X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625251007020

Well Details

Well ID: 0625251007020
Loading map...
Location: 02/07-10-062-25W5/0
Location Alias: 02/07-10-62-25 W5M
Location Alias 2: 02/07-10-062-25 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 25
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA 102 HZ WAHIGAN 7-10-62-25
Operator Name: Ovintiv Canada ULC
License Number: 0469003
License Date: 2014-08-12
License Status: Amended
Spud Date: 2014-10-25
Final Drill Date: 2014-12-22
Well Total Depth: 6715.00 m
Surface Hole Latitude: 54.328224
Surface Hole Longitude: -117.634213

For data sources see[1][2]

Well History

Date Event
2014-08-12 Obtained License
2014-10-26 Surface Casing Operation Performed
2014-11-06 Direction Drilling Operation Performed - Deviate
2014-11-24 Intermediate Casing Operation Performed
2014-11-24 Liner Casing Operation Performed
2014-12-03 Direction Drilling Operation Performed - Horizontal
2014-12-04 Well Log Performed
2014-12-22 Finished Drilling
2014-12-22 Well Log Performed
2014-12-22 Well Mode changed to Drilled and Cased
2014-12-24 Well Log Performed
2014-12-28 Rig Released
2015-08-02 Well Log Performed
2015-08-17 Perforation Treatment Performed - Jet Perforation
2015-08-25 Perforation Treatment Performed - Jet Perforation
2015-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-26 Perforation Treatment Performed - Fractured
2015-08-26 Perforation Treatment Performed - Jet Perforation
2015-08-27 Perforation Treatment Performed - Fractured
2015-08-27 Perforation Treatment Performed - Jet Perforation
2015-08-28 Perforation Treatment Performed - Fractured
2015-08-28 Perforation Treatment Performed - Jet Perforation
2015-08-29 Perforation Treatment Performed - Fractured
2015-08-29 Perforation Treatment Performed - Jet Perforation
2015-08-30 Perforation Treatment Performed - Fractured
2015-08-30 Perforation Treatment Performed - Jet Perforation
2015-08-31 Perforation Treatment Performed - Fractured
2015-08-31 Perforation Treatment Performed - Jet Perforation
2015-09-01 Perforation Treatment Performed - Fractured
2015-09-01 Perforation Treatment Performed - Jet Perforation
2015-09-02 Perforation Treatment Performed - Fractured
2015-09-02 Perforation Treatment Performed - Jet Perforation
2015-09-03 Perforation Treatment Performed - Fractured
2015-09-03 Perforation Treatment Performed - Jet Perforation
2015-09-04 Perforation Treatment Performed - Fractured
2015-09-04 Perforation Treatment Performed - Jet Perforation
2015-09-05 Perforation Treatment Performed - Fractured
2015-09-05 Perforation Treatment Performed - Jet Perforation
2015-09-06 Perforation Treatment Performed - Fractured
2015-09-06 Perforation Treatment Performed - Jet Perforation
2015-09-07 Perforation Treatment Performed - Fractured
2015-09-07 Perforation Treatment Performed - Jet Perforation
2015-09-08 Perforation Treatment Performed - Fractured
2015-09-08 Perforation Treatment Performed - Jet Perforation
2015-09-09 Perforation Treatment Performed - Fractured
2015-09-09 Perforation Treatment Performed - Jet Perforation
2015-09-10 Perforation Treatment Performed - Fractured
