50 185.50 13
1996-06-01 Remedial Casing Cementing 184.50 185.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6083 0.0 0.0 0.0
1968 6997 0.0 0.0 0.0
1969 7957 0.0 0.0 0.0
1970 8285 0.0 0.0 0.0
1971 8437 0.0 0.0 0.0
1972 8326 0.0 0.0 0.0
1973 7889 0.0 0.0 0.0
1974 8198 0.0 0.0 0.0
1975 8323 0.0 0.0 0.0
1976 8066 0.0 0.0 0.0
1977 7295 0.0 0.0 0.0
1978 4424 0.0 0.0 0.0

For data sources see[5]

References