X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625251009000

Well Details

Well ID: 0625251009000
Loading map...
Location: 00/09-10-062-25W5/0
Location Alias: 00/09-10-62-25 W5M
Location Alias 2: 00/09-10-062-25 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 25
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA HZ WAHIGAN 9-10-62-25
Operator Name: Ovintiv Canada ULC
License Number: 0469002
License Date: 2014-08-12
License Status: Amended
Spud Date: 2014-12-30
Final Drill Date: 2015-02-24
Well Total Depth: 6922.00 m
Surface Hole Latitude: 54.328134
Surface Hole Longitude: -117.634194

For data sources see[1][2]

Well History

Date Event
2014-08-12 Obtained License
2015-01-01 Surface Casing Operation Performed
2015-01-04 Direction Drilling Operation Performed - Deviate
2015-01-22 Intermediate Casing Operation Performed
2015-01-29 Direction Drilling Operation Performed - Horizontal
2015-02-01 Well Log Performed
2015-02-02 Well Log Performed
2015-02-24 Finished Drilling
2015-02-24 Well Log Performed
2015-02-24 Well Mode changed to Drilled and Cased
2015-02-26 Liner Casing Operation Performed
2015-02-26 Perforation Treatment Performed - Open-Hole Completion
2015-02-26 Well Log Performed
2015-03-03 Rig Released
2015-07-31 Well Log Performed
2015-08-19 Perforation Treatment Performed - Jet Perforation
2015-08-25 Perforation Treatment Performed - Fractured
2015-08-26 Perforation Treatment Performed - Fractured
2015-08-26 Perforation Treatment Performed - Jet Perforation
2015-08-27 Perforation Treatment Performed - Fractured
2015-08-27 Perforation Treatment Performed - Jet Perforation
2015-08-28 Perforation Treatment Performed - Fractured
2015-08-28 Perforation Treatment Performed - Jet Perforation
2015-08-29 Perforation Treatment Performed - Fractured
2015-08-29 Perforation Treatment Performed - Jet Perforation
2015-08-30 Perforation Treatment Performed - Fractured
2015-08-30 Perforation Treatment Performed - Jet Perforation
2015-08-31 Perforation Treatment Performed - Fractured
2015-08-31 Perforation Treatment Performed - Jet Perforation
2015-09-01 Perforation Treatment Performed - Fractured
2015-09-01 Perforation Treatment Performed - Jet Perforation
2015-09-02 Perforation Treatment Performed - Fractured
2015-09-02 Perforation Treatment Performed - Jet Perforation
2015-09-03 Perforation Treatment Performed - Fractured
2015-09-03 Perforation Treatment Performed - Jet Perforation
2015-09-04 Perforation Treatment Performed - Fractured
2015-09-04 Perforation Treatment Performed - Jet Perforation
2015-09-05 Perforation Treatment Performed - Fractured
2015-09-05 Perforation Treatment Performed - Jet Perforation
2015-09-06 Perforation Treatment Performed - Fractured
2015-09-06 Perforation Treatment Performed - Jet Perforation
2015-09-07 Perforation Treatment Performed - Fractured
2015-09-07 Perforation Treatment Performed - Jet Perforation
2015-09-08 Perforation Treatment Performed - Fractured
2015-09-08 Perforation Treatment Performed - Jet Perforation
2015-09-09 Perforation Treatment Performed - Fractured
2015-09-09 Perforation Treatment Performed - Jet Perforation
2015-09-10 Perforation Treatment Performed - Fractured
2015-09-10 Perforation Treatment Performed - Jet Perforation
2015-09-11 Perforation Treatment Performed - Jet Perforation
