If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615123606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.317765,"lon":-115.667023,"icon":""}]} |
Location: 00/06-36-061-12W5/2 | |
Location Alias: 00/06-36-61-12 W5M | |
Location Alias 2: 00/06-36-061-12 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 12 | |
Section: 36 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL HOLDINGS CARSONN 6-36-61-12 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0021517 | |
License Date: 1961-10-13 | |
License Status: Abandoned | |
Spud Date: 1961-10-19 | |
Final Drill Date: 1961-11-29 | |
Well Total Depth: 2664.00 m | |
Surface Hole Latitude: 54.317765 | |
Surface Hole Longitude: -115.667023 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-10-13 | Obtained License |
1961-11-29 | Finished Drilling |
1961-11-29 | Well Mode changed to Drilled and Cased |
1961-11-30 | Drill Stem Test Performed |
1961-12-03 | Production Casing Operation Performed |
1961-12-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-12-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1961-12-13 | Perforation Treatment Performed - Jet Perforation |
1961-12-19 | Well Began Production |
1961-12-19 | Well Fluid changed to Crude Oil |
1961-12-19 | Well Mode changed to Flowing |
1970-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-12-18 | Perforation Treatment Performed - Jet Perforation |
1971-02-01 | Well Fluid changed to Crude Oil |
1971-02-01 | Well Mode changed to Suspended |
1973-11-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-01-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-11 | Well Log Performed |
1981-05-15 | Perforation Treatment Performed - Fractured |
1984-08-22 | Well Fluid changed to Crude Oil |
1984-08-22 | Well Mode changed to Flowing |
1986-12-12 | Perforation Treatment Performed - Fractured |
1987-04-28 | Well Log Performed |
1987-04-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-04-29 | Perforation Treatment Performed - Cement Squeeze |
1987-04-30 | Well Fluid changed to Crude Oil |
1987-04-30 | Well Mode changed to Suspended |
1987-05-03 | Perforation Treatment Performed - Jet Perforation |
1987-05-03 | Well Log Performed |
1987-05-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-09 | Well Log Performed |
1989-10-23 | Well Log Performed |
1989-10-24 | Well Log Performed |
1989-10-25 | Well Log Performed |
1990-02-05 | Perforation Treatment Performed - Jet Perforation |
1990-02-06 | Perforation Treatment Performed - Jet Perforation |
1990-02-06 | Well Log Performed |
1990-02-07 | Perforation Treatment Performed - Fractured |
1990-02-08 | Well Log Performed |
1990-02-21 | Well Log Performed |
1990-02-22 | Well Log Performed |
1990-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-02-28 | Well Log Performed |
1990-03-15 | Well Began Injection |
1990-03-15 | Well Fluid changed to Water |
1990-03-15 | Well Type changed to Injection |
1990-06-13 | Well Log Performed |
1994-07-01 | Well Structure changed to Commingled |
1999-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-04-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-04-15 | Plug Back Performed |
2005-04-15 | Well Log Performed |
2005-04-16 | Well Log Performed |
2005-06-28 | Perforation Treatment Performed - Jet Perforation |
2005-06-28 | Well Log Performed |
2005-06-29 | Perforation Treatment Performed - Remedial Casing |
2005-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-04 | Perforation Treatment Performed - Jet Perforation |
2005-07-04 | Plug Back Performed |
2005-07-04 | Well Log Performed |
2005-07-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-05 | Perforation Treatment Performed - Remedial Casing |
