X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0624041816020

Well Details

Well ID: 0624041816020
Loading map...
Location: 02/16-18-062-04W4/0
Location Alias: 02/16-18-62-04 W4M
Location Alias 2: 02/16-18-062-04 W4/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 4
Range: 04
Section: 18
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: BAYTEX 16D BEAVRDM 16-18-62-4
Operator Name: Baytex Energy Ltd.
License Number: 0455280
License Date: 2013-02-20
License Status: Abandoned
Spud Date: 2013-03-04
Final Drill Date: 2013-03-06
Well Total Depth: 510.00 m
Surface Hole Latitude: 54.367405
Surface Hole Longitude: -110.578261

For data sources see[1][2]

Well History

Date Event
2013-01-09 Well Log Performed
2013-02-20 Obtained License
2013-03-04 Direction Drilling Operation Performed - Deviate
2013-03-05 Surface Casing Operation Performed
2013-03-06 Finished Drilling
2013-03-06 Well Log Performed
2013-03-06 Well Mode changed to Drilled and Cased
2013-03-07 Production Casing Operation Performed
2013-03-07 Rig Released
2013-03-15 Perforation Treatment Performed - Jet Perforation
2013-03-15 Well Log Performed
2013-04-01 Well Began Production
2013-04-01 Well Fluid changed to Crude Bitumen
2013-04-01 Well Mode changed to Pumping
2013-11-27 Perforation Treatment Performed - Cement Plug
2013-11-27 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2013-11-27 Plug Back Performed
2013-12-12 Well Log Performed
2014-01-09 Perforation Treatment Performed - Cement Squeeze
2014-01-09 Perforation Treatment Performed - Jet Perforation
2014-01-09 Plug Back Performed
2014-01-10 Perforation Treatment Performed - Cement Plug
2014-01-10 Plug Back Performed
2014-01-27 Perforation Treatment Performed - Cement Squeeze
2014-01-27 Perforation Treatment Performed - Jet Perforation
2014-01-27 Plug Back Performed
2014-01-27 Well Log Performed
2015-08-31 Well Fluid changed to Crude Bitumen
2015-08-31 Well Mode changed to Suspended
2016-06-01 Well Fluid changed to Crude Bitumen
2016-06-01 Well Mode changed to Pumping
2018-01-10 Well Fluid changed to Crude Bitumen
2018-01-10 Well Mode changed to Abandoned Zone
2018-12-12 Well Abandoned
2018-12-12 Well Fluid changed to Crude Bitumen
2018-12-12 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-04 Precision Drilling Corporation 185 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-04 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-15 Perforation 415.00 417.00 26
2014-01-27 Perforation 166.00 169.00 17
2014-01-27 Cement Squeeze 166.00 169.00 0
2013-03-15 Perforation 407.50 409.50 26
2013-03-15 Perforation 402.50 404.50 26
2013-03-15 Perforation 399.00 401.00 26
2013-11-27 Packing Dev Cpd w/Res-Gyp Cem 417.00 505.00 0
2013-11-27 Cement Plug 417.00 505.00 0
2014-01-09 Perforation 262.50 265.50 17
2014-01-09 Cement Squeeze 262.50 265.50 0
2014-01-10 Cement Plug 350.00 397.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 48 0.0 0.0 0.0
2016 24 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-07 No Incident Encountered 0.00 0.00
2013-03-16 No Incident Encountered 0.00 0.00
2018-12-12 No Incident Encountered 0.00 0.00
2014-01-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References