2015-09-12 Perforation Treatment Performed - Fractured
2015-09-12 Perforation Treatment Performed - Jet Perforation
2015-09-13 Perforation Treatment Performed - Fractured
2015-09-14 Perforation Treatment Performed - Fractured
2015-09-14 Perforation Treatment Performed - Jet Perforation
2015-09-15 Perforation Treatment Performed - Fractured
2015-09-15 Perforation Treatment Performed - Jet Perforation
2015-09-16 Perforation Treatment Performed - Fractured
2015-09-16 Perforation Treatment Performed - Jet Perforation
2015-09-17 Perforation Treatment Performed - Fractured
2015-09-17 Perforation Treatment Performed - Jet Perforation
2015-09-18 Perforation Treatment Performed - Fractured
2015-09-18 Perforation Treatment Performed - Jet Perforation
2015-09-19 Perforation Treatment Performed - Fractured
2015-09-19 Perforation Treatment Performed - Jet Perforation
2015-09-20 Perforation Treatment Performed - Fractured
2015-09-20 Perforation Treatment Performed - Jet Perforation
2015-09-21 Perforation Treatment Performed - Fractured
2015-09-22 Perforation Treatment Performed - Fractured
2015-09-22 Perforation Treatment Performed - Jet Perforation
2016-01-20 Well Fluid changed to Shale Gas Only
2016-01-20 Well Mode changed to Testing
2016-01-21 Well Began Production
2016-01-21 Well Fluid changed to Shale Gas Only
2016-01-21 Well Mode changed to Flowing
2017-02-15 Well Fluid changed to Shale Gas Only
2017-02-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-01-04 814.00 Deviate (5 - 79 degrees)
2015-01-29 4010.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-26 Open Hole/Barefoot Completion 6918.00 6922.00 0
2015-08-26 Perforation 6720.00 6721.50 20
2015-09-07 Perforation 5436.00 5437.50 20
2015-09-07 Perforation 5453.00 5454.50 20
2015-09-07 Perforation 5470.00 5471.50 20
2015-09-07 Perforation 5486.00 5487.50 20
2015-09-07 Fracture 5369.00 5420.50 0
2015-09-07 Fracture 5436.00 5487.50 0
2015-09-07 Fracture 5503.00 5554.50 0
2015-09-08 Perforation 5302.00 5303.50 20
2015-09-08 Perforation 5319.00 5320.50 20
2015-09-08 Perforation 5336.00 5337.50 20
2015-08-26 Perforation 6737.00 6738.50 20
2015-09-08 Perforation 5352.00 5353.50 20
2015-09-08 Fracture 5302.00 5353.50 0
2015-09-09 Perforation 5168.00 5169.50 20
2015-09-09 Perforation 5185.00 5186.50 20
2015-09-09 Perforation 5202.00 5203.50 20
2015-09-09 Perforation 5218.00 5219.50 20
2015-09-09 Perforation 5235.00 5236.50 20
2015-09-09 Perforation 5252.00 5253.50 20
2015-09-09 Perforation 5269.00 5270.50 20
2015-09-09 Perforation 5285.00 5286.50 20
2015-08-26 Perforation 6754.00 6755.50 20
2015-09-09 Fracture 5235.00 5286.50 0
2015-09-10 Perforation 5101.00 5102.50 20
2015-09-10 Perforation 5118.00 5119.50 20
2015-09-10 Perforation 5135.00 5136.50 20
2015-09-10 Perforation 5151.00 5152.50 20
2015-09-10 Fracture 5101.00 5152.50 0
2015-09-10 Fracture 5168.00 5219.50 0
2015-09-11 Perforation 5034.00 5035.50 20
2015-09-11 Perforation 5051.00 5052.50 20
2015-09-11 Perforation 5068.00 5069.50 20
2015-08-26 Perforation 6772.00 6773.50 20
2015-09-11 Perforation 5084.00 5085.50 20
2015-09-12 Perforation 4967.00 4968.50 20
2015-09-12 Perforation 4984.00 4985.50 20
2015-09-12 Perforation 5001.00 5002.50 20
2015-09-12 Perforation 5017.00 5018.50 20
2015-09-12 Fracture 5034.00 5085.50 0
