X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222108000

Well Details

Well ID: 0584222108000
Loading map...
Location: 00/08-21-058-22W4/0
Location Alias: 00/08-21-58-22 W4M
Location Alias 2: 00/08-21-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 21
County/Municipality: Thorhild County
Well Name: IMPERIAL OPAL NO. 16
Operator Name: Imperial Oil Resources Limited
License Number: 0001464
License Date: 1950-05-13
License Status: RecCertified
Spud Date: 1950-05-21
Final Drill Date: 1950-05-29
Well Total Depth: 993.60 m
Surface Hole Latitude: 54.027145
Surface Hole Longitude: -113.201985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-13 Obtained License
1950-05-27 Intermediate Casing Operation Performed
1950-05-29 Finished Drilling
1950-05-29 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-29 Perforation Treatment Performed - Open-Hole Completion
1950-05-29 Well Mode changed to Drilled and Cased
1950-05-30 Well Began Production
1950-05-30 Well Fluid changed to Crude Oil
1950-05-30 Well Mode changed to Flowing
1950-06-04 Perforation Treatment Performed - Cement Plug
1950-06-04 Perforation Treatment Performed - Open-Hole Completion
1951-12-09 Well Fluid changed to Crude Oil
1951-12-09 Well Mode changed to Pumping
1961-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-15 Perforation Treatment Performed - Jet Perforation
1962-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-28 Perforation Treatment Performed - Open-Hole Completion
1963-03-28 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1963-04-05 Perforation Treatment Performed - Open-Hole Completion
1963-04-05 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1964-08-04 Liner Casing Operation Performed
1964-08-04 Perforation Treatment Performed - Cement Squeeze
1964-08-04 Perforation Treatment Performed - Open-Hole Completion
1964-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-05 Perforation Treatment Performed - Jet Perforation
1964-08-05 Perforation Treatment Performed - Selective Jet Perforations
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Suspended
1984-08-16 Well Fluid changed to Crude Oil
1984-08-16 Well Mode changed to Pumping
1985-02-19 Perforation Treatment Performed - Cement Squeeze
1985-02-20 Perforation Treatment Performed - Jet Perforation
1985-02-21 Well Log Performed
1986-07-01 Well Fluid changed to Crude Oil
1986-07-01 Well Mode changed to Suspended
1994-08-24 Perforation Treatment Performed - Jet Perforation
1994-08-24 Well Log Performed
1994-10-01 Well Fluid changed to Crude Oil
1994-10-01 Well Mode changed to Pumping
1995-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-13 Plug Back Performed
1995-04-13 Well Log Performed
1995-05-01 Perforation Treatment Performed - Cement Plug
1995-05-01 Well Fluid changed to Crude Oil
1995-05-01 Well Mode changed to Abandoned Zone
1995-05-18 Well Abandoned
1995-05-18 Well Fluid changed to Crude Oil
1995-05-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-05-29 Open Hole/Barefoot Completion 976.00 993.60 0
1963-04-05 Resin-Gypsum Squeeze or Plug 979.00 981.50 0
1963-04-05 Open Hole/Barefoot Completion 976.00 979.00 0
1964-08-04 Open Hole/Barefoot Completion 976.00 993.60 0
1964-08-04 Cement Squeeze 976.00 993.60 0
1964-08-05 Perforation 978.40 979.00 7
1964-08-05 Perforation 976.90 977.50 7
1964-08-05 Selective Jet Perforations 975.70 975.70 0
1964-08-05 Acid Treatment 975.70 979.00 0
1985-02-19 Cement Squeeze 975.70 979.00 0
1985-02-20 Perforation 977.60 979.60 7
1950-05-29 Acid Wash 976.00 993.60 0
1994-08-24 Perforation 974.60 978.20 13
1995-04-13 Packing Device Capped w/Cement 912.00 920.00 0
1995-05-01 Cement Plug 558.00 830.00 0
1950-06-04 Cement Plug 986.30 993.60 0
1950-06-04 Open Hole/Barefoot Completion 976.00 986.30 0
1961-12-29 Acid Treatment 976.00 979.60 0
1962-05-15 Perforation 978.10 979.60 7
1962-05-28 Acid Treatment 977.20 979.60 0
1963-03-28 Resin-Gypsum Squeeze or Plug 981.50 986.30 0
1963-03-28 Open Hole/Barefoot Completion 976.00 981.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1984 2140 0.0 0.0 0.0
1985 6729 0.0 0.0 0.0
1994 1464 0.0 0.0 0.0

For data sources see[5]

References