X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615123606002

Well Details

Well ID: 0615123606002
Loading map...
Location: 00/06-36-061-12W5/2
Location Alias: 00/06-36-61-12 W5M
Location Alias 2: 00/06-36-061-12 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 12
Section: 36
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 6-36-61-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0021517
License Date: 1961-10-13
License Status: Abandoned
Spud Date: 1961-10-19
Final Drill Date: 1961-11-29
Well Total Depth: 2664.00 m
Surface Hole Latitude: 54.317765
Surface Hole Longitude: -115.667023

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-13 Obtained License
1961-11-29 Finished Drilling
1961-11-29 Well Mode changed to Drilled and Cased
1961-11-30 Drill Stem Test Performed
1961-12-03 Production Casing Operation Performed
1961-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-13 Perforation Treatment Performed - Acid Wash - No Pressure
1961-12-13 Perforation Treatment Performed - Jet Perforation
1961-12-19 Well Began Production
1961-12-19 Well Fluid changed to Crude Oil
1961-12-19 Well Mode changed to Flowing
1970-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-18 Perforation Treatment Performed - Jet Perforation
1971-02-01 Well Fluid changed to Crude Oil
1971-02-01 Well Mode changed to Suspended
1973-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-11 Well Log Performed
1981-05-15 Perforation Treatment Performed - Fractured
1984-08-22 Well Fluid changed to Crude Oil
1984-08-22 Well Mode changed to Flowing
1986-12-12 Perforation Treatment Performed - Fractured
1987-04-28 Well Log Performed
1987-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-29 Perforation Treatment Performed - Cement Squeeze
1987-04-30 Well Fluid changed to Crude Oil
1987-04-30 Well Mode changed to Suspended
1987-05-03 Perforation Treatment Performed - Jet Perforation
1987-05-03 Well Log Performed
1987-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-09 Well Log Performed
1989-10-23 Well Log Performed
1989-10-24 Well Log Performed
1989-10-25 Well Log Performed
1990-02-05 Perforation Treatment Performed - Jet Perforation
1990-02-06 Perforation Treatment Performed - Jet Perforation
1990-02-06 Well Log Performed
1990-02-07 Perforation Treatment Performed - Fractured
1990-02-08 Well Log Performed
1990-02-21 Well Log Performed
1990-02-22 Well Log Performed
1990-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-28 Well Log Performed
1990-03-15 Well Began Injection
1990-03-15 Well Fluid changed to Water
1990-03-15 Well Type changed to Injection
1990-06-13 Well Log Performed
1994-07-01 Well Structure changed to Commingled
1999-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-15 Plug Back Performed
2005-04-15 Well Log Performed
2005-04-16 Well Log Performed
2005-06-28 Perforation Treatment Performed - Jet Perforation
2005-06-28 Well Log Performed
2005-06-29 Perforation Treatment Performed - Remedial Casing
2005-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-04 Perforation Treatment Performed - Jet Perforation
2005-07-04 Plug Back Performed
2005-07-04 Well Log Performed
2005-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-05 Perforation Treatment Performed - Remedial Casing
2005-07-05 Plug Back Performed
2005-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-06 Plug Back Performed
2005-07-07 Perforation Treatment Performed - Jet Perforation
2005-07-07 Perforation Treatment Performed - Remedial Casing
2005-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-08 Perforation Treatment Performed - Jet Perforation
2005-07-08 Perforation Treatment Performed - Remedial Casing
2005-07-08 Plug Back Performed
2005-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-09 Plug Back Performed
2006-07-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-12-13 Perforation 2578.90 2583.20 7
1974-08-15 Acid Treatment 2608.50 2630.40 0
1975-01-06 Acid Treatment 2608.50 2630.40 0
1975-11-13 Acid Treatment 2608.50 2630.40 0
1979-07-24 Acid Treatment 2608.50 2630.40 0
1981-05-15 Fracture 2608.50 2630.40 0
1986-12-12 Fracture 2608.50 2630.40 0
1987-04-29 Acid Treatment 2606.50 2630.40 0
1987-04-29 Cement Squeeze 2606.50 2630.40 0
1987-05-03 Perforation 2596.00 2597.50 13
1987-05-03 Perforation 2608.50 2614.90 7
1961-12-13 Perforation 2584.70 2587.40 7
1987-05-03 Perforation 2623.10 2630.40 7
1987-05-06 Acid Treatment 2596.00 2630.40 0
1989-08-06 Acid Treatment 2596.00 2630.40 0
1990-02-05 Perforation 2584.70 2587.40 13
1990-02-05 Perforation 2588.70 2590.20 13
1990-02-06 Perforation 2578.90 2583.20 13
1990-02-07 Fracture 2579.30 2582.90 0
1990-02-07 Fracture 2584.80 2587.20 0
1990-02-23 Acid Treatment 2578.90 2590.20 0
1990-02-24 Acid Treatment 2578.90 2590.20 0
1961-12-13 Perforation 2608.50 2614.90 7
1990-02-25 Acid Treatment 2596.00 2630.40 0
1999-01-25 Acid Treatment 2578.90 2590.20 0
2000-02-10 Acid Treatment 2578.90 2590.20 0
2001-05-16 Acid Treatment 2596.00 2630.40 0
2005-04-15 Packing Device Capped w/Cement 2590.80 2594.00 0
2005-04-15 Packing Device Capped w/Cement 2566.80 2575.00 0
2005-06-28 Perforation 1381.00 1382.00 17
2005-06-29 Remedial Casing Cementing 1381.00 1382.00 0
2005-07-04 Packing Device Capped w/Cement 1358.00 1368.00 0
2005-07-04 Perforation 603.90 604.90 17
1961-12-13 Acid Wash 2578.90 2614.90 0
2005-07-04 Perforation 500.00 501.00 17
2005-07-05 Remedial Casing Cementing 603.90 604.90 0
2005-07-05 Packing Device Capped w/Cement 584.00 594.00 0
2005-07-05 Remedial Casing Cementing 500.00 501.00 0
2005-07-06 Packing Device Capped w/Cement 482.00 492.00 0
2005-07-07 Perforation 278.00 279.00 17
2005-07-07 Remedial Casing Cementing 278.00 279.00 0
2005-07-08 Packing Device Capped w/Cement 258.70 269.70 0
2005-07-08 Perforation 247.00 248.00 17
2005-07-08 Remedial Casing Cementing 247.00 248.00 0
1961-12-13 Acid Treatment 2578.90 2587.40 0
2005-07-09 Packing Device Capped w/Cement 232.10 241.00 0
1961-12-13 Acid Treatment 2608.50 2614.90 0
1970-12-18 Perforation 2623.10 2630.40 7
1970-12-18 Acid Treatment 2608.50 2630.40 0
1973-11-26 Acid Treatment 2608.50 2630.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 240 0.0 0.0 0.0
1984 3132 0.0 0.0 0.0
1985 6566 0.0 0.0 0.0
1986 2905 0.0 0.0 0.0
1987 474 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References