2015-09-13 Fracture 4967.00 5018.50 0
2015-09-14 Perforation 4766.00 4767.50 20
2015-09-14 Perforation 4783.00 4784.50 20
2015-09-14 Perforation 4800.00 4801.50 20
2015-08-26 Perforation 6789.00 6790.50 20
2015-09-14 Perforation 4816.00 4817.50 20
2015-09-14 Perforation 4833.00 4834.50 20
2015-09-14 Perforation 4850.00 4851.50 20
2015-09-14 Perforation 4867.00 4868.50 20
2015-09-14 Perforation 4883.00 4884.50 20
2015-09-14 Perforation 4900.00 4901.50 20
2015-09-14 Perforation 4917.00 4918.50 20
2015-09-14 Perforation 4934.00 4935.50 20
2015-09-14 Perforation 4950.00 4951.50 20
2015-09-14 Fracture 4833.00 4884.50 0
2015-08-26 Fracture 6737.00 6790.50 0
2015-09-14 Fracture 4900.00 4951.50 0
2015-09-15 Perforation 4699.00 4700.50 20
2015-09-15 Perforation 4716.00 4717.50 20
2015-09-15 Perforation 4733.00 4734.50 20
2015-09-15 Perforation 4749.00 4750.50 20
2015-09-15 Fracture 4699.00 4750.50 0
2015-09-15 Fracture 4766.00 4817.50 0
2015-09-16 Perforation 4565.00 4566.50 20
2015-09-16 Perforation 4582.00 4583.50 20
2015-09-16 Perforation 4599.00 4600.50 20
2015-08-27 Perforation 6528.00 6529.50 20
2015-09-16 Perforation 4615.00 4616.50 20
2015-09-16 Perforation 4632.00 4633.50 20
2015-09-16 Perforation 4649.00 4650.50 20
2015-09-16 Perforation 4666.00 4667.50 20
2015-09-16 Perforation 4682.00 4683.50 20
2015-09-16 Fracture 4565.00 4616.50 0
2015-09-16 Fracture 4632.00 4683.50 0
2015-09-17 Perforation 4431.00 4432.50 20
2015-09-17 Perforation 4448.00 4449.50 20
2015-09-17 Perforation 4465.00 4466.50 20
2015-08-27 Perforation 6545.00 6546.50 20
2015-09-17 Perforation 4481.00 4482.50 20
2015-09-17 Perforation 4498.00 4499.50 20
2015-09-17 Perforation 4515.00 4516.50 20
2015-09-17 Perforation 4532.00 4533.50 20
2015-09-17 Perforation 4548.00 4549.50 20
2015-09-17 Fracture 4498.00 4549.50 0
2015-09-18 Perforation 4364.00 4365.50 20
2015-09-18 Perforation 4381.00 4382.50 20
2015-09-18 Perforation 4398.00 4399.50 20
2015-09-18 Perforation 4414.00 4415.50 20
2015-08-27 Perforation 6563.00 6564.50 20
2015-09-18 Fracture 4364.00 4415.50 0
2015-09-18 Fracture 4431.00 4482.50 0
2015-09-19 Perforation 4230.00 4231.50 20
2015-09-19 Perforation 4247.00 4248.50 20
2015-09-19 Perforation 4264.00 4265.50 20
2015-09-19 Perforation 4280.00 4281.50 20
2015-09-19 Perforation 4297.00 4298.50 20
2015-09-19 Perforation 4314.00 4315.50 20
2015-09-19 Perforation 4331.00 4332.50 20
2015-09-19 Perforation 4347.00 4348.50 20
2015-08-27 Perforation 6580.00 6581.50 20
2015-09-19 Fracture 4297.00 4348.50 0
2015-09-20 Perforation 4163.00 4164.50 20
2015-09-20 Perforation 4180.00 4181.50 20
2015-09-20 Perforation 4197.00 4198.50 20
2015-09-20 Perforation 4213.00 4214.50 20
2015-09-20 Fracture 4230.00 4281.50 0
2015-09-21 Fracture 4163.00 4214.50 0
2015-09-22 Perforation 4029.00 4030.50 20
2015-09-22 Perforation 4046.00 4047.50 20
2015-09-22 Perforation 4063.00 4064.50 20
2015-08-19 Perforation 6807.00 6808.50 20
2015-08-27 Perforation 6598.00 6599.50 20
2015-09-22 Perforation 4079.00 4080.50 20
2015-09-22 Perforation 4096.00 4097.50 20
2015-09-22 Perforation 4113.00 4114.50 20
2015-09-22 Perforation 4130.00 4131.50 20
2015-09-22 Perforation 4146.00 4147.50 20
2015-09-22 Fracture 4029.00 4080.50 0
2015-09-22 Fracture 4096.00 4147.50 0
2015-08-27 Perforation 6615.00 6616.50 20
2015-08-27 Perforation 6632.00 6633.50 20
