If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615132405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.28513,"lon":-115.79992,"icon":""}]} |
Location: 00/05-24-061-13W5/0 | |
Location Alias: 00/05-24-61-13 W5M | |
Location Alias 2: 00/05-24-061-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 13 | |
Section: 24 | |
County/Municipality: Woodlands County | |
Well Name: ACCEL HOLDINGS CARSON 5-24-61-13 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0427092 | |
License Date: 2010-12-07 | |
License Status: Issued | |
Spud Date: 2011-01-25 | |
Final Drill Date: 2011-02-09 | |
Well Total Depth: 3972.00 m | |
Surface Hole Latitude: 54.285130 | |
Surface Hole Longitude: -115.799920 |
Date | Event |
---|---|
2010-12-07 | Obtained License |
2011-01-26 | Surface Casing Operation Performed |
2011-02-02 | Direction Drilling Operation Performed - Horizontal |
2011-02-02 | Well Log Performed |
2011-02-04 | Intermediate Casing Operation Performed |
2011-02-09 | Finished Drilling |
2011-02-09 | Well Mode changed to Drilled and Cased |
2011-02-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-11 | Rig Released |
2011-02-15 | Liner Casing Operation Performed |
2011-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-21 | Well Began Production |
2011-02-21 | Well Fluid changed to Crude Oil |
2011-02-21 | Well Mode changed to Flowing |
2011-03-26 | Well Fluid changed to Crude Oil |
2011-03-26 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-02 | 2286.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-11 | Open Hole/Barefoot Completion | 2708.00 | 3972.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 3496.70 | 3496.80 | 0 |
2011-02-20 | Multi-Stage Fracture | 3454.60 | 3454.70 | 0 |
2011-02-20 | Multi-Stage Fracture | 3387.50 | 3387.60 | 0 |
2011-02-20 | Multi-Stage Fracture | 3321.80 | 3321.90 | 0 |
2011-02-20 | Multi-Stage Fracture | 3256.40 | 3256.50 | 0 |
2011-02-20 | Multi-Stage Fracture | 3190.70 | 3190.80 | 0 |
2011-02-20 | Multi-Stage Fracture | 3136.60 | 3136.70 | 0 |
2011-02-20 | Multi-Stage Fracture | 3068.90 | 3069.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 3015.70 | 3015.80 | 0 |
2011-02-20 | Multi-Stage Fracture | 2924.90 | 2925.00 | 0 |
2011-02-20 | Open Hole/Barefoot Completion | 3967.00 | 3972.00 | 0 |
2011-02-20 | Multi-Stage Fracture | 2860.30 | 2860.40 | 0 |
2011-02-20 | Multi-Stage Fracture | 2793.70 | 2793.80 | 0 |
2011-02-20 | Multi-Stage Fracture | 2729.30 | 2729.40 | 0 |
2011-02-20 | Multi-Stage Fracture | 3962.00 | 3962.10 | 0 |
2011-02-20 | Multi-Stage Fracture | 3919.20 | 3919.30 | 0 |
2011-02-20 | Multi-Stage Fracture | 3852.80 | 3852.90 | 0 |
2011-02-20 | Multi-Stage Fracture | 3763.70 | 3763.80 | 0 |
2011-02-20 | Multi-Stage Fracture | 3698.50 | 3698.60 | 0 |
2011-02-20 | Multi-Stage Fracture | 3630.10 | 3630.20 | 0 |
2011-02-20 | Multi-Stage Fracture | 3563.10 | 3563.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5958 | 0.0 | 0.0 | 0.0 |
2012 | 8196 | 0.0 | 0.0 | 0.0 |
2013 | 7937 | 0.0 | 0.0 | 0.0 |
2014 | 8619 | 0.0 | 0.0 | 0.0 |
2015 | 8706 | 0.0 | 0.0 | 0.0 |
2016 | 8294 | 0.0 | 0.0 | 0.0 |
2017 | 8726 | 0.0 | 0.0 | 0.0 |
2018 | 7767 | 0.0 | 0.0 | 0.0 |
2019 | 6950 | 0.0 | 0.0 | 0.0 |
For data sources see[6]