X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615113116003

Well Details

Well ID: 0615113116003
Loading map...
Location: 00/16-31-061-11W5/3
Location Alias: 00/16-31-61-11 W5M
Location Alias 2: 00/16-31-061-11 W5/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 11
Section: 31
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-31-61-11
Operator Name: ACCEL Canada Holdings Limited
License Number: 0020434
License Date: 1961-02-17
License Status: Abandoned
Spud Date: 1961-02-24
Final Drill Date: 1961-03-31
Well Total Depth: 2663.60 m
Surface Hole Latitude: 54.324722
Surface Hole Longitude: -115.629176

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-02-17 Obtained License
1961-03-05 Drill Stem Test Performed
1961-03-31 Finished Drilling
1961-03-31 Well Mode changed to Drilled and Cased
1961-04-01 Drill Stem Test Performed
1961-04-02 Production Casing Operation Performed
1961-04-28 Perforation Treatment Performed - Jet Perforation
1961-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-19 Perforation Treatment Performed - Jet Perforation
1980-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-18 Plug Back Performed
1990-08-19 Well Log Performed
1990-08-20 Perforation Treatment Performed - Jet Perforation
1990-08-20 Well Log Performed
1990-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-01 Perforation Treatment Performed - Jet Perforation
1990-09-01 Well Log Performed
1990-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-11 Perforation Treatment Performed - Jet Perforation
1990-09-11 Well Log Performed
1990-09-12 Perforation Treatment Performed - Cement Squeeze
1990-09-12 Well Log Performed
1990-09-13 Perforation Treatment Performed - Cement Squeeze
1990-09-13 Plug Back Performed
1990-09-14 Perforation Treatment Performed - Cement Squeeze
1990-09-14 Well Log Performed
1990-09-18 Perforation Treatment Performed - Jet Perforation
1990-09-18 Well Log Performed
1990-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-19 Plug Back Performed
1990-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-20 Plug Back Performed
1990-09-20 Well Log Performed
1990-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-08-05 Perforation Treatment Performed - Cement Plug
1992-08-06 Well Began Production
1992-08-06 Well Fluid changed to Gas
1992-08-06 Well Mode changed to Flowing
1992-08-07 Perforation Treatment Performed - Jet Perforation
1992-08-09 Perforation Treatment Performed - Jet Perforation
1992-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-06 Well Log Performed
2003-03-07 Perforation Treatment Performed - Jet Perforation
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Suspended
2004-11-04 Well Log Performed
2004-11-05 Perforation Treatment Performed - Jet Perforation
2004-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-06 Perforation Treatment Performed - Jet Perforation
2004-11-06 Plug Back Performed
2004-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-08 Perforation Treatment Performed - Jet Perforation
2004-11-08 Plug Back Performed
2004-11-09 Perforation Treatment Performed - Remedial Casing
2004-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-10 Plug Back Performed
2004-11-10 Well Fluid changed to Gas
2004-11-10 Well Mode changed to Abandoned Zone
2004-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-11 Perforation Treatment Performed - Jet Perforation
2004-11-11 Plug Back Performed
2004-11-12 Perforation Treatment Performed - Remedial Casing
2004-11-13 Perforation Treatment Performed - Cement Plug
2004-11-13 Perforation Treatment Performed - Jet Perforation
2004-11-13 Plug Back Performed
2004-11-14 Perforation Treatment Performed - Remedial Casing
2004-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-23 Perforation Treatment Performed - Jet Perforation
2004-11-23 Plug Back Performed
2004-11-23 Well Log Performed
2004-11-24 Perforation Treatment Performed - Remedial Casing
2004-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-25 Perforation Treatment Performed - Jet Perforation
2004-11-25 Plug Back Performed
2004-11-25 Well Log Performed
2004-11-26 Perforation Treatment Performed - Remedial Casing