2015-09-10 Perforation Treatment Performed - Jet Perforation
2015-09-11 Perforation Treatment Performed - Fractured
2015-09-11 Perforation Treatment Performed - Jet Perforation
2015-09-12 Perforation Treatment Performed - Fractured
2015-09-12 Perforation Treatment Performed - Jet Perforation
2015-09-13 Perforation Treatment Performed - Fractured
2015-09-14 Perforation Treatment Performed - Jet Perforation
2015-09-17 Perforation Treatment Performed - Fractured
2015-09-17 Perforation Treatment Performed - Jet Perforation
2015-09-18 Perforation Treatment Performed - Fractured
2015-09-18 Perforation Treatment Performed - Jet Perforation
2015-09-19 Perforation Treatment Performed - Fractured
2015-09-20 Perforation Treatment Performed - Jet Perforation
2015-09-21 Perforation Treatment Performed - Fractured
2015-09-21 Perforation Treatment Performed - Jet Perforation
2015-09-22 Perforation Treatment Performed - Fractured
2015-09-22 Perforation Treatment Performed - Jet Perforation
2015-11-21 Well Fluid changed to Shale Gas Only
2015-11-21 Well Mode changed to Testing
2015-11-22 Well Began Production
2015-11-22 Well Fluid changed to Shale Gas Only
2015-11-22 Well Mode changed to Flowing
2017-02-15 Well Fluid changed to Shale Gas Only
2017-02-15 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-25 Precision Drilling Corporation 571 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-06 898.00 Deviate (5 - 79 degrees)
2014-12-03 4034.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-17 Perforation 6603.00 6604.50 20
2015-08-26 Perforation 6461.00 6462.50 20
2015-09-07 Perforation 5188.00 5189.50 20
2015-09-07 Perforation 5205.00 5206.50 20
2015-09-07 Perforation 5222.00 5223.50 20
2015-09-07 Perforation 5239.00 5240.50 20
2015-09-07 Fracture 5188.00 5240.50 0
2015-09-08 Perforation 4987.00 4988.50 20
2015-09-08 Perforation 5004.00 5005.50 20
2015-09-08 Perforation 5021.00 5022.50 20
2015-09-08 Perforation 5054.00 5055.50 20
2015-09-08 Perforation 5071.00 5072.50 20
2015-08-26 Perforation 6479.00 6480.50 20
2015-09-08 Perforation 5088.00 5089.50 20
2015-09-08 Perforation 5105.00 5106.50 20
2015-09-08 Fracture 5054.00 5106.50 0
2015-09-08 Fracture 5121.00 5173.50 0
2015-09-09 Perforation 4920.00 4921.50 20
2015-09-09 Perforation 4937.00 4938.50 20
2015-09-09 Perforation 4954.00 4955.50 20
2015-09-09 Perforation 4970.00 4971.50 20
2015-09-09 Fracture 4920.00 4971.50 0
2015-09-09 Fracture 4987.00 5022.50 0
2015-08-26 Perforation 6497.00 6498.50 20
2015-09-10 Perforation 4786.00 4787.50 20
2015-09-10 Perforation 4803.00 4804.50 20
2015-09-10 Perforation 4819.00 4820.50 20
2015-09-10 Perforation 4836.00 4837.50 20
2015-09-10 Perforation 4853.00 4854.50 20
2015-09-10 Perforation 4870.00 4871.50 20
2015-09-10 Perforation 4886.00 4887.50 20
2015-09-10 Perforation 4903.00 4904.50 20
2015-09-10 Fracture 4853.00 4904.50 0
2015-09-11 Perforation 4719.00 4720.50 20
2015-08-26 Perforation 6514.00 6515.50 20
2015-09-11 Perforation 4735.00 4736.50 20
2015-09-11 Perforation 4752.00 4753.50 20
2015-09-11 Perforation 4769.00 4770.50 20
2015-09-11 Fracture 4719.00 4770.50 0
2015-09-11 Fracture 4786.00 4837.50 0
