X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625121816000

Well Details

Well ID: 0625121816000
Loading map...
Location: 00/16-18-062-12W5/0
Location Alias: 00/16-18-62-12 W5M
Location Alias 2: 00/16-18-062-12 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 12
Section: 18
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSONN 16-18-62-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0038893
License Date: 1970-09-30
License Status: Suspension
Spud Date: 1970-10-03
Final Drill Date: 1970-10-22
Well Total Depth: 2725.50 m
Surface Hole Latitude: 54.367233
Surface Hole Longitude: -115.780730

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-30 Obtained License
1970-10-22 Finished Drilling
1970-10-22 Well Mode changed to Drilled and Cased
1970-10-25 Production Casing Operation Performed
1970-11-17 Perforation Treatment Performed - Jet Perforation
1970-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-18 Perforation Treatment Performed - Jet Perforation
1970-11-28 Well Began Production
1970-11-28 Well Fluid changed to Crude Oil
1970-11-28 Well Mode changed to Flowing
1978-09-01 Perforation Treatment Performed - Jet Perforation
1978-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-02 Perforation Treatment Performed - Cement Squeeze
1978-09-04 Perforation Treatment Performed - Jet Perforation
1978-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-25 Perforation Treatment Performed - Jet Perforation
1982-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-31 Well Fluid changed to Crude Oil
1987-08-31 Well Mode changed to Suspended
1987-10-08 Well Log Performed
1990-10-22 Perforation Treatment Performed - Jet Perforation
1990-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-01 Perforation Treatment Performed - Jet Perforation
1994-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-15 Perforation Treatment Performed - Jet Perforation
2003-11-16 Perforation Treatment Performed - Jet Perforation
2003-11-16 Well Log Performed
2003-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-24 Well Log Performed
2007-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-11-17 Perforation 2672.50 2677.70 7
1978-09-04 Perforation 2688.90 2692.60 7
1978-09-05 Acid Treatment 2672.20 2692.60 0
1982-06-25 Perforation 2684.70 2685.90 13
1982-06-26 Acid Treatment 2684.70 2692.60 0
1990-10-22 Perforation 2672.20 2679.50 13
1990-10-24 Acid Treatment 2672.20 2679.50 0
1992-11-27 Acid Treatment 2672.20 2679.50 0
1994-06-01 Perforation 2665.80 2668.20 13
1994-06-01 Perforation 2669.40 2671.30 13
1994-06-03 Acid Treatment 2665.80 2671.30 0
1970-11-18 Acid Treatment 2672.50 2677.70 0
1999-01-25 Acid Treatment 2665.80 2679.50 0
2000-06-22 Acid Treatment 2665.80 2679.50 0
2001-05-16 Acid Treatment 2665.80 2679.50 0
2003-11-15 Perforation 2694.30 2696.30 16
2003-11-15 Perforation 2698.00 2709.70 16
2003-11-16 Perforation 2683.70 2687.20 16
2003-11-16 Perforation 2688.30 2694.30 16
2003-11-17 Acid Treatment 2683.70 2687.20 0
2003-11-17 Acid Treatment 2688.30 2696.30 0
2003-11-17 Acid Treatment 2698.00 2709.70 0
1970-11-18 Perforation 2688.90 2692.90 7
2003-11-17 Acid Treatment 2665.80 2668.20 0
2003-11-17 Acid Treatment 2669.40 2671.30 0
2003-11-17 Acid Treatment 2672.20 2679.50 0
2007-03-29 Acid Treatment 2665.80 2709.70 0
2009-10-08 Acid Treatment 2665.80 2709.70 0
2010-11-19 Acid Treatment 2665.80 2709.70 0
2014-05-23 Acid Treatment 2665.80 2709.70 0
2016-02-13 Packing Device Capped w/Cement 2643.40 2651.40 0
1970-11-18 Acid Treatment 2688.90 2692.90 0
1978-09-01 Perforation 2696.40 2698.80 13
1978-09-02 Acid Treatment 2696.40 2698.80 0
1978-09-02 Cement Squeeze 2696.40 2698.80 0
1978-09-02 Packing Device Capped w/Cement 2694.80 2695.00 0
1978-09-04 Perforation 2672.20 2677.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 21 0.0 0.0 0.0
1971 1319 0.0 0.0 0.0
1972 2057 0.0 0.0 0.0
1973 3407 0.0 0.0 0.0
1974 3023 0.0 0.0 0.0
1975 1071 0.0 0.0 0.0
1976 1582 0.0 0.0 0.0
1977 2669 0.0 0.0 0.0
1978 4218 0.0 0.0 0.0
1979 7176 0.0 0.0 0.0
1980 5659 0.0 0.0 0.0
1981 3165 0.0 0.0 0.0
1982 4378 0.0 0.0 0.0
1983 1150 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-23 No Incident Encountered 0.00 0.00
2016-02-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References