If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0624092505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.390553,"lon":-111.22317,"icon":""}]} |
Location: 00/05-25-062-09W4/0 | |
Location Alias: 00/05-25-62-09 W4M | |
Location Alias 2: 00/05-25-062-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 4 | |
Range: 09 | |
Section: 25 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: BAYTEX 5D MANN LAKE 5-25-62-9 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0191471 | |
License Date: 1996-09-18 | |
License Status: Suspension | |
Spud Date: 1996-11-12 | |
Final Drill Date: 1996-11-14 | |
Well Total Depth: 488.00 m | |
Surface Hole Latitude: 54.390553 | |
Surface Hole Longitude: -111.223170 |
Date | Event |
---|---|
1996-09-18 | Obtained License |
1996-11-13 | Surface Casing Operation Performed |
1996-11-14 | Finished Drilling |
1996-11-14 | Well Mode changed to Drilled and Cased |
1996-11-15 | Production Casing Operation Performed |
1996-11-15 | Well Log Performed |
1996-11-16 | Rig Released |
1996-11-30 | Perforation Treatment Performed - Jet Perforation |
1996-12-06 | Well Began Production |
1996-12-06 | Well Fluid changed to Crude Bitumen |
1996-12-06 | Well Mode changed to Pumping |
1998-03-24 | Well Fluid changed to Crude Bitumen |
1998-03-24 | Well Mode changed to Suspended |
2000-06-01 | Well Fluid changed to Crude Bitumen |
2000-06-01 | Well Mode changed to Pumping |
2000-06-05 | Perforation Treatment Performed - Jet Perforation |
2000-06-05 | Well Log Performed |
2000-07-26 | Well Log Performed |
2001-09-30 | Well Fluid changed to Crude Bitumen |
2001-09-30 | Well Mode changed to Suspended |
2011-09-18 | Perforation Treatment Performed - Cement Plug |
2011-09-18 | Perforation Treatment Performed - Jet Perforation |
2011-09-18 | Plug Back Performed |
2011-09-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-11-30 | Perforation | 379.50 | 380.50 | 26 |
2000-06-05 | Perforation | 379.50 | 382.50 | 39 |
2011-09-18 | Perforation | 360.30 | 363.00 | 26 |
2011-09-18 | Cement Plug | 382.00 | 487.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2772 | 0.0 | 0.0 | 0.0 |
2000 | 4044 | 0.0 | 0.0 | 0.0 |
For data sources see[5]