2015-09-12 Perforation 4584.00 4585.50 20
2015-09-12 Perforation 4601.00 4602.50 20
2015-09-12 Perforation 4618.00 4619.50 20
2015-09-12 Perforation 4635.00 4636.50 20
2015-09-12 Perforation 4652.00 4653.50 20
2015-08-26 Fracture 6461.00 6515.50 0
2015-09-12 Perforation 4668.00 4669.50 20
2015-09-12 Perforation 4685.00 4686.50 20
2015-09-12 Perforation 4702.00 4703.50 20
2015-09-12 Fracture 4652.00 4703.50 0
2015-09-13 Fracture 4584.00 4636.50 0
2015-09-14 Perforation 4517.00 4518.50 20
2015-09-14 Perforation 4534.00 4535.50 20
2015-09-14 Perforation 4551.00 4552.50 20
2015-09-14 Perforation 4568.00 4569.50 20
2015-09-17 Perforation 4383.00 4384.50 20
2015-08-26 Fracture 6532.00 6586.50 0
2015-09-17 Perforation 4400.00 4401.50 20
2015-09-17 Perforation 4417.00 4418.50 20
2015-09-17 Perforation 4434.00 4435.50 20
2015-09-17 Perforation 4450.00 4451.50 20
2015-09-17 Perforation 4467.00 4468.50 20
2015-09-17 Perforation 4484.00 4485.50 20
2015-09-17 Perforation 4501.00 4502.50 20
2015-09-17 Fracture 4450.00 4502.50 0
2015-09-17 Fracture 4517.00 4569.50 0
2015-09-18 Perforation 4316.00 4317.50 20
2015-08-27 Perforation 6260.00 6261.50 20
2015-09-18 Perforation 4333.00 4334.50 20
2015-09-18 Perforation 4350.00 4351.50 20
2015-09-18 Perforation 4366.00 4367.50 20
2015-09-18 Fracture 4383.00 4435.50 0
2015-09-19 Fracture 4316.00 4367.50 0
2015-09-20 Perforation 4249.00 4250.50 20
2015-09-20 Perforation 4266.00 4267.50 20
2015-09-20 Perforation 4283.00 4284.50 20
2015-09-20 Perforation 4299.00 4300.50 20
2015-09-21 Perforation 4048.00 4049.50 20
2015-08-27 Perforation 6277.00 6278.50 20
2015-09-21 Perforation 4064.00 4065.50 20
2015-09-21 Perforation 4081.00 4082.50 20
2015-09-21 Perforation 4098.00 4099.50 20
2015-09-21 Perforation 4115.00 4116.50 20
2015-09-21 Perforation 4132.00 4133.50 20
2015-09-21 Perforation 4148.00 4149.50 20
2015-09-21 Perforation 4165.00 4166.50 20
2015-09-21 Perforation 4182.00 4183.50 20
2015-09-21 Perforation 4199.00 4200.50 20
2015-09-21 Perforation 4215.00 4216.50 20
2015-08-27 Perforation 6295.00 6296.50 20
2015-09-21 Perforation 4232.00 4233.50 20
2015-09-21 Fracture 4115.00 4166.50 0
2015-09-21 Fracture 4182.00 4233.50 0
2015-09-21 Fracture 4249.00 4300.50 0
2015-09-22 Perforation 3981.00 3982.50 20
2015-09-22 Perforation 3997.00 3998.50 20
2015-09-22 Perforation 4014.00 4015.50 20
2015-09-22 Perforation 4031.00 4032.50 20
2015-09-22 Fracture 3981.00 4032.50 0
2015-09-22 Fracture 4048.00 4099.50 0
2015-08-27 Perforation 6313.00 6314.50 20
2015-08-17 Perforation 6621.00 6622.50 20
2015-08-27 Perforation 6391.00 6392.50 20
2015-08-27 Perforation 6408.00 6409.50 20
2015-08-27 Perforation 6426.00 6427.50 20
2015-08-27 Perforation 6444.00 6445.50 20
2015-08-27 Fracture 6260.00 6314.50 0
2015-08-27 Fracture 6391.00 6445.50 0
2015-08-28 Perforation 6121.00 6122.50 20
2015-08-28 Perforation 6139.00 6140.50 20
2015-08-28 Perforation 6156.00 6157.50 20
2015-08-28 Perforation 6173.00 6174.50 20
2015-08-17 Perforation 6638.00 6639.50 20
2015-08-28 Perforation 6190.00 6191.50 20
2015-08-28 Perforation 6208.00 6209.50 20
2015-08-28 Perforation 6225.00 6226.50 20
