X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221302000

Well Details

Well ID: 0584221302000
Loading map...
Location: 00/02-13-058-22W4/0
Location Alias: 00/02-13-58-22 W4M
Location Alias 2: 00/02-13-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 13
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 2-13-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002476
License Date: 1950-12-27
License Status: Suspension
Spud Date: 1951-04-14
Final Drill Date: 1951-04-23
Well Total Depth: 995.20 m
Surface Hole Latitude: 54.008962
Surface Hole Longitude: -113.133928

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-27 Obtained License
1951-04-21 Production Casing Operation Performed
1951-04-23 Finished Drilling
1951-04-23 Perforation Treatment Performed - Acid Wash - No Pressure
1951-04-23 Perforation Treatment Performed - Open-Hole Completion
1951-04-23 Well Mode changed to Drilled and Cased
1951-04-26 Well Began Production
1951-04-26 Well Fluid changed to Crude Oil
1951-04-26 Well Mode changed to Flowing
1951-06-17 Well Fluid changed to Crude Oil
1951-06-17 Well Mode changed to Pumping
1982-11-10 Perforation Treatment Performed - Cement Plug
1982-11-10 Perforation Treatment Performed - Open-Hole Completion
1986-07-09 Perforation Treatment Performed - Cement Plug
1986-07-10 Perforation Treatment Performed - Jet Perforation
1988-10-19 Well Fluid changed to Crude Oil
1988-10-19 Well Mode changed to Suspended
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Pumping
2003-03-01 Well Fluid changed to Crude Oil
2003-03-01 Well Mode changed to Suspended
2009-02-24 Well Fluid changed to Crude Oil
2009-02-24 Well Mode changed to Pumping
2017-10-01 Well Fluid changed to Crude Oil
2017-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-23 Open Hole/Barefoot Completion 976.00 995.20 0
1951-04-23 Acid Wash 976.00 995.20 0
1982-11-10 Cement Plug 977.80 995.20 0
1982-11-10 Open Hole/Barefoot Completion 976.00 977.80 0
1986-07-09 Cement Plug 975.10 977.80 0
1986-07-10 Perforation 973.30 974.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1973 2237 0.0 0.0 0.0
1974 8236 0.0 0.0 0.0
1975 730 0.0 0.0 0.0
1982 1554 0.0 0.0 0.0
1983 8454 0.0 0.0 0.0
1984 7737 0.0 0.0 0.0
1985 8732 0.0 0.0 0.0
1986 7492 0.0 0.0 0.0
1987 8679 0.0 0.0 0.0
1988 3190 0.0 0.0 0.0
1996 1320 0.0 0.0 0.0
1997 8613 0.0 0.0 0.0
1998 8460 0.0 0.0 0.0
1999 8293 0.0 0.0 0.0
2000 8189 0.0 0.0 0.0
2001 8588 0.0 0.0 0.0
2002 7768 0.0 0.0 0.0
2009 7154 0.0 0.0 0.0
2010 8515 0.0 0.0 0.0
2011 8684 0.0 0.0 0.0
2012 7708 0.0 0.0 0.0
2013 8159 0.0 0.0 0.0
2014 6463 0.0 0.0 0.0
2015 7922 0.0 0.0 0.0
2016 7561 0.0 0.0 0.0

For data sources see[5]

References