2004-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-27 Perforation Treatment Performed - Jet Perforation
2004-11-27 Plug Back Performed
2004-11-27 Well Log Performed
2004-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-28 Perforation Treatment Performed - Jet Perforation
2004-11-28 Perforation Treatment Performed - Remedial Casing
2004-11-28 Plug Back Performed
2004-11-29 Perforation Treatment Performed - Jet Perforation
2004-11-29 Well Log Performed
2004-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-30 Perforation Treatment Performed - Remedial Casing
2004-11-30 Plug Back Performed
2004-12-01 Perforation Treatment Performed - Jet Perforation
2004-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-02 Perforation Treatment Performed - Remedial Casing
2004-12-02 Plug Back Performed
2005-12-01 Well Abandoned
2005-12-01 Well Fluid changed to Gas
2005-12-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-28 Perforation 2617.60 2625.50 7
1990-08-28 Acid Treatment 1612.40 1614.20 0
1990-08-30 Acid Treatment 1612.40 1614.20 0
1990-09-01 Perforation 1388.00 1391.00 13
1990-09-01 Perforation 1350.40 1351.40 13
1990-09-01 Perforation 1353.00 1354.50 13
1990-09-01 Perforation 1355.70 1358.00 13
1990-09-01 Perforation 1359.00 1359.50 13
1990-09-09 Acid Treatment 1388.00 1391.00 0
1990-09-11 Perforation 1662.00 1662.50 13
1990-09-12 Cement Squeeze 1662.00 1662.50 0
1961-04-28 Perforation 2627.40 2629.80 7
1990-09-13 Cement Squeeze 1612.40 1614.20 0
1990-09-14 Cement Squeeze 1388.00 1391.00 0
1990-09-18 Perforation 1652.00 1655.00 13
1990-09-19 Packing Device Capped w/Cement 1548.40 1650.00 0
1990-09-20 Packing Device Capped w/Cement 1377.00 1385.00 0
1990-09-21 Acid Treatment 1350.40 1359.50 0
1992-08-05 Cement Plug 1350.40 1359.50 0
1992-08-07 Perforation 1388.00 1391.00 13
1992-08-09 Perforation 1652.00 1655.00 13
1992-08-11 Acid Treatment 1652.00 1655.00 0
1961-04-28 Perforation 2634.10 2638.30 7
2003-03-07 Perforation 1651.10 1654.50 13
2004-11-05 Perforation 2103.70 2105.70 17
2004-11-06 Packing Device Capped w/Cement 2088.50 2096.50 0
2004-11-06 Perforation 1926.50 1928.50 17
2004-11-08 Packing Device Capped w/Cement 1911.00 1919.00 0
2004-11-08 Perforation 1692.00 1694.00 17
2004-11-09 Remedial Casing Cementing 1692.00 1694.00 0
2004-11-10 Packing Device Capped w/Cement 1625.80 1679.50 0
2004-11-11 Packing Device Capped w/Cement 1596.50 1604.50 0
2004-11-11 Perforation 1573.50 1575.50 17
1961-05-19 Acid Treatment 2617.60 2638.30 0
2004-11-12 Remedial Casing Cementing 1573.50 1575.50 0
2004-11-13 Cement Plug 1307.80 1565.00 0
2004-11-13 Perforation 604.00 606.00 17
2004-11-14 Remedial Casing Cementing 604.00 606.00 0
2004-11-23 Perforation 561.00 563.00 17
2004-11-23 Packing Device Capped w/Cement 588.00 596.00 0
2004-11-24 Remedial Casing Cementing 561.00 563.00 0
2004-11-25 Packing Device Capped w/Cement 549.50 557.50 0
2004-11-25 Perforation 545.00 547.00 17
2004-11-26 Remedial Casing Cementing 545.00 547.00 0
1980-01-19 Perforation 2601.00 2607.50 13
2004-11-27 Packing Device Capped w/Cement 529.00 539.00 0
2004-11-27 Perforation 505.00 507.00 17
2004-11-28 Packing Device Capped w/Cement 492.30 500.30 0
2004-11-28 Perforation 436.00 438.00 17
2004-11-28 Remedial Casing Cementing 436.00 438.00 0
2004-11-28 Packing Device Capped w/Cement 419.00 429.00 0
2004-11-29 Perforation 362.00 364.00 17
2004-11-30 Remedial Casing Cementing 362.00 364.00 0
2004-11-30 Packing Device Capped w/Cement 337.50 352.80 0
2004-12-01 Perforation 296.00 298.00 17
1980-01-20 Acid Treatment 2601.00 2607.50 0
2004-12-02 Remedial Casing Cementing 296.00 298.00 0
2004-12-02 Packing Device Capped w/Cement 270.50 289.50 0
1990-08-18 Packing Device Capped w/Cement 2595.00 2595.00 0
1990-08-20 Perforation 1652.00 1655.10 13
1990-08-20 Perforation 1612.40 1614.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2113 0.0 0.0 0.0
1993 5419 0.0 0.0 0.0
1994 6678 0.0 0.0 0.0
1995 8704 0.0 0.0 0.0
1996 8316 0.0 0.0 0.0
1997 8482 0.0 0.0 0.0
1998 8559 0.0 0.0 0.0
1999 7813 0.0 0.0 0.0
2000 8004 0.0 0.0 0.0
2001 7216 0.0 0.0 0.0
2002 5353 0.0 0.0 0.0
2003 3671 0.0 0.0 0.0

For data sources see[5]

References