X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624030910020

Well Details

Well ID: 0624030910020
Loading map...
Location: 02/10-09-062-03W4/0
Location Alias: 02/10-09-62-03 W4M
Location Alias 2: 02/10-09-062-03 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 03
Section: 09
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BAYTEX KENT 10-9-62-3
Operator Name: Baytex Energy Ltd.
License Number: 0152556
License Date: 1992-05-25
License Status: Abandoned
Spud Date: 1992-05-25
Final Drill Date: 1992-05-27
Well Total Depth: 368.00 m
Surface Hole Latitude: 54.350557
Surface Hole Longitude: -110.391912

For data sources see[1][2]

Well History

Date Event
1992-05-25 Obtained License
1992-05-26 Surface Casing Operation Performed
1992-05-27 Finished Drilling
1992-05-27 Production Casing Operation Performed
1992-05-27 Well Log Performed
1992-05-27 Well Mode changed to Drilled and Cased
1992-05-28 Rig Released
1992-05-29 Perforation Treatment Performed - Jet Perforation
1992-06-10 Well Began Production
1992-06-10 Well Fluid changed to Crude Bitumen
1992-06-10 Well Mode changed to Pumping
1997-01-05 Well Fluid changed to Crude Bitumen
1997-01-05 Well Mode changed to Suspended
2000-04-17 Well Fluid changed to Crude Bitumen
2000-04-17 Well Mode changed to Pumping
2001-01-31 Well Fluid changed to Crude Bitumen
2001-01-31 Well Mode changed to Suspended
2001-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-13 Plug Back Performed
2001-07-13 Well Fluid changed to Crude Bitumen
2001-07-13 Well Mode changed to Suspended
2001-07-14 Perforation Treatment Performed - Jet Perforation
2001-07-14 Well Fluid changed to Crude Bitumen
2001-07-14 Well Mode changed to Abandoned Zone
2018-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-04-23 Perforation Treatment Performed - Cement Plug
2018-04-23 Plug Back Performed
2018-07-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-05-29 Perforation 331.00 336.00 13
2001-07-13 Packing Device Capped w/Cement 319.00 327.00 0
2001-07-14 Perforation 296.60 299.60 26
2018-04-23 Cement Plug 299.60 319.00 0
2018-04-23 Packing Device Capped w/Cement 267.60 292.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 4971 0.0 0.0 0.0
1993 8356 0.0 0.0 0.0
1994 2469 0.0 0.0 0.0
1995 5129 0.0 0.0 0.0
1996 7967 0.0 0.0 0.0
1998 24 0.0 0.0 0.0
2000 1692 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References