X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0625263610000

Well Details

Well ID: 0625263610000
Loading map...
Location: 00/10-36-062-26W5/0
Location Alias: 00/10-36-62-26 W5M
Location Alias 2: 00/10-36-062-26 W5/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 5
Range: 26
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 10-36-62-26
Operator Name: Gain Energy Ltd.
License Number: 0021594
License Date: 1961-10-27
License Status: Suspension
Spud Date: 1961-11-03
Final Drill Date: 1962-01-05
Well Total Depth: 3561.70 m
Surface Hole Latitude: 54.408870
Surface Hole Longitude: -117.760792

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-27 Obtained License
1962-01-05 Finished Drilling
1962-01-05 Well Mode changed to Drilled and Cased
1962-01-07 Production Casing Operation Performed
1962-01-08 Perforation Treatment Performed - Open-Hole Completion
1962-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-13 Well Began Production
1962-01-13 Well Fluid changed to Crude Oil
1962-01-13 Well Mode changed to Flowing
1976-07-28 Perforation Treatment Performed - Jet Perforation
1976-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-23 Perforation Treatment Performed - Jet Perforation
1985-04-23 Well Log Performed
1985-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Gas Lift
1990-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-08 Plug Back Performed
1990-12-08 Well Fluid changed to Crude Oil
1990-12-08 Well Mode changed to Abandoned Zone
1994-05-15 Perforation Treatment Performed - Open-Hole Completion
1994-05-16 Well Log Performed
1994-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-26 Liner Casing Operation Performed
1994-05-26 Perforation Treatment Performed - Cement Squeeze
1994-05-30 Well Log Performed
1994-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-08 Perforation Treatment Performed - Jet Perforation
1994-06-08 Well Log Performed
1994-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-09 Perforation Treatment Performed - Jet Perforation
1994-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-10 Well Fluid changed to Crude Oil
1994-07-10 Well Mode changed to Gas Lift
1996-08-26 Well Log Performed
1996-08-28 Well Log Performed
1998-03-31 Well Log Performed
1998-05-05 Well Log Performed
2013-07-01 Well Fluid changed to Crude Oil
2013-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-08 Open Hole/Barefoot Completion 3518.60 3531.10 0
1994-05-18 Acid Treatment 3512.80 3561.70 0
1994-05-26 Cement Squeeze 3512.80 3561.70 0
1994-06-08 Perforation 3547.00 3557.00 13
1994-06-08 Acid Treatment 3547.00 3557.00 0
1994-06-09 Acid Treatment 3547.00 3557.00 0
1994-06-09 Perforation 3534.60 3544.00 13
1994-06-10 Acid Treatment 3534.60 3544.00 0
1962-01-12 Acid Treatment 3518.60 3531.10 0
1976-07-28 Perforation 3512.80 3520.10 7
1976-08-31 Acid Treatment 3512.80 3531.10 0
1985-04-23 Perforation 3516.30 3520.20 13
1985-04-23 Perforation 3512.80 3516.30 13
1985-04-25 Acid Treatment 3512.80 3531.10 0
1990-12-08 Packing Device Capped w/Cement 3452.00 3460.00 0
1994-05-15 Open Hole/Barefoot Completion 3531.10 3561.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 423 0.0 0.0 0.0
1968 1971 0.0 0.0 0.0
1969 7663 0.0 0.0 0.0
1970 6611 0.0 0.0 0.0
1971 7355 0.0 0.0 0.0
1972 6139 0.0 0.0 0.0
1973 6486 0.0 0.0 0.0
1974 7925 0.0 0.0 0.0
1975 7734 0.0 0.0 0.0
1976 3175 0.0 0.0 0.0
1977 7866 0.0 0.0 0.0
1978 8238 0.0 0.0 0.0
1979 7247 0.0 0.0 0.0
1980 3975 0.0 0.0 0.0
1981 2176 0.0 0.0 0.0
1982 927 0.0 0.0 0.0
1983 3421 0.0 0.0 0.0
1984 2824 0.0 0.0 0.0
1985 1164 0.0 0.0 0.0
1986 4698 0.0 0.0 0.0
1987 3262 0.0 0.0 0.0
1988 3254 0.0 0.0 0.0
1989 3162 0.0 0.0 0.0
1990 2159 0.0 0.0 0.0
1994 2658 0.0 0.0 0.0
1995 7102 0.0 0.0 0.0
1996 7002 0.0 0.0 0.0
1997 5656 0.0 0.0 0.0
1998 4972 0.0 0.0 0.0
1999 8109 0.0 0.0 0.0
2000 8659 0.0 0.0 0.0
2001 2070 0.0 0.0 0.0

For data sources see[5]

References