X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625110606002

Well Details

Well ID: 0625110606002
Loading map...
Location: 00/06-06-062-11W5/2
Location Alias: 00/06-06-62-11 W5M
Location Alias 2: 00/06-06-062-11 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 06
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 6-6-62-11
Operator Name: ACCEL Canada Holdings Limited
License Number: 0019644
License Date: 1960-09-07
License Status: Issued
Spud Date: 1960-09-29
Final Drill Date: 1960-11-07
Well Total Depth: 2715.80 m
Surface Hole Latitude: 54.332102
Surface Hole Longitude: -115.642053

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-07 Obtained License
1960-11-07 Finished Drilling
1960-11-07 Well Mode changed to Drilled and Cased
1960-11-09 Drill Stem Test Performed
1960-11-11 Drill Stem Test Performed
1960-11-13 Drill Stem Test Performed
1960-11-14 Production Casing Operation Performed
1960-11-22 Perforation Treatment Performed - Jet Perforation
1960-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-12 Perforation Treatment Performed - Jet Perforation
1981-08-17 Perforation Treatment Performed - Jet Perforation
1981-08-19 Perforation Treatment Performed - Jet Perforation
1981-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-02 Perforation Treatment Performed - Jet Perforation
1982-06-13 Well Began Production
1982-06-13 Well Fluid changed to Crude Oil
1982-06-13 Well Mode changed to Flowing
1987-12-01 Well Structure changed to Commingled
2006-11-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-22 Perforation 2644.70 2646.30 7
1981-08-17 Perforation 2667.90 2675.50 7
1981-08-19 Perforation 2649.90 2653.30 7
1981-08-19 Perforation 2644.70 2646.30 7
1981-08-19 Perforation 2642.60 2643.80 13
1981-08-19 Perforation 2634.10 2640.80 7
1981-08-20 Acid Treatment 2634.10 2675.50 0
1982-06-02 Perforation 2631.00 2632.20 13
1982-06-02 Acid Treatment 2631.00 2632.20 0
1960-11-22 Perforation 2649.90 2653.30 7
1960-11-22 Perforation 2667.90 2675.50 7
1960-11-25 Acid Treatment 2644.70 2675.50 0
1975-12-11 Packing Device Capped w/Cement 2641.70 2644.40 0
1975-12-12 Perforation 2634.10 2640.80 7
1975-12-12 Acid Treatment 2634.10 2640.80 0
1981-08-17 Perforation 2644.70 2646.30 7
1981-08-17 Perforation 2649.90 2653.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 630 0.0 0.0 0.0

For data sources see[5]

References