2015-08-27 Perforation 6650.00 6651.50 20
2015-08-27 Fracture 6598.00 6651.50 0
2015-08-27 Fracture 6667.00 6721.50 0
2015-08-28 Perforation 6389.00 6390.50 20
2015-08-28 Perforation 6406.00 6407.50 20
2015-08-28 Perforation 6423.00 6424.50 20
2015-08-28 Perforation 6441.00 6442.50 20
2015-08-19 Perforation 6824.00 6825.50 20
2015-08-28 Perforation 6458.00 6459.50 20
2015-08-28 Perforation 6476.00 6477.50 20
2015-08-28 Perforation 6493.00 6494.50 20
2015-08-28 Perforation 6511.00 6512.50 20
2015-08-28 Fracture 6458.00 6512.50 0
2015-08-28 Fracture 6528.00 6581.50 0
2015-08-29 Perforation 6319.00 6320.50 20
2015-08-29 Perforation 6336.00 6337.50 20
2015-08-29 Perforation 6354.00 6355.50 20
2015-08-29 Perforation 6371.00 6372.50 20
2015-08-19 Perforation 6842.00 6843.50 20
2015-08-29 Fracture 6389.00 6442.50 0
2015-08-30 Perforation 6249.00 6250.50 20
2015-08-30 Perforation 6267.00 6268.50 20
2015-08-30 Perforation 6284.00 6285.50 20
2015-08-30 Perforation 6301.00 6302.50 20
2015-08-30 Fracture 6319.00 6372.50 0
2015-08-31 Perforation 6110.00 6111.50 20
2015-08-31 Perforation 6127.00 6128.50 20
2015-08-31 Perforation 6145.00 6146.50 20
2015-08-31 Perforation 6162.00 6163.50 20
2015-08-19 Perforation 6859.00 6860.50 20
2015-08-31 Perforation 6179.00 6180.50 20
2015-08-31 Perforation 6197.00 6198.50 20
2015-08-31 Perforation 6214.00 6215.50 20
2015-08-31 Perforation 6232.00 6233.50 20
2015-08-31 Fracture 6179.00 6233.50 0
2015-08-31 Fracture 6249.00 6302.50 0
2015-09-01 Perforation 6040.00 6041.50 20
2015-09-01 Perforation 6057.00 6058.50 20
2015-09-01 Perforation 6075.00 6076.50 20
2015-09-01 Perforation 6092.00 6093.50 20
2015-08-25 Fracture 6807.00 6860.50 0
2015-09-01 Fracture 6040.00 6093.50 0
2015-09-01 Fracture 6110.00 6163.50 0
2015-09-02 Perforation 5901.00 5902.50 20
2015-09-02 Perforation 5918.00 5919.50 20
2015-09-02 Perforation 5935.00 5936.50 20
2015-09-02 Perforation 5953.00 5954.50 20
2015-09-02 Perforation 5970.00 5971.50 20
2015-09-02 Perforation 5988.00 5989.50 20
2015-09-02 Perforation 6005.00 6006.50 20
2015-09-02 Perforation 6023.00 6024.50 20
2015-08-26 Perforation 6667.00 6668.50 20
2015-09-02 Fracture 5970.00 6024.50 0
2015-09-03 Perforation 5831.00 5832.50 20
2015-09-03 Perforation 5848.00 5849.50 20
2015-09-03 Perforation 5866.00 5867.50 20
2015-09-03 Perforation 5883.00 5884.50 20
2015-09-03 Fracture 5901.00 5954.50 0
2015-09-04 Perforation 5761.00 5762.50 20
2015-09-04 Perforation 5779.00 5780.50 20
2015-09-04 Perforation 5796.00 5797.50 20
2015-09-04 Perforation 5814.00 5815.50 20
2015-08-26 Perforation 6685.00 6686.50 20
2015-09-04 Fracture 5831.00 5884.50 0
2015-09-05 Perforation 5637.50 5639.00 20
2015-09-05 Perforation 5654.50 5656.00 20
2015-09-05 Perforation 5671.50 5673.00 20
2015-09-05 Perforation 5689.50 5691.00 20
2015-09-05 Fracture 5637.50 5691.00 0
2015-09-05 Fracture 5761.00 5815.50 0
2015-09-06 Perforation 5503.00 5504.50 20
2015-09-06 Perforation 5520.00 5521.50 20
2015-09-06 Perforation 5537.00 5538.50 20
2015-08-26 Perforation 6702.00 6703.50 20
2015-09-06 Perforation 5553.00 5554.50 20
2015-09-06 Perforation 5570.00 5571.50 20
2015-09-06 Perforation 5587.00 5588.50 20
2015-09-06 Perforation 5604.00 5605.50 20
2015-09-06 Perforation 5620.00 5621.50 20
2015-09-06 Fracture 5570.00 5621.50 0
