X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625110712000

Well Details

Well ID: 0625110712000
Loading map...
Location: 00/12-07-062-11W5/0
Location Alias: 00/12-07-62-11 W5M
Location Alias 2: 00/12-07-062-11 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 11
Section: 07
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 12-7-62-11
Operator Name: ACCEL Canada Holdings Limited
License Number: 0027750
License Date: 1965-02-12
License Status: Suspension
Spud Date: 1965-07-05
Final Drill Date: 1965-08-06
Well Total Depth: 2758.40 m
Surface Hole Latitude: 54.349559
Surface Hole Longitude: -115.649889

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-12 Obtained License
1965-07-05 Direction Drilling Operation Performed - 98
1965-08-06 Finished Drilling
1965-08-06 Well Mode changed to Drilled and Cased
1965-08-08 Production Casing Operation Performed
1965-08-11 Perforation Treatment Performed - Jet Perforation
1965-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-12 Well Began Production
1965-08-12 Well Fluid changed to Crude Oil
1965-08-12 Well Mode changed to Flowing
1980-10-23 Perforation Treatment Performed - Jet Perforation
1980-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-11 Well Fluid changed to Crude Oil
1981-02-11 Well Mode changed to Suspended
1989-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-22 Plug Back Performed
1989-10-22 Well Fluid changed to Crude Oil
1989-10-22 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1965-07-05 2539.90 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-11 Perforation 2667.00 2670.00 7
1965-08-12 Acid Treatment 2667.00 2670.00 0
1980-10-23 Perforation 2675.00 2684.50 13
1980-10-24 Acid Treatment 2675.00 2684.50 0
1989-10-22 Packing Device Capped w/Cement 2603.00 2653.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1973 7703 0.0 0.0 0.0
1974 7730 0.0 0.0 0.0
1975 8477 0.0 0.0 0.0
1976 8338 0.0 0.0 0.0
1977 2688 0.0 0.0 0.0
1980 3061 0.0 0.0 0.0
1981 763 0.0 0.0 0.0

For data sources see[6]

References