X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625120306002

Well Details

Well ID: 0625120306002
Loading map...
Location: 00/06-03-062-12W5/2
Location Alias: 00/06-03-62-12 W5M
Location Alias 2: 00/06-03-062-12 W5/02
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 03
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 6-3-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0019105
License Date: 1960-05-30
License Status: Suspension
Spud Date: 1960-06-15
Final Drill Date: 1960-07-25
Well Total Depth: 2728.60 m
Surface Hole Latitude: 54.332498
Surface Hole Longitude: -115.717268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-05-30 Obtained License
1960-07-25 Finished Drilling
1960-07-25 Well Mode changed to Drilled and Cased
1960-07-27 Production Casing Operation Performed
1960-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-07-31 Perforation Treatment Performed - Jet Perforation
1960-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-08-02 Perforation Treatment Performed - Jet Perforation
1960-08-03 Perforation Treatment Performed - Jet Perforation
1960-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-07 Perforation Treatment Performed - Cement Squeeze
1960-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-09 Perforation Treatment Performed - Jet Perforation
1960-08-10 Perforation Treatment Performed - Cement Squeeze
1960-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-12 Perforation Treatment Performed - Jet Perforation
1960-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-24 Well Began Production
1960-08-24 Well Fluid changed to Crude Oil
1960-08-24 Well Mode changed to Flowing
1960-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-21 Perforation Treatment Performed - Jet Perforation
1963-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-24 Well Fluid changed to Crude Oil
1986-12-24 Well Mode changed to Pumping
1988-02-05 Perforation Treatment Performed - Jet Perforation
1988-02-05 Well Log Performed
1988-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-21 Well Structure changed to Commingled
1995-04-07 Perforation Treatment Performed - Cement Squeeze
1995-04-12 Perforation Treatment Performed - Cement Squeeze
1995-04-17 Perforation Treatment Performed - Jet Perforation
1995-04-17 Well Log Performed
1995-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-18 Well Log Performed
1996-05-19 Well Log Performed
1997-03-17 Well Log Performed
2000-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-31 Perforation 2656.90 2658.20 13
1960-08-09 Acid Treatment 2642.60 2645.70 0
1960-08-10 Cement Squeeze 2642.60 2645.70 0
1960-08-12 Perforation 2642.60 2645.70 13
1960-08-12 Acid Treatment 2642.60 2645.70 0
1960-08-17 Acid Treatment 2642.60 2645.70 0
1960-08-19 Acid Treatment 2615.80 2618.80 0
1960-08-23 Acid Treatment 2615.80 2618.80 0
1960-11-04 Acid Treatment 2642.60 2645.70 0
1963-02-21 Perforation 2638.70 2640.20 13
1963-02-21 Acid Treatment 2638.70 2645.70 0
1960-07-31 Perforation 2659.10 2660.90 13
1963-03-04 Acid Treatment 2638.70 2645.70 0
1988-02-05 Perforation 2604.80 2609.10 13
1988-02-05 Perforation 2610.30 2612.80 13
1988-02-06 Acid Treatment 2604.80 2618.80 0
1989-06-18 Acid Treatment 2638.70 2645.70 0
1995-04-07 Cement Squeeze 2638.70 2645.80 0
1995-04-12 Cement Squeeze 2604.90 2618.80 0
1995-04-17 Perforation 2604.80 2608.00 16
1995-04-18 Acid Treatment 2604.80 2608.00 0
2000-05-04 Acid Treatment 2604.80 2660.90 0
1960-07-31 Acid Treatment 2656.90 2660.90 0
2007-04-04 Acid Treatment 2604.80 2608.00 0
1960-08-02 Packing Device Capped w/Cement 2651.80 2651.80 0
1960-08-02 Perforation 2615.80 2618.80 13
1960-08-03 Perforation 2642.60 2645.70 13
1960-08-04 Acid Treatment 2615.80 2645.70 0
1960-08-07 Cement Squeeze 2642.60 2645.70 0
1960-08-09 Perforation 2642.60 2645.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 24 0.0 0.0 0.0
1968 48 0.0 0.0 0.0
1969 164 0.0 0.0 0.0
1970 2355 0.0 0.0 0.0
1971 4385 0.0 0.0 0.0
1972 1536 0.0 0.0 0.0
1973 312 0.0 0.0 0.0
1981 46 0.0 0.0 0.0
1986 2006 0.0 0.0 0.0
1987 4032 0.0 0.0 0.0
1988 7056 0.0 0.0 0.0
1989 3869 0.0 0.0 0.0

For data sources see[5]

References