X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625160911000

Well Details

Well ID: 0625160911000
Loading map...
Location: 00/11-09-062-16W5/0
Location Alias: 00/11-09-62-16 W5M
Location Alias 2: 00/11-09-062-16 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 16
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: ESSO B-1 TWO CREEK 11-9-62-16
Operator Name: Imperial Oil Resources Limited
License Number: 0060133
License Date: 1976-09-10
License Status: RecCertified
Spud Date: 1976-09-16
Final Drill Date: 1976-11-06
Well Total Depth: 3053.50 m
Surface Hole Latitude: 54.352022
Surface Hole Longitude: -116.344429

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-10 Obtained License
1976-11-02 Drill Stem Test Performed
1976-11-06 Finished Drilling
1976-11-09 Production Casing Operation Performed
1977-01-10 Perforation Treatment Performed - Jet Perforation
1977-01-31 Well Mode changed to Drilled and Cased
1981-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-17 Perforation Treatment Performed - Cement Squeeze
1981-03-17 Perforation Treatment Performed - Jet Perforation
1981-03-23 Perforation Treatment Performed - Cement Squeeze
1981-03-24 Perforation Treatment Performed - Jet Perforation
1981-11-23 Perforation Treatment Performed - Fractured
1991-01-05 Well Fluid changed to Gas
1991-01-05 Well Mode changed to Testing
1991-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-06 Plug Back Performed
1991-01-06 Well Fluid changed to Gas
1991-01-06 Well Mode changed to Abandoned
1991-01-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-10 Perforation 2979.10 2981.90 7
1991-01-06 Packing Device Capped w/Cement 1795.00 1803.00 0
1981-03-16 Packing Device Capped w/Cement 2907.00 2907.00 0
1981-03-17 Perforation 1871.50 1872.40 3
1981-03-17 Acid Treatment 1871.50 1872.40 0
1981-03-17 Cement Squeeze 1871.50 1872.40 0
1981-03-23 Cement Squeeze 1871.50 1872.40 0
1981-03-24 Perforation 1835.50 1837.00 3
1981-03-24 Perforation 1842.80 1847.70 4
1981-11-23 Fracture 1835.70 1847.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 160 0.0 0.0 0.0

For data sources see[5]

References