If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624032611002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.392101,"lon":-110.344428,"icon":""}]} |
Location: 00/11-26-062-03W4/2 | |
Location Alias: 00/11-26-62-03 W4M | |
Location Alias 2: 00/11-26-062-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: BAYTEX KENT 11-26-62-3 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0205297 | |
License Date: 1997-08-25 | |
License Status: Suspension | |
Spud Date: 1997-09-13 | |
Final Drill Date: 1997-09-14 | |
Well Total Depth: 362.00 m | |
Surface Hole Latitude: 54.392101 | |
Surface Hole Longitude: -110.344428 |
Date | Event |
---|---|
1997-08-25 | Obtained License |
1997-09-14 | Finished Drilling |
1997-09-14 | Surface Casing Operation Performed |
1997-09-14 | Well Log Performed |
1997-09-14 | Well Mode changed to Drilled and Cased |
1997-09-15 | Production Casing Operation Performed |
1997-09-15 | Rig Released |
1997-12-10 | Perforation Treatment Performed - Jet Perforation |
2000-07-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-07-11 | Plug Back Performed |
2000-07-12 | Perforation Treatment Performed - Jet Perforation |
2000-07-12 | Well Began Production |
2000-07-12 | Well Fluid changed to Crude Bitumen |
2000-07-12 | Well Mode changed to Pumping |
2001-01-31 | Well Fluid changed to Crude Bitumen |
2001-01-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-12-10 | Perforation | 322.00 | 326.00 | 39 |
2000-07-11 | Packing Device Capped w/Cement | 308.70 | 316.70 | 0 |
2000-07-12 | Perforation | 282.00 | 286.00 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 2781 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]