2015-09-07 Perforation 5369.00 5370.50 20
2015-09-07 Perforation 5386.00 5387.50 20
2015-09-07 Perforation 5403.00 5404.50 20
2015-09-07 Perforation 5419.00 5420.50 20

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-25 2015-09-22 3,928 52,015 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.1075 N/A
Sand (40/70) Source Energy;SuperiorSilica;Canadian Silica Aluminum Oxide 1344-28-1 100 12.6402 N/A
Crystalline silica. quartz 14808-60-7 100 12.6402 N/A
Iron Oxide 1309-37-1 100 12.6402 N/A
Titanium Oxide 13463-67-7 100 12.6402 N/A
Sand (50/140) Source Energy;SuperiorSilica;Canadian Silica Aluminum Oxide 1344-28-1 100 1.3446 N/A
Crystalline silica. quartz 14808-60-7 100 1.3446 N/A
Iron Oxide 1309-37-1 100 1.3446 N/A
Titanium Oxide 13463-67-7 100 1.3446 N/A
HCL 15% Canyon Technical Services Acid Hydrogen Chloride 7647-01-0 100 0.3613 N/A
Water 7732-18-5 100 0.3613 N/A
CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.004 N/A
Crystalline silica. quartz 14808-60-7 100 0.004 N/A
CAN-2102 pH Buffer (HpH) Canyon Technical Services Buffer Methyl Alcohol 67-56-1 100 0.1262 N/A
Sodium Hydroxide 1310-73-2 100 0.1262 N/A
Water 7732-18-5 100 0.1262 N/A
CAN-1000 Corrosion Inhibitor Canyon Technical Services Corrosion Inhibitor Refer to MSDS 8141 100 0.0035 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.0872 N/A
Monoethanolamine 141-43-5 100 0.0872 N/A
Water 7732-18-5 100 0.0872 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8253 100 0.0017 N/A
FE 73W EFOS Polymer LLC Friction Reducer Alcohols. C12-16. ethoxylated propoxylated 68213-24-1 100 0.0922 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0922 N/A
Ethylene glycol 107-21-1 100 0.0922 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0922 N/A
Polyoxyethylene alkyl ether phosphate 68585-36-4 100 0.0922 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.2169 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0028 N/A
Cupric Chloride 7447-39-4 100 0.0028 N/A
Monoethanolamine 141-43-5 100 0.0028 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.01 N/A
Potassium Chloride 7447-40-7 100 0.01 N/A
Water 7732-18-5 100 0.01 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0013 N/A
Water 7732-18-5 100 0.0013 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-28 2015-09-27 Groundwater - Non-saline less than or equal to 150m deep 7353
2015-07-29 2015-08-31 Groundwater - Non-saline less than or equal to 150m deep 1074
2015-07-29 2015-08-31 Groundwater - Non-saline greater than 150m deep 747
2015-08-10 2015-09-23 Surface Water - Runoff 41288
2015-05-22 2015-09-23 Groundwater - Non-saline less than or equal to 150m deep 564
2015-05-01 2015-09-23 Groundwater - Non-saline less than or equal to 150m deep 548
2015-04-03 2015-04-30 Groundwater - Non-saline less than or equal to 150m deep 396
2015-04-03 2015-04-30 Groundwater - Non-saline less than or equal to 150m deep 298
2015-06-07 2015-07-28 Central Water Distribution Facility 29165

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 7694 0.0 0.0 0.0
2017 8704 0.0 0.0 0.0
2018 8647 0.0 0.0 0.0
2019 8611 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-03 No Incident Encountered 0.00 0.00
2015-10-08 No Incident Encountered 0.00 0.00
2015-08-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References