If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625160911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.352022,"lon":-116.344429,"icon":""}]} |
Location: 00/11-09-062-16W5/0 | |
Location Alias: 00/11-09-62-16 W5M | |
Location Alias 2: 00/11-09-062-16 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 16 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ESSO B-1 TWO CREEK 11-9-62-16 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0060133 | |
License Date: 1976-09-10 | |
License Status: RecCertified | |
Spud Date: 1976-09-16 | |
Final Drill Date: 1976-11-06 | |
Well Total Depth: 3053.50 m | |
Surface Hole Latitude: 54.352022 | |
Surface Hole Longitude: -116.344429 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-09-10 | Obtained License |
1976-11-02 | Drill Stem Test Performed |
1976-11-06 | Finished Drilling |
1976-11-09 | Production Casing Operation Performed |
1977-01-10 | Perforation Treatment Performed - Jet Perforation |
1977-01-31 | Well Mode changed to Drilled and Cased |
1981-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-17 | Perforation Treatment Performed - Cement Squeeze |
1981-03-17 | Perforation Treatment Performed - Jet Perforation |
1981-03-23 | Perforation Treatment Performed - Cement Squeeze |
1981-03-24 | Perforation Treatment Performed - Jet Perforation |
1981-11-23 | Perforation Treatment Performed - Fractured |
1991-01-05 | Well Fluid changed to Gas |
1991-01-05 | Well Mode changed to Testing |
1991-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-01-06 | Plug Back Performed |
1991-01-06 | Well Fluid changed to Gas |
1991-01-06 | Well Mode changed to Abandoned |
1991-01-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-01-10 | Perforation | 2979.10 | 2981.90 | 7 |
1991-01-06 | Packing Device Capped w/Cement | 1795.00 | 1803.00 | 0 |
1981-03-16 | Packing Device Capped w/Cement | 2907.00 | 2907.00 | 0 |
1981-03-17 | Perforation | 1871.50 | 1872.40 | 3 |
1981-03-17 | Acid Treatment | 1871.50 | 1872.40 | 0 |
1981-03-17 | Cement Squeeze | 1871.50 | 1872.40 | 0 |
1981-03-23 | Cement Squeeze | 1871.50 | 1872.40 | 0 |
1981-03-24 | Perforation | 1835.50 | 1837.00 | 3 |
1981-03-24 | Perforation | 1842.80 | 1847.70 | 4 |
1981-11-23 | Fracture | 1835.70 | 1847.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 160 | 0.0 | 0.0 | 0.0 |
For data sources see[5]