2015-08-28 Perforation 6242.00 6243.50 20
2015-08-28 Fracture 6190.00 6243.50 0
2015-08-29 Perforation 6052.00 6053.50 20
2015-08-29 Perforation 6070.00 6071.50 20
2015-08-29 Perforation 6087.00 6088.50 20
2015-08-29 Perforation 6104.00 6105.50 20
2015-08-29 Fracture 6052.00 6105.50 0
2015-08-17 Perforation 6656.00 6657.50 20
2015-08-29 Fracture 6121.00 6174.50 0
2015-08-30 Perforation 5983.00 5984.50 20
2015-08-30 Perforation 6001.00 6002.50 20
2015-08-30 Perforation 6018.00 6019.50 20
2015-08-30 Perforation 6035.00 6036.50 20
2015-08-30 Fracture 5983.00 6036.50 0
2015-08-31 Perforation 5792.00 5793.50 20
2015-08-31 Perforation 5809.00 5810.50 20
2015-08-31 Perforation 5826.00 5827.50 20
2015-08-31 Perforation 5843.00 5844.50 20
2015-08-25 Perforation 6532.00 6533.50 20
2015-08-31 Perforation 5859.00 5860.50 20
2015-08-31 Perforation 5877.00 5878.50 20
2015-08-31 Perforation 5894.00 5895.50 20
2015-08-31 Perforation 5911.00 5912.50 20
2015-08-31 Fracture 5792.00 5844.50 0
2015-08-31 Fracture 5859.00 5912.50 0
2015-09-01 Perforation 5725.00 5726.50 20
2015-09-01 Perforation 5742.00 5743.50 20
2015-09-01 Perforation 5759.00 5760.50 20
2015-09-01 Perforation 5776.00 5777.50 20
2015-08-25 Perforation 6550.00 6551.50 20
2015-09-01 Fracture 5725.00 5777.50 0
2015-09-02 Perforation 5658.00 5659.50 20
2015-09-02 Perforation 5675.00 5676.50 20
2015-09-02 Perforation 5692.00 5693.50 20
2015-09-02 Perforation 5708.00 5709.50 20
2015-09-02 Fracture 5658.00 5709.50 0
2015-09-03 Perforation 5591.00 5592.50 20
2015-09-03 Perforation 5608.00 5609.50 20
2015-09-03 Perforation 5625.00 5626.50 20
2015-09-03 Perforation 5641.00 5642.50 20
2015-08-25 Perforation 6568.00 6569.50 20
2015-09-03 Fracture 5591.00 5642.50 0
2015-09-04 Perforation 5457.00 5458.50 20
2015-09-04 Perforation 5474.00 5475.50 20
2015-09-04 Perforation 5490.00 5491.50 20
2015-09-04 Perforation 5507.00 5508.50 20
2015-09-04 Perforation 5524.00 5525.50 20
2015-09-04 Perforation 5541.00 5542.50 20
2015-09-04 Perforation 5557.00 5558.50 20
2015-09-04 Perforation 5574.00 5575.50 20
2015-09-04 Fracture 5457.00 5508.50 0
2015-08-25 Perforation 6585.00 6586.50 20
2015-09-04 Fracture 5524.00 5575.50 0
2015-09-05 Perforation 5390.00 5391.50 20
2015-09-05 Perforation 5406.00 5407.50 20
2015-09-05 Perforation 5423.00 5424.50 20
2015-09-05 Perforation 5440.00 5441.50 20
2015-09-05 Fracture 5390.00 5441.50 0
2015-09-06 Perforation 5255.00 5256.50 20
2015-09-06 Perforation 5272.00 5273.50 20
2015-09-06 Perforation 5289.00 5290.50 20
2015-09-06 Perforation 5306.00 5307.50 20
2015-08-25 Multi-Stage Fracture 6603.00 6671.30 0
2015-09-06 Perforation 5323.00 5324.50 20
2015-09-06 Perforation 5339.00 5340.50 20
2015-09-06 Perforation 5356.00 5357.50 20
2015-09-06 Perforation 5373.00 5374.50 20
2015-09-06 Fracture 5255.00 5307.50 0
2015-09-06 Fracture 5323.00 5374.50 0
2015-09-07 Perforation 5121.00 5122.50 20
2015-09-07 Perforation 5138.00 5139.50 20
2015-09-07 Perforation 5155.00 5156.50 20
2015-09-07 Perforation 5172.00 5173.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-25 2015-09-22 3,925 47,344 N/A
2 2015-08-25 2015-09-06 3,925 0 N/A
