X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221209000

Well Details

Well ID: 0584221209000
Loading map...
Location: 00/09-12-058-22W4/0
Location Alias: 00/09-12-58-22 W4M
Location Alias 2: 00/09-12-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 12
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 9-12-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001705
License Date: 1950-07-05
License Status: Issued
Spud Date: 1950-08-06
Final Drill Date: 1950-08-15
Well Total Depth: 1005.20 m
Surface Hole Latitude: 54.001525
Surface Hole Longitude: -113.127779

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-07-05 Obtained License
1950-08-12 Production Casing Operation Performed
1950-08-15 Finished Drilling
1950-08-15 Perforation Treatment Performed - Open-Hole Completion
1950-08-15 Well Mode changed to Drilled and Cased
1950-08-17 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-17 Well Began Production
1950-08-17 Well Fluid changed to Crude Oil
1950-08-17 Well Mode changed to Flowing
1950-12-15 Well Fluid changed to Crude Oil
1950-12-15 Well Mode changed to Pumping
1985-02-26 Perforation Treatment Performed - Cement Plug
1985-02-26 Perforation Treatment Performed - Open-Hole Completion
1986-07-10 Perforation Treatment Performed - Cement Plug
1986-07-14 Perforation Treatment Performed - Jet Perforation
1986-07-15 Perforation Treatment Performed - Acid Wash - No Pressure

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-15 Open Hole/Barefoot Completion 969.00 987.60 0
1950-08-17 Acid Wash 969.00 987.60 0
1985-02-26 Cement Plug 977.50 987.60 0
1985-02-26 Open Hole/Barefoot Completion 969.00 977.50 0
1986-07-10 Cement Plug 969.00 977.50 0
1986-07-14 Perforation 969.00 974.50 13
1986-07-15 Acid Wash 969.00 974.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7340 0.0 0.0 0.0
1968 7554 0.0 0.0 0.0
1969 8383 0.0 0.0 0.0
1970 7932 0.0 0.0 0.0
1971 7353 0.0 0.0 0.0
1972 6188 0.0 0.0 0.0
1973 7623 0.0 0.0 0.0
1974 6830 0.0 0.0 0.0
1975 3011 0.0 0.0 0.0
1976 4208 0.0 0.0 0.0
1977 6873 0.0 0.0 0.0
1978 8061 0.0 0.0 0.0
1979 8407 0.0 0.0 0.0
1980 8061 0.0 0.0 0.0
1981 8577 0.0 0.0 0.0
1982 7969 0.0 0.0 0.0
1983 8446 0.0 0.0 0.0
1984 8564 0.0 0.0 0.0
1985 8663 0.0 0.0 0.0
1986 8346 0.0 0.0 0.0
1987 8637 0.0 0.0 0.0
1988 8247 0.0 0.0 0.0
1989 8489 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 8516 0.0 0.0 0.0
1992 7696 0.0 0.0 0.0
1993 8315 0.0 0.0 0.0
1994 8014 0.0 0.0 0.0
1995 8567 0.0 0.0 0.0
1996 8744 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8439 0.0 0.0 0.0
1999 8323 0.0 0.0 0.0
2000 8766 0.0 0.0 0.0
2001 8592 0.0 0.0 0.0
2002 8330 0.0 0.0 0.0
2003 8666 0.0 0.0 0.0
2004 8644 0.0 0.0 0.0
2005 8332 0.0 0.0 0.0
2006 8673 0.0 0.0 0.0
2007 8695 0.0 0.0 0.0
2008 7749 0.0 0.0 0.0
2009 8221 0.0 0.0 0.0
2010 8655 0.0 0.0 0.0
2011 8632 0.0 0.0 0.0
2012 8703 0.0 0.0 0.0
2013 8085 0.0 0.0 0.0
2014 6571 0.0 0.0 0.0
2015 7881 0.0 0.0 0.0
2016 7915 0.0 0.0 0.0
2017 8723 0.0 0.0 0.0
2018 7734 0.0 0.0 0.0

For data sources see[5]

References