X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222005000

Well Details

Well ID: 0584222005000
Loading map...
Location: 00/05-20-058-22W4/0
Location Alias: 00/05-20-58-22 W4M
Location Alias 2: 00/05-20-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 20
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 5-20-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0002345
License Date: 1950-11-23
License Status: Suspension
Spud Date: 1950-11-29
Final Drill Date: 1950-12-15
Well Total Depth: 987.90 m
Surface Hole Latitude: 54.027135
Surface Hole Longitude: -113.244366

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-23 Obtained License
1950-12-12 Production Casing Operation Performed
1950-12-15 Finished Drilling
1950-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-15 Perforation Treatment Performed - Open-Hole Completion
1950-12-15 Well Mode changed to Drilled and Cased
1950-12-16 Well Began Production
1950-12-16 Well Fluid changed to Crude Oil
1950-12-16 Well Mode changed to Flowing
1951-02-05 Well Fluid changed to Crude Oil
1951-02-05 Well Mode changed to Pumping
1955-10-21 Perforation Treatment Performed - Open-Hole Completion
1955-10-21 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1961-10-25 Perforation Treatment Performed - Open-Hole Completion
1961-10-25 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1964-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-10 Perforation Treatment Performed - Cement Plug
1983-02-10 Perforation Treatment Performed - Open-Hole Completion
1987-09-28 Well Log Performed
2003-03-01 Well Fluid changed to Crude Oil
2003-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-15 Open Hole/Barefoot Completion 974.80 987.90 0
1950-12-15 Acid Treatment 974.80 987.90 0
1955-10-21 Resin-Gypsum Squeeze or Plug 983.00 987.90 0
1955-10-21 Open Hole/Barefoot Completion 974.80 983.00 0
1961-10-25 Resin-Gypsum Squeeze or Plug 978.70 983.00 0
1961-10-25 Open Hole/Barefoot Completion 974.80 978.70 0
1964-05-19 Acid Treatment 976.30 978.70 0
1983-02-10 Cement Plug 978.50 978.70 0
1983-02-10 Open Hole/Barefoot Completion 974.80 978.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 2798 0.0 0.0 0.0
1984 8126 0.0 0.0 0.0
1985 8053 0.0 0.0 0.0
1986 7332 0.0 0.0 0.0
1987 7735 0.0 0.0 0.0
1988 7706 0.0 0.0 0.0
1989 8059 0.0 0.0 0.0
1990 8433 0.0 0.0 0.0
1991 8702 0.0 0.0 0.0
1992 6254 0.0 0.0 0.0
1993 8226 0.0 0.0 0.0
1994 8378 0.0 0.0 0.0
1995 8709 0.0 0.0 0.0
1996 8737 0.0 0.0 0.0
1997 8534 0.0 0.0 0.0
1998 7562 0.0 0.0 0.0
1999 8324 0.0 0.0 0.0
2000 6811 0.0 0.0 0.0
2001 8079 0.0 0.0 0.0
2002 557 0.0 0.0 0.0

For data sources see[5]

References