X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625120216000

Well Details

Well ID: 0625120216000
Loading map...
Location: 00/16-02-062-12W5/0
Location Alias: 00/16-02-62-12 W5M
Location Alias 2: 00/16-02-062-12 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 02
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-2-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0021600
License Date: 1961-10-27
License Status: Issued
Spud Date: 1961-12-07
Final Drill Date: 1962-01-31
Well Total Depth: 2718.80 m
Surface Hole Latitude: 54.339574
Surface Hole Longitude: -115.679636

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-27 Obtained License
1962-01-31 Finished Drilling
1962-01-31 Well Mode changed to Drilled and Cased
1962-02-02 Production Casing Operation Performed
1962-02-04 Perforation Treatment Performed - Jet Perforation
1962-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-09 Perforation Treatment Performed - Jet Perforation
1962-03-17 Well Began Production
1962-03-17 Well Fluid changed to Crude Oil
1962-03-17 Well Mode changed to Flowing
1962-09-07 Perforation Treatment Performed - Cement Squeeze
1962-09-10 Perforation Treatment Performed - Jet Perforation
1962-09-13 Perforation Treatment Performed - Acid Wash - No Pressure
1962-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-08-14 Perforation Treatment Performed - Cement Squeeze
1975-08-14 Well Fluid changed to Crude Oil
1975-08-14 Well Mode changed to Abandoned Zone
1975-08-17 Perforation Treatment Performed - Jet Perforation
1975-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-31 Perforation Treatment Performed - Jet Perforation
1986-10-31 Well Log Performed
1986-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-03 Well Fluid changed to Crude Oil
1986-11-03 Well Mode changed to Flowing
1987-01-28 Perforation Treatment Performed - Fractured
1987-04-02 Perforation Treatment Performed - Jet Perforation
1987-04-02 Well Log Performed
1987-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-15 Well Fluid changed to Crude Oil
1987-04-15 Well Mode changed to Flowing
1988-06-28 Well Fluid changed to Crude Oil
1988-06-28 Well Mode changed to Pumping
1990-08-31 Perforation Treatment Performed - Chemical Squeeze
1990-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-12 Perforation Treatment Performed - Chemical Squeeze
1993-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-20 Well Fluid changed to Crude Oil
1993-07-20 Well Mode changed to Suspended
1994-11-16 Well Log Performed
1994-11-17 Perforation Treatment Performed - Jet Perforation
1994-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-23 Well Log Performed
1995-08-12 Perforation Treatment Performed - Cement Squeeze
1995-08-15 Perforation Treatment Performed - Jet Perforation
1995-08-15 Well Log Performed
1995-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-24 Perforation Treatment Performed - Cement Squeeze
1999-12-13 Perforation Treatment Performed - Jet Perforation
1999-12-13 Well Log Performed
1999-12-14 Perforation Treatment Performed - Jet Perforation
1999-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-20 Well Log Performed
2000-02-24 Well Began Injection
2000-02-24 Well Fluid changed to Water
2000-02-24 Well Type changed to Injection
2007-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-10-01 Well Fluid changed to Water
2015-10-01 Well Mode changed to Suspended
2015-10-01 Well Type changed to Injection
2015-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-23 Well Log Performed
2016-12-01 Well Fluid changed to Water
2016-12-01 Well Type changed to Injection
2016-12-03 Well Log Performed
2016-12-07 Perforation Treatment Performed - Jet Perforation
2016-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-02-04 Perforation 2642.30 2644.70 7
1962-09-14 Acid Treatment 2658.50 2660.90 0
1975-08-14 Cement Squeeze 2642.30 2670.70 0
1975-08-17 Perforation 2636.20 2636.80 20
1975-08-18 Acid Treatment 2636.20 2636.80 0
1986-10-31 Perforation 2665.80 2667.60 13
1986-10-31 Perforation 2669.50 2670.70 13
1986-10-31 Perforation 2683.70 2687.40 13
1986-10-31 Perforation 2689.00 2693.00 13
1986-11-01 Acid Treatment 2665.80 2693.00 0
1987-01-28 Fracture 2665.80 2693.00 0
1962-02-04 Perforation 2665.80 2667.60 7
1987-04-02 Perforation 2658.50 2660.00 13
1987-04-03 Acid Treatment 2658.50 2660.00 0
1990-08-31 Chemical Squeeze 2658.50 2693.00 0
1990-09-01 Acid Treatment 2658.50 2693.00 0
1993-07-12 Chemical Squeeze 2658.50 2693.00 0
1993-07-16 Acid Treatment 2658.50 2693.00 0
1994-11-17 Perforation 2636.70 2646.70 13
1994-11-18 Acid Treatment 2636.70 2646.70 0
1995-08-12 Cement Squeeze 2636.10 2647.70 0
1995-08-15 Perforation 2646.90 2649.30 13
1962-02-04 Perforation 2669.40 2670.70 7
1995-08-16 Acid Treatment 2642.00 2649.30 0
1995-08-24 Cement Squeeze 2636.10 2645.00 0
1999-12-13 Perforation 2695.80 2698.40 16
1999-12-13 Perforation 2700.20 2701.80 16
1999-12-14 Perforation 2642.60 2646.30 16
1999-12-14 Perforation 2646.80 2649.30 16
1999-12-17 Acid Treatment 2642.60 2701.80 0
2007-03-27 Acid Treatment 2642.60 2701.80 0
2008-08-25 Acid Treatment 2642.60 2701.80 0
2009-08-19 Acid Treatment 2642.60 2701.80 0
1962-02-06 Acid Treatment 2642.30 2670.70 0
2010-05-28 Acid Treatment 2642.60 2701.80 0
2011-08-10 Acid Treatment 2642.60 2701.80 0
2012-03-07 Acid Treatment 2642.60 2701.80 0
2015-10-23 Packing Device Capped w/Cement 2626.80 2627.20 0
2016-12-07 Perforation 2636.10 2641.00 14
2016-12-08 Acid Treatment 2636.10 2701.80 0
1962-03-09 Perforation 2658.80 2660.00 7
1962-09-07 Cement Squeeze 2642.30 2670.70 0
1962-09-10 Perforation 2642.30 2644.70 7
1962-09-10 Perforation 2658.50 2660.90 7
1962-09-13 Acid Wash 2642.30 2644.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 1139 0.0 0.0 0.0
1970 1043 0.0 0.0 0.0
1971 4308 0.0 0.0 0.0
1972 6686 0.0 0.0 0.0
1973 1314 0.0 0.0 0.0
1974 79 0.0 0.0 0.0
1986 1153 0.0 0.0 0.0
1987 6619 0.0 0.0 0.0
1988 7707 0.0 0.0 0.0
1989 8531 0.0 0.0 0.0
1990 8293 0.0 0.0 0.0
1991 8288 0.0 0.0 0.0
1992 8472 0.0 0.0 0.0
1993 4246 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-07 No Incident Encountered 0.00 0.00
2015-10-23 No Incident Encountered 0.00 0.00
2016-12-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References