X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221408000

Well Details

Well ID: 0584221408000
Loading map...
Location: 00/08-14-058-22W4/0
Location Alias: 00/08-14-58-22 W4M
Location Alias 2: 00/08-14-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 14
County/Municipality: Thorhild County
Well Name: IMPERIAL EGREMONT NO. 58
Operator Name: Imperial Oil Resources Limited
License Number: 0001573
License Date: 1950-06-06
License Status: Abandoned
Spud Date: 1950-06-16
Final Drill Date: 1950-06-27
Well Total Depth: 990.60 m
Surface Hole Latitude: 54.012633
Surface Hole Longitude: -113.152459

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-06 Obtained License
1950-06-25 Production Casing Operation Performed
1950-06-27 Finished Drilling
1950-06-27 Perforation Treatment Performed - Acid Wash - No Pressure
1950-06-27 Perforation Treatment Performed - Open-Hole Completion
1950-06-27 Well Mode changed to Drilled and Cased
1950-06-28 Well Began Production
1950-06-28 Well Fluid changed to Crude Oil
1950-06-28 Well Mode changed to Flowing
1951-01-26 Well Fluid changed to Crude Oil
1951-01-26 Well Mode changed to Pumping
1985-01-22 Well Log Performed
1985-01-24 Perforation Treatment Performed - Cement Plug
1985-01-24 Perforation Treatment Performed - Open-Hole Completion
1987-03-30 Perforation Treatment Performed - Cement Plug
1987-03-30 Well Log Performed
1987-07-14 Perforation Treatment Performed - Open-Hole Completion
1987-07-15 Well Log Performed
1993-01-06 Well Fluid changed to Crude Oil
1993-01-06 Well Mode changed to Suspended
1995-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-07 Perforation Treatment Performed - Jet Perforation
1995-03-07 Plug Back Performed
1995-03-07 Well Log Performed
1995-04-25 Perforation Treatment Performed - Remedial Casing
1995-04-25 Well Fluid changed to Crude Oil
1995-04-25 Well Mode changed to Abandoned
1995-04-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-06-27 Open Hole/Barefoot Completion 975.40 990.60 0
1950-06-27 Acid Wash 975.40 990.60 0
1985-01-24 Cement Plug 982.30 990.60 0
1985-01-24 Open Hole/Barefoot Completion 975.40 982.30 0
1987-03-30 Cement Plug 980.80 982.30 0
1987-07-14 Open Hole/Barefoot Completion 975.40 980.80 0
1995-03-07 Packing Device Capped w/Cement 963.00 971.00 0
1995-03-07 Perforation 218.00 219.00 13
1995-04-25 Remedial Casing Cementing 218.00 219.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1974 3222 0.0 0.0 0.0
1975 8069 0.0 0.0 0.0
1976 8245 0.0 0.0 0.0
1977 7161 0.0 0.0 0.0
1978 7314 0.0 0.0 0.0
1979 8443 0.0 0.0 0.0
1980 8492 0.0 0.0 0.0
1981 8565 0.0 0.0 0.0
1982 7914 0.0 0.0 0.0
1983 8482 0.0 0.0 0.0
1984 8467 0.0 0.0 0.0
1985 8597 0.0 0.0 0.0
1986 8589 0.0 0.0 0.0
1987 7265 0.0 0.0 0.0
1988 7900 0.0 0.0 0.0
1989 8335 0.0 0.0 0.0
1990 8501 0.0 0.0 0.0
1991 8684 0.0 0.0 0.0
1992 8240 0.0 0.0 0.0
1993 132 0.0 0.0 0.0

For data sources see[5]

References