X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584222903002

Well Details

Well ID: 0584222903002
Loading map...
Location: 00/03-29-058-22W4/2
Location Alias: 00/03-29-58-22 W4M
Location Alias 2: 00/03-29-058-22 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 29
County/Municipality: Thorhild County
Well Name: IMP OPAL 46 REDW IN 3-29-58-22
Operator Name: Imperial Oil Resources Limited
License Number: 0004301
License Date: 1952-03-03
License Status: RecCertified
Spud Date: 1952-03-19
Final Drill Date: 1952-03-30
Well Total Depth: 1015.60 m
Surface Hole Latitude: 54.038149
Surface Hole Longitude: -113.238845

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-03 Obtained License
1952-03-25 Drill Stem Test Performed
1952-03-26 Drill Stem Test Performed
1952-03-30 Finished Drilling
1952-03-31 Production Casing Operation Performed
1952-04-17 Perforation Treatment Performed - Jet Perforation
1952-04-18 Perforation Treatment Performed - Acid Wash - No Pressure
1952-09-17 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1952-09-18 Perforation Treatment Performed - Bullet Perforation
1952-10-29 Perforation Treatment Performed - Cement Squeeze
1955-10-10 Perforation Treatment Performed - Jet Perforation
1955-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-11-25 Well Mode changed to Drilled and Cased
1958-10-22 Well Began Production
1958-10-22 Well Fluid changed to Gas
1958-10-22 Well Mode changed to Flowing
1959-11-04 Well Fluid changed to Gas
1959-11-04 Well Mode changed to Suspended
1962-09-18 Well Fluid changed to Gas
1962-09-18 Well Mode changed to Flowing
1963-06-12 Perforation Treatment Performed - Cement Squeeze
1963-06-17 Perforation Treatment Performed - Jet Perforation
1964-03-09 Perforation Treatment Performed - Cement Squeeze
1964-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-16 Perforation Treatment Performed - Bullet Perforation
1964-03-16 Well Log Performed
1965-01-22 Well Fluid changed to Gas
1965-01-22 Well Mode changed to Suspended
1967-11-01 Well Began Injection
1967-11-01 Well Fluid changed to Water
1967-11-01 Well Type changed to Disposal
1970-03-11 Well Fluid changed to Water
1970-03-11 Well Mode changed to Suspended
1970-03-11 Well Type changed to Disposal
1970-12-04 Well Fluid changed to Gas
1970-12-04 Well Type changed to Injection
1970-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-07 Well Fluid changed to Gas
1972-02-07 Well Mode changed to Suspended
1972-02-07 Well Type changed to Injection
1973-12-30 Perforation Treatment Performed - Cement Squeeze
1973-12-30 Well Fluid changed to Gas
1973-12-30 Well Mode changed to Abandoned Zone
1973-12-30 Well Type changed to Injection
1974-01-14 Perforation Treatment Performed - Jet Perforation
1974-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-26 Perforation Treatment Performed - Jet Perforation
1995-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-08 Perforation Treatment Performed - Jet Perforation
1995-03-08 Plug Back Performed
1995-03-08 Well Log Performed
1995-04-25 Perforation Treatment Performed - Remedial Casing
1995-04-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-17 Perforation 1011.90 1013.80 13
1964-03-09 Cement Squeeze 833.90 835.80 0
1964-03-16 Bullet Perforation 833.90 834.50 7
1964-03-16 Acid Treatment 833.90 834.50 0
1970-12-15 Acid Treatment 833.90 834.50 0
1973-12-30 Cement Squeeze 833.90 834.50 0
1974-01-14 Perforation 1012.50 1015.60 7
1974-01-15 Acid Treatment 1012.50 1015.60 0
1980-02-11 Packing Device Capped w/Cement 814.00 821.00 0
1980-02-26 Perforation 508.00 511.00 3
1980-02-26 Acid Treatment 508.00 511.00 0
1952-04-18 Acid Wash 1011.90 1013.80 0
1995-03-08 Packing Device Capped w/Cement 492.00 500.00 0
1995-03-08 Perforation 215.00 216.00 13
1995-04-25 Remedial Casing Cementing 215.00 216.00 0
1952-09-17 Resin-Gypsum Squeeze or Plug 1012.50 1015.60 0
1952-09-18 Bullet Perforation 1011.90 1012.50 13
1952-10-29 Cement Squeeze 1011.90 1012.50 0
1955-10-10 Perforation 833.90 838.80 13
1955-10-11 Acid Treatment 833.90 838.80 0
1963-06-12 Cement Squeeze 833.90 838.80 0
1963-06-17 Perforation 833.90 835.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0

For data sources see[5]

References