X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0634081308AA0

Well Details

Well ID: 0634081308AA0
Loading map...
Location: AA/08-13-063-08W4/0
Location Alias: AA/08-13-63-08 W4M
Location Alias 2: AA/08-13-063-08 W4/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 4
Range: 08
Section: 13
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CDNOXY C2 WOLFLK EX 8-13-63-8
Operator Name: CNOOC Petroleum North America ULC
License Number: 0112968
License Date: 1985-01-31
License Status: RecExempt
Spud Date: 1985-03-24
Final Drill Date: 1985-03-26
Well Total Depth: 482.00 m
Surface Hole Latitude: 54.445255
Surface Hole Longitude: -111.069780

For data sources see[1][2]

Well History

Date Event
1985-01-31 Obtained License
1985-03-24 Direction Drilling Operation Performed - Deviate
1985-03-25 Surface Casing Operation Performed
1985-03-26 Finished Drilling
1985-03-26 Well Log Performed
1985-03-26 Well Mode changed to Drilled and Cased
1985-03-27 Perforation Treatment Performed - Slotted Liner or Casing
1985-03-27 Production Casing Operation Performed
1985-03-27 Rig Released
1985-06-21 Well Log Performed
1986-04-17 Well Began Production
1986-04-17 Well Fluid changed to Crude Bitumen
1986-04-17 Well Type changed to Cyclical
1986-07-09 Well Fluid changed to Crude Bitumen
1986-07-09