X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615120912000

Well Details

Well ID: 0615120912000
Loading map...
Location: 00/12-09-061-12W5/0
Location Alias: 00/12-09-61-12 W5M
Location Alias 2: 00/12-09-061-12 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 12
Section: 09
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSON 12-9-61-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0424578
License Date: 2010-10-14
License Status: Issued
Spud Date: 2010-11-16
Final Drill Date: 2010-12-07
Well Total Depth: 4007.00 m
Surface Hole Latitude: 54.274103
Surface Hole Longitude: -115.757887

For data sources see[1][2]

Well History

Date Event
2010-10-14 Obtained License
2010-11-18 Surface Casing Operation Performed
2010-11-28 Direction Drilling Operation Performed - Horizontal
2010-12-01 Intermediate Casing Operation Performed
2010-12-07 Finished Drilling
2010-12-07 Well Mode changed to Drilled and Cased
2010-12-09 Liner Casing Operation Performed
2010-12-09 Perforation Treatment Performed - Open-Hole Completion
2010-12-10 Rig Released
2010-12-10 Well Log Performed
2010-12-19 Well Log Performed
2010-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-29 Perforation Treatment Performed - Open-Hole Completion
2010-12-30 Well Began Production
2010-12-30 Well Fluid changed to Crude Oil
2010-12-30 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-28 2295.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-09 Open Hole/Barefoot Completion 2644.00 4007.00 0
2010-12-29 Multi-Stage Fracture 3503.60 3503.70 0
2010-12-29 Multi-Stage Fracture 3435.20 3435.30 0
2010-12-29 Multi-Stage Fracture 3366.80 3366.90 0
2010-12-29 Multi-Stage Fracture 3298.50 3298.60 0
2010-12-29 Multi-Stage Fracture 3230.10 3230.20 0
2010-12-29 Multi-Stage Fracture 3161.70 3161.80 0
2010-12-29 Multi-Stage Fracture 3093.40 3093.50 0
2010-12-29 Multi-Stage Fracture 3025.00 3025.10 0
2010-12-29 Multi-Stage Fracture 2976.10 2976.20 0
2010-12-29 Multi-Stage Fracture 2907.70 2907.80 0
2010-12-29 Open Hole/Barefoot Completion 4004.00 4007.00 0
2010-12-29 Multi-Stage Fracture 2839.40 2839.50 0
2010-12-29 Multi-Stage Fracture 2771.00 2771.10 0
2010-12-29 Multi-Stage Fracture 2698.00 2698.10 0
2010-12-29 Multi-Stage Fracture 3997.00 3997.10 0
2010-12-29 Multi-Stage Fracture 3940.00 3940.10 0
2010-12-29 Multi-Stage Fracture 3855.00 3855.10 0
2010-12-29 Multi-Stage Fracture 3823.00 3823.10 0
2010-12-29 Multi-Stage Fracture 3689.70 3689.80 0
2010-12-29 Multi-Stage Fracture 3621.40 3621.50 0
2010-12-29 Multi-Stage Fracture 3553.00 3553.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 48 0.0 0.0 0.0
2011 8301 0.0 0.0 0.0
2012 8516 0.0 0.0 0.0
2013 8211 0.0 0.0 0.0
2014 7778 0.0 0.0 0.0
2015 8558 0.0 0.0 0.0
2016 8221 0.0 0.0 0.0
2017 6055 0.0 0.0 0.0
2018 8135 0.0 0.0 0.0
2019 8293 0.0 0.0 0.0
2020 1018 0.0 0.0 0.0

For data sources see[6]

References