X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615120504000

Well Details

Well ID: 0615120504000
Loading map...
Location: 00/04-05-061-12W5/0
Location Alias: 00/04-05-61-12 W5M
Location Alias 2: 00/04-05-061-12 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 12
Section: 05
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSON 4-5-61-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0432387
License Date: 2011-03-16
License Status: Issued
Spud Date: 2011-04-03
Final Drill Date: 2011-04-20
Well Total Depth: 3956.00 m
Surface Hole Latitude: 54.254049
Surface Hole Longitude: -115.778267

For data sources see[1][2]

Well History

Date Event
2011-03-16 Obtained License
2011-03-23 Well Log Performed
2011-04-05 Surface Casing Operation Performed
2011-04-08 Well Log Performed
2011-04-10 Direction Drilling Operation Performed - Horizontal
2011-04-14 Well Log Performed
2011-04-15 Intermediate Casing Operation Performed
2011-04-20 Finished Drilling
2011-04-20 Well Mode changed to Drilled and Cased
2011-04-22 Perforation Treatment Performed - Open-Hole Completion
2011-04-22 Rig Released
2011-04-26 Well Log Performed
2011-06-01 Well Began Production
2011-06-01 Well Fluid changed to Crude Oil
2011-06-01 Well Mode changed to Flowing
2011-06-06 Perforation Treatment Performed - Open-Hole Completion
2011-06-07 Liner Casing Operation Performed
2011-06-08 Well Log Performed
2011-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-28 Well Fluid changed to Crude Oil
2011-06-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-04-10 2283.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-04-22 Open Hole/Barefoot Completion 2718.00 3956.00 0
2011-06-14 Multi-Stage Fracture 3603.00 3603.10 0
2011-06-14 Multi-Stage Fracture 3554.00 3554.10 0
2011-06-14 Multi-Stage Fracture 3505.00 3505.10 0
2011-06-14 Multi-Stage Fracture 3456.00 3456.10 0
2011-06-14 Multi-Stage Fracture 3407.00 3407.10 0
2011-06-14 Multi-Stage Fracture 3358.00 3358.10 0
2011-06-14 Multi-Stage Fracture 3309.00 3309.10 0
2011-06-14 Multi-Stage Fracture 3260.00 3260.10 0
2011-06-14 Multi-Stage Fracture 3211.00 3211.10 0
2011-06-14 Multi-Stage Fracture 3162.00 3162.10 0
2011-06-06 Open Hole/Barefoot Completion 3948.00 3956.00 0
2011-06-14 Multi-Stage Fracture 3113.00 3113.10 0
2011-06-14 Multi-Stage Fracture 3064.00 3064.10 0
2011-06-14 Multi-Stage Fracture 3015.00 3015.10 0
2011-06-14 Multi-Stage Fracture 3946.00 3946.10 0
2011-06-14 Multi-Stage Fracture 3897.00 3897.10 0
2011-06-14 Multi-Stage Fracture 3848.00 3848.10 0
2011-06-14 Multi-Stage Fracture 3799.00 3799.10 0
2011-06-14 Multi-Stage Fracture 3750.00 3750.10 0
2011-06-14 Multi-Stage Fracture 3701.00 3701.10 0
2011-06-14 Multi-Stage Fracture 3652.00 3652.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4007 0.0 0.0 0.0
2012 8088 0.0 0.0 0.0
2013 8000 0.0 0.0 0.0
2014 8605 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 6361 0.0 0.0 0.0
2017 8698 0.0 0.0 0.0
2018 7001 0.0 0.0 0.0
2019 2892 0.0 0.0 0.0

For data sources see[6]

References