X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584230105030

Well Details

Well ID: 0584230105030
Loading map...
Location: 03/05-01-058-23W4/0
Location Alias: 03/05-01-58-23 W4M
Location Alias 2: 03/05-01-058-23 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 23
Section: 01
County/Municipality: Sturgeon County
Well Name: WESTFIRE HZ 103 REDWATER 5-1-58-23
Operator Name: Long Run Exploration Ltd.
License Number: 0444609
License Date: 2012-03-01
License Status: Suspension
Spud Date: 2012-04-03
Final Drill Date: 2012-04-06
Well Total Depth: 1471.00 m
Surface Hole Latitude: 53.977465
Surface Hole Longitude: -113.293337

For data sources see[1][2]

Well History

Date Event
2012-03-01 Obtained License
2012-04-03 Well Log Performed
2012-04-04 Direction Drilling Operation Performed - Horizontal
2012-04-04 Surface Casing Operation Performed
2012-04-06 Finished Drilling
2012-04-06 Well Mode changed to Drilled and Cased
2012-04-07 Production Casing Operation Performed
2012-04-07 Rig Released
2012-04-13 Well Log Performed
2012-04-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-09 Well Began Production
2012-05-09 Well Fluid changed to Crude Oil
2012-05-09 Well Mode changed to Pumping
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-03 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-04 428.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-26 Multi-Stage Fracture 1455.70 1455.90 0
2012-04-26 Multi-Stage Fracture 1167.00 1167.20 0
2012-04-26 Multi-Stage Fracture 1132.80 1133.00 0
2012-04-26 Multi-Stage Fracture 1099.30 1099.50 0
2012-04-26 Multi-Stage Fracture 1064.70 1064.90 0
2012-04-26 Multi-Stage Fracture 1041.80 1042.00 0
2012-04-26 Multi-Stage Fracture 1019.00 1019.20 0
2012-04-26 Multi-Stage Fracture 995.70 995.90 0
2012-04-26 Multi-Stage Fracture 972.20 972.40 0
2012-04-27 Multi-Stage Fracture 949.30 949.50 0
2012-04-27 Multi-Stage Fracture 926.60 926.80 0
2012-04-26 Multi-Stage Fracture 1432.80 1433.00 0
2012-04-27 Multi-Stage Fracture 903.70 903.90 0
2012-04-26 Multi-Stage Fracture 1406.60 1406.80 0
2012-04-26 Multi-Stage Fracture 1372.50 1372.70 0
2012-04-26 Multi-Stage Fracture 1338.30 1338.50 0
2012-04-26 Multi-Stage Fracture 1304.00 1304.20 0
2012-04-26 Multi-Stage Fracture 1269.80 1270.00 0
2012-04-26 Multi-Stage Fracture 1235.70 1235.90 0
2012-04-26 Multi-Stage Fracture 1201.00 1201.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5601 0.0 0.0 0.0
2013 8582 0.0 0.0 0.0
2014 8530 0.0 0.0 0.0
2015 1790 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-07 No Incident Encountered 0.00 0.00
2012-05-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References