X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615121011002

Well Details

Well ID: 0615121011002
Loading map...
Location: 00/11-10-061-12W5/2
Location Alias: 00/11-10-61-12 W5M
Location Alias 2: 00/11-10-061-12 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 12
Section: 10
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSON 11-10-61-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0020439
License Date: 1961-02-17
License Status: Abandoned
Spud Date: 1961-03-09
Final Drill Date: 1961-04-05
Well Total Depth: 2699.90 m
Surface Hole Latitude: 54.263129
Surface Hole Longitude: -115.716927

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-02-17 Obtained License
1961-03-10 Lost Circulation Occurred
1961-04-05 Finished Drilling
1961-04-05 Well Mode changed to Drilled and Cased
1961-04-07 Production Casing Operation Performed
1961-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-18 Perforation Treatment Performed - Jet Perforation
1964-06-10 Perforation Treatment Performed - Jet Perforation
1964-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-13 Perforation Treatment Performed - Cement Squeeze
1964-11-17 Well Began Injection
1964-11-17 Well Fluid changed to Water
1964-11-17 Well Type changed to Disposal
1964-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-12 Perforation Treatment Performed - Cement Squeeze
1968-05-13 Perforation Treatment Performed - Cement Squeeze
1968-05-13 Well Fluid changed to Water
1968-05-13 Well Mode changed to Abandoned Zone
1968-05-13 Well Type changed to Disposal
1968-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-15 Perforation Treatment Performed - Jet Perforation
1968-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-30 Well Log Performed
1989-06-02 Perforation Treatment Performed - Jet Perforation
1989-06-02 Well Log Performed
1989-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-04 Well Log Performed
1989-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-06 Plug Back Performed
1989-06-06 Well Log Performed
1990-06-02 Well Log Performed
1993-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-23 Plug Back Performed
2001-03-26 Perforation Treatment Performed - Jet Perforation
2001-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-18 Perforation 2615.20 2627.40 7
1968-05-13 Cement Squeeze 2642.90 2652.10 0
1968-05-15 Perforation 2615.20 2617.00 3
1968-05-15 Perforation 2620.70 2621.30 3
1968-05-15 Perforation 2621.90 2623.10 3
1968-05-15 Perforation 2624.30 2624.90 3
1968-05-15 Perforation 2626.20 2627.40 3
1968-05-15 Acid Treatment 2615.20 2627.40 0
1968-10-28 Acid Treatment 2615.20 2623.10 0
1973-02-16 Acid Treatment 2615.20 2627.40 0
1976-04-20 Acid Treatment 2615.20 2627.40 0
1961-04-18 Acid Treatment 2615.20 2627.40 0
1989-06-02 Perforation 2101.60 2126.00 20
1989-06-04 Acid Treatment 2101.60 2126.00 0
1989-06-06 Packing Device Capped w/Cement 2582.00 2590.00 0
1989-06-06 Packing Device Capped w/Cement 2140.00 2148.00 0
1993-06-20 Acid Treatment 2101.60 2126.00 0
1997-09-23 Packing Device Capped w/Cement 2086.00 2097.00 0
2001-03-26 Perforation 767.00 768.00 20
2001-03-27 Packing Device Capped w/Cement 749.50 757.50 0
2001-03-27 Packing Device Capped w/Cement 749.50 757.50 0
1964-06-10 Perforation 2642.90 2644.70 7
1964-06-10 Perforation 2645.70 2646.90 7
1964-06-10 Perforation 2650.20 2652.10 7
1964-06-11 Acid Treatment 2615.20 2652.10 0
1964-06-13 Cement Squeeze 2615.20 2627.40 0
1964-11-23 Acid Treatment 2642.90 2652.10 0
1968-05-12 Cement Squeeze 2642.90 2652.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-03-10 Lost Circulation 161.50 161.50

For data sources see[6]

References