If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0634081215AB0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.444268,"lon":-111.072,"icon":""}]} |
Location: AB/15-12-063-08W4/0 | |
Location Alias: AB/15-12-63-08 W4M | |
Location Alias 2: AB/15-12-063-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 4 | |
Range: 08 | |
Section: 12 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: CDNOXY B10 WOLFLK EX 15-12-63-8 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0112941 | |
License Date: 1985-01-30 | |
License Status: RecExempt | |
Spud Date: 1985-04-20 | |
Final Drill Date: 1985-04-23 | |
Well Total Depth: 616.70 m | |
Surface Hole Latitude: 54.444268 | |
Surface Hole Longitude: -111.072000 |
Date | Event |
---|---|
1985-01-30 | Obtained License |
1985-04-20 | Direction Drilling Operation Performed - Deviate |
1985-04-21 | Surface Casing Operation Performed |
1985-04-23 | Finished Drilling |
1985-04-23 | Well Log Performed |
1985-04-23 | Well Mode changed to Drilled and Cased |
1985-04-24 | Perforation Treatment Performed - Slotted Liner or Casing |
1985-04-24 | Production Casing Operation Performed |
1985-04-24 | Rig Released |
1985-07-16 | Well Log Performed |
1986-07-03 | Well Began Production |
1986-07-03 | Well Fluid changed to Crude Bitumen |
1986-07-03 | Well Type changed to Cyclical |
1987-03-23 | Well Log Performed |
1988-08-21 | Well Fluid changed to Crude Bitumen |
1988-08-21 | Well Mode changed to Suspended |
1988-08-21 | Well Type changed to Cyclical |
1991-06-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-13 | Plug Back Performed |
1991-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-08-14 | Perforation Treatment Performed - Jet Perforation |
1991-08-14 | Well Log Performed |
1991-08-15 | Perforation Treatment Performed - Remedial Casing |
1991-08-22 | Perforation Treatment Performed - Jet Perforation |
1991-08-22 | Perforation Treatment Performed - Remedial Casing |
1991-08-22 | Well Log Performed |
1993-07-30 | Well Abandoned |
1993-07-30 | Well Fluid changed to Crude Bitumen |
1993-07-30 | Well Mode changed to Abandoned |
1993-07-30 | Well Type changed to Cyclical |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1985-04-20 | 48.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-04-24 | Slotted Liner | 582.00 | 616.70 | 0 |
1991-06-13 | Packing Device Capped w/Cement | 523.60 | 572.00 | 0 |
1991-08-14 | Perforation | 477.00 | 479.00 | 13 |
1991-08-14 | Acid Treatment | 477.00 | 479.00 | 0 |
1991-08-15 | Remedial Casing Cementing | 477.00 | 479.00 | 0 |
1991-08-22 | Perforation | 190.00 | 192.00 | 13 |
1991-08-22 | Remedial Casing Cementing | 190.00 | 192.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1710 | 0.0 | 0.0 | 0.0 |
1987 | 3632 | 0.0 | 0.0 | 0.0 |
1988 | 2344 | 0.0 | 0.0 | 0.0 |
For data sources see[6]