X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221602000

Well Details

Well ID: 0584221602000
Loading map...
Location: 00/02-16-058-22W4/0
Location Alias: 00/02-16-58-22 W4M
Location Alias 2: 00/02-16-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 16
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 2-16-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0001548
License Date: 1950-06-01
License Status: Issued
Spud Date: 1950-05-29
Final Drill Date: 1950-06-10
Well Total Depth: 994.30 m
Surface Hole Latitude: 54.009068
Surface Hole Longitude: -113.208143

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-01 Obtained License
1950-06-07 Production Casing Operation Performed
1950-06-10 Finished Drilling
1950-06-10 Perforation Treatment Performed - Acid Wash - No Pressure
1950-06-10 Perforation Treatment Performed - Open-Hole Completion
1950-06-10 Well Mode changed to Drilled and Cased
1950-06-11 Well Began Production
1950-06-11 Well Fluid changed to Crude Oil
1950-06-11 Well Mode changed to Flowing
1950-10-16 Well Fluid changed to Crude Oil
1950-10-16 Well Mode changed to Pumping
1962-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-12 Perforation Treatment Performed - Cement Squeeze
1962-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-14 Perforation Treatment Performed - Bullet Perforation
1962-04-25 Perforation Treatment Performed - Open-Hole Completion
1962-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-23 Well Fluid changed to Crude Oil
1973-07-23 Well Mode changed to Suspended
1993-11-21 Well Fluid changed to Crude Oil
1993-11-21 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-06-10 Open Hole/Barefoot Completion 983.00 994.30 0
1950-06-10 Acid Wash 983.00 994.30 0
1962-03-12 Acid Treatment 983.30 994.30 0
1962-03-12 Cement Squeeze 983.30 994.30 0
1962-03-14 Bullet Perforation 981.80 982.70 13
1962-03-14 Acid Treatment 981.80 982.70 0
1962-04-25 Open Hole/Barefoot Completion 983.00 985.10 0
1962-04-26 Acid Treatment 983.90 984.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8724 0.0 0.0 0.0
1968 8723 0.0 0.0 0.0
1969 8619 0.0 0.0 0.0
1970 8666 0.0 0.0 0.0
1971 8592 0.0 0.0 0.0
1972 8587 0.0 0.0 0.0
1973 4197 0.0 0.0 0.0
1993 1041 0.0 0.0 0.0
1994 7643 0.0 0.0 0.0
1995 7982 0.0 0.0 0.0
1996 8742 0.0 0.0 0.0
1997 8457 0.0 0.0 0.0
1998 8261 0.0 0.0 0.0
1999 8406 0.0 0.0 0.0
2000 8770 0.0 0.0 0.0
2001 8699 0.0 0.0 0.0
2002 8323 0.0 0.0 0.0
2003 8526 0.0 0.0 0.0
2004 8602 0.0 0.0 0.0
2005 8186 0.0 0.0 0.0
2006 8549 0.0 0.0 0.0
2007 8091 0.0 0.0 0.0
2008 8103 0.0 0.0 0.0
2009 8649 0.0 0.0 0.0
2010 8639 0.0 0.0 0.0
2011 8255 0.0 0.0 0.0
2012 8688 0.0 0.0 0.0
2013 7877 0.0 0.0 0.0
2014 3607 0.0 0.0 0.0
2015 1531 0.0 0.0 0.0
2016 8012 0.0 0.0 0.0
2017 8668 0.0 0.0 0.0
2018 8092 0.0 0.0 0.0
2019 7204 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[5]

References