X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222902002

Well Details

Well ID: 0584222902002
Loading map...
Location: 00/02-29-058-22W4/2
Location Alias: 00/02-29-58-22 W4M
Location Alias 2: 00/02-29-058-22 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 29
County/Municipality: Thorhild County
Well Name: ACCEL HOLDINGS REDWATER 2-29-58-22
Operator Name: ACCEL Canada Holdings Limited
License Number: 0003937
License Date: 1951-12-13
License Status: Abandoned
Spud Date: 1952-02-05
Final Drill Date: 1952-02-20
Well Total Depth: 1006.80 m
Surface Hole Latitude: 54.037701
Surface Hole Longitude: -113.232943

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-13 Obtained License
1952-02-20 Finished Drilling
1952-02-20 Well Mode changed to Drilled and Cased
1952-02-21 Production Casing Operation Performed
1952-02-23 Drill Stem Test Performed
1952-02-23 Perforation Treatment Performed - Cement Squeeze
1952-02-23 Perforation Treatment Performed - Jet Perforation
1952-02-25 Perforation Treatment Performed - Bullet Perforation
1952-02-27 Perforation Treatment Performed - Cement Squeeze
1952-02-28 Drill Stem Test Performed
1952-02-28 Perforation Treatment Performed - Bullet Perforation
1952-02-28 Perforation Treatment Performed - Cement Squeeze
1952-02-29 Drill Stem Test Performed
1952-03-01 Perforation Treatment Performed - Jet Perforation
1952-03-03 Drill Stem Test Performed
1952-03-03 Perforation Treatment Performed - Cement Squeeze
1952-03-04 Perforation Treatment Performed - Acid Wash - No Pressure
1952-03-04 Perforation Treatment Performed - Open-Hole Completion
1953-09-11 Perforation Treatment Performed - Cement Plug
1953-09-11 Perforation Treatment Performed - Open-Hole Completion
1953-09-19 Perforation Treatment Performed - Jet Perforation
1953-09-20 Perforation Treatment Performed - Acid Wash - No Pressure
1965-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-11-17 Plug Back Performed
1965-11-18 Perforation Treatment Performed - Bullet Perforation
1966-06-10 Well Began Production
1966-06-10 Well Fluid changed to Gas
1966-06-10 Well Mode changed to Flowing
1969-02-04 Well Fluid changed to Gas
1969-02-04 Well Mode changed to Suspended
1970-01-23 Well Began Injection
1970-01-23 Well Fluid changed to Gas
1970-01-23 Well Type changed to Injection
1970-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-01 Well Fluid changed to Gas
1972-02-01 Well Type changed to Injection
1972-12-27 Perforation Treatment Performed - Jet Perforation
1972-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-01 Well Fluid changed to Gas
1976-01-01 Well Mode changed to Suspended
1976-01-01 Well Type changed to Injection
1997-05-05 Perforation Treatment Performed - Cement Squeeze
1997-05-05 Plug Back Performed
1997-05-05 Well Fluid changed to Gas
1997-05-05 Well Mode changed to Abandoned Zone
1997-05-05 Well Type changed to Injection
2002-12-01 Perforation Treatment Performed - Cement Plug
2002-12-01 Plug Back Performed
2002-12-02 Perforation Treatment Performed - Jet Perforation
2002-12-02 Well Log Performed
2002-12-03 Perforation Treatment Performed - Remedial Casing
2004-06-16 Well Log Performed
2004-06-18 Perforation Treatment Performed - Cement Plug
2004-06-18 Perforation Treatment Performed - Jet Perforation
2004-06-18 Perforation Treatment Performed - Remedial Casing
2004-06-22 Perforation Treatment Performed - Jet Perforation
2004-06-22 Well Log Performed
2004-06-23 Perforation Treatment Performed - Cement Plug
2004-06-23 Perforation Treatment Performed - Remedial Casing
2004-11-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-23 Perforation 821.10 823.60 7
1952-03-04 Acid Wash 995.80 1006.80 0
1953-09-11 Cement Plug 1001.30 1006.80 0
1953-09-11 Open Hole/Barefoot Completion 995.80 1001.30 0
1953-09-19 Perforation 996.10 999.10 23
1953-09-20 Acid Wash 996.10 999.10 0
1965-11-17 Packing Device Capped w/Cement 835.20 1001.30 0
1965-11-18 Bullet Perforation 828.10 830.30 3
1970-02-26 Acid Treatment 828.10 830.30 0
1970-12-11 Acid Treatment 828.10 830.30 0
1972-12-27 Perforation 821.10 823.60 13
1952-02-23 Cement Squeeze 821.10 823.60 0
1972-12-28 Acid Treatment 821.10 830.30 0
1997-05-05 Cement Squeeze 828.10 830.30 0
1997-05-05 Cement Squeeze 821.10 823.60 0
2002-12-01 Cement Plug 825.00 999.40 0
2002-12-02 Perforation 215.00 216.00 13
2002-12-03 Remedial Casing Cementing 215.00 216.00 0
2004-06-18 Perforation 215.00 216.00 20
2004-06-18 Remedial Casing Cementing 215.00 216.00 0
2004-06-18 Cement Plug 201.00 212.40 0
2004-06-22 Perforation 190.00 191.00 20
1952-02-25 Bullet Perforation 827.80 832.10 7
2004-06-23 Remedial Casing Cementing 190.00 191.00 0
2004-06-23 Cement Plug 175.50 184.70 0
1952-02-27 Cement Squeeze 827.80 832.10 0
1952-02-28 Bullet Perforation 837.60 842.20 0
1952-02-28 Cement Squeeze 837.60 842.20 0
1952-03-01 Perforation 844.30 848.00 13
1952-03-03 Cement Squeeze 844.30 848.00 0
1952-03-04 Open Hole/Barefoot Completion 995.80 1006.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1970 607 0.0 0.0 0.0
1971 96 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References