2005-07-05 | Plug Back Performed |
2005-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-06 | Plug Back Performed |
2005-07-07 | Perforation Treatment Performed - Jet Perforation |
2005-07-07 | Perforation Treatment Performed - Remedial Casing |
2005-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-08 | Perforation Treatment Performed - Jet Perforation |
2005-07-08 | Perforation Treatment Performed - Remedial Casing |
2005-07-08 | Plug Back Performed |
2005-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-09 | Plug Back Performed |
2006-07-06 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-12-13 | Perforation | 2578.90 | 2583.20 | 7 |
1974-08-15 | Acid Treatment | 2608.50 | 2630.40 | 0 |
1975-01-06 | Acid Treatment | 2608.50 | 2630.40 | 0 |
1975-11-13 | Acid Treatment | 2608.50 | 2630.40 | 0 |
1979-07-24 | Acid Treatment | 2608.50 | 2630.40 | 0 |
1981-05-15 | Fracture | 2608.50 | 2630.40 | 0 |
1986-12-12 | Fracture | 2608.50 | 2630.40 | 0 |
1987-04-29 | Acid Treatment | 2606.50 | 2630.40 | 0 |
1987-04-29 | Cement Squeeze | 2606.50 | 2630.40 | 0 |
1987-05-03 | Perforation | 2596.00 | 2597.50 | 13 |
1987-05-03 | Perforation | 2608.50 | 2614.90 | 7 |
1961-12-13 | Perforation | 2584.70 | 2587.40 | 7 |
1987-05-03 | Perforation | 2623.10 | 2630.40 | 7 |
1987-05-06 | Acid Treatment | 2596.00 | 2630.40 | 0 |
1989-08-06 | Acid Treatment | 2596.00 | 2630.40 | 0 |
1990-02-05 | Perforation | 2584.70 | 2587.40 | 13 |
1990-02-05 | Perforation | 2588.70 | 2590.20 | 13 |
1990-02-06 | Perforation | 2578.90 | 2583.20 | 13 |
1990-02-07 | Fracture | 2579.30 | 2582.90 | 0 |
1990-02-07 | Fracture | 2584.80 | 2587.20 | 0 |
1990-02-23 | Acid Treatment | 2578.90 | 2590.20 | 0 |
1990-02-24 | Acid Treatment | 2578.90 | 2590.20 | 0 |
1961-12-13 | Perforation | 2608.50 | 2614.90 | 7 |
1990-02-25 | Acid Treatment | 2596.00 | 2630.40 | 0 |
1999-01-25 | Acid Treatment | 2578.90 | 2590.20 | 0 |
2000-02-10 | Acid Treatment | 2578.90 | 2590.20 | 0 |
2001-05-16 | Acid Treatment | 2596.00 | 2630.40 | 0 |
2005-04-15 | Packing Device Capped w/Cement | 2590.80 | 2594.00 | 0 |
2005-04-15 | Packing Device Capped w/Cement | 2566.80 | 2575.00 | 0 |
2005-06-28 | Perforation | 1381.00 | 1382.00 | 17 |
2005-06-29 | Remedial Casing Cementing | 1381.00 | 1382.00 | 0 |
2005-07-04 | Packing Device Capped w/Cement | 1358.00 | 1368.00 | 0 |
2005-07-04 | Perforation | 603.90 | 604.90 | 17 |
1961-12-13 | Acid Wash | 2578.90 | 2614.90 | 0 |
2005-07-04 | Perforation | 500.00 | 501.00 | 17 |
2005-07-05 | Remedial Casing Cementing | 603.90 | 604.90 | 0 |
2005-07-05 | Packing Device Capped w/Cement | 584.00 | 594.00 | 0 |
2005-07-05 | Remedial Casing Cementing | 500.00 | 501.00 | 0 |
2005-07-06 | Packing Device Capped w/Cement | 482.00 | 492.00 | 0 |
2005-07-07 | Perforation | 278.00 | 279.00 | 17 |
2005-07-07 | Remedial Casing Cementing | 278.00 | 279.00 | 0 |
2005-07-08 | Packing Device Capped w/Cement | 258.70 | 269.70 | 0 |
2005-07-08 | Perforation | 247.00 | 248.00 | 17 |
2005-07-08 | Remedial Casing Cementing | 247.00 | 248.00 | 0 |
1961-12-13 | Acid Treatment | 2578.90 | 2587.40 | 0 |
2005-07-09 | Packing Device Capped w/Cement | 232.10 | 241.00 | 0 |
1961-12-13 | Acid Treatment | 2608.50 | 2614.90 | 0 |
1970-12-18 | Perforation | 2623.10 | 2630.40 | 7 |
1970-12-18 | Acid Treatment | 2608.50 | 2630.40 | 0 |
1973-11-26 | Acid Treatment | 2608.50 | 2630.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 240 | 0.0 | 0.0 | 0.0 |
1984 | 3132 | 0.0 | 0.0 | 0.0 |
1985 | 6566 | 0.0 | 0.0 | 0.0 |
1986 | 2905 | 0.0 | 0.0 | 0.0 |
1987 | 474 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]