X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595262211002

Well Details

Well ID: 0595262211002
Loading map...
Location: 00/11-22-059-26W5/2
Location Alias: 00/11-22-59-26 W5M
Location Alias 2: 00/11-22-059-26 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 26
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: DORSET ET AL LELAND 11-22-59-26
Operator Name: Baytex Energy Ltd.
License Number: 0086635
License Date: 1980-10-27
License Status: RecExempt
Spud Date: 1980-11-17
Final Drill Date: 1981-01-10
Well Total Depth: 3035.00 m
Surface Hole Latitude: 54.118424
Surface Hole Longitude: -117.817631

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-27 Obtained License
1981-01-10 Finished Drilling
1981-01-11 Well Log Performed
1981-01-15 Production Casing Operation Performed
1981-03-19 Perforation Treatment Performed - Jet Perforation
1981-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-25 Perforation Treatment Performed - Jet Perforation
1981-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-29 Perforation Treatment Performed - Jet Perforation
1981-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-02 Perforation Treatment Performed - Fractured
1981-04-14 Well Mode changed to Drilled and Cased
1996-02-29 Well Log Performed
1996-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-01 Perforation Treatment Performed - Jet Perforation
1996-03-01 Plug Back Performed
1996-03-02 Perforation Treatment Performed - Remedial Casing
1996-03-04 Well Abandoned
1996-03-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-19 Perforation 2990.00 2993.00 13
1996-03-01 Packing Device Capped w/Cement 2582.00 2590.00 0
1996-03-01 Perforation 627.00 627.40 13
1996-03-02 Remedial Casing Cementing 627.00 627.40 0
1981-03-22 Acid Treatment 2990.00 2993.00 0
1981-03-25 Packing Device Capped w/Cement 2986.00 2986.00 0
1981-03-25 Perforation 2797.00 2800.00 13
1981-03-27 Acid Treatment 2797.00 2800.00 0
1981-03-29 Perforation 2597.00 2601.50 13
1981-03-30 Acid Treatment 2597.00 2601.50 0
1981-04-02 Fracture 2597.00 2601.50 0
1996-03-01 Packing Device Capped w/Cement 2678.00 2686.00 0

For data sources see[4]



References