3 2015-09-07 2015-09-22 3,925 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.4478 N/A
Sand (40/70) Source Energy;SuperiorSilica;Canadian Silica Aluminum Oxide 1344-28-1 100 12.2298 N/A
Crystalline silica. quartz 14808-60-7 100 12.2298 N/A
Iron Oxide 1309-37-1 100 12.2298 N/A
Titanium Oxide 13463-67-7 100 12.2297 N/A
Sand (50/140) Source Energy;SuperiorSilica;Canadian Silica Aluminum Oxide 1344-28-1 100 1.3785 N/A
Crystalline silica. quartz 14808-60-7 100 1.3785 N/A
Iron Oxide 1309-37-1 100 1.3785 N/A
Titanium Oxide 13463-67-7 100 1.3784 N/A
CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0041 N/A
Crystalline silica. quartz 14808-60-7 100 0.0041 N/A
CAN-2102 pH Buffer (HpH) Canyon Buffer Methyl Alcohol 67-56-1 100 0.1286 N/A
Sodium Hydroxide 1310-73-2 100 0.1286 N/A
Water 7732-18-5 100 0.1286 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0036 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.0881 N/A
Monoethanolamine 141-43-5 100 0.0881 N/A
Water 7732-18-5 100 0.0881 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0018 N/A
FE 73W EFOS Polymer LLC Friction Reducer Alcohols. C12-16. ethoxylated propoxylated 68213-24-1 100 0.0971 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0971 N/A
Ethylene glycol 107-21-1 100 0.0971 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0971 N/A
Polyoxyethylene alkyl ether phosphate 68585-36-4 100 0.0971 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.2351 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0029 N/A
Cupric Chloride 7447-39-4 100 0.0029 N/A
Monoethanolamine 141-43-5 100 0.0029 N/A
CAN-1402 Scale Inhibitor Canyon Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0103 N/A
Potassium Chloride 7447-40-7 100 0.0104 N/A
Water 7732-18-5 100 0.0103 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0013 N/A
Water 7732-18-5 100 0.0013 N/A
2 HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 0.3614 N/A
Water 7732-18-5 100 0.3614 N/A
3 HCL 15% Third Party Acid Hydrogen Chloride 7647-01-0 100 0.3794 N/A
Water 7732-18-5 100 0.3794 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-28 2015-09-27 Groundwater - Non-saline less than or equal to 150m deep 6781
2015-07-29 2015-08-31 Groundwater - Non-saline less than or equal to 150m deep 990
2015-07-29 2015-08-31 Groundwater - Non-saline greater than 150m deep 688
2015-08-10 2015-09-23 Surface Water - Runoff 38074
2015-05-22 2015-09-23 Groundwater - Non-saline less than or equal to 150m deep 520
2015-05-01 2015-09-23 Groundwater - Non-saline less than or equal to 150m deep 505
2015-04-03 2015-04-30 Groundwater - Non-saline less than or equal to 150m deep 365
2015-04-03 2015-04-30 Groundwater - Non-saline less than or equal to 150m deep 276
2015-06-07 2015-07-28 Central Water Distribution Facility 26895

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 976 0.0 0.0 0.0
2016 8304 0.0 0.0 0.0
2017 8612 0.0 0.0 0.0
2018 7335 0.0 0.0 0.0
2019 8598 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-28 No Incident Encountered 0.00 0.00
2015-10-08 No Incident Encountered 0.00 0.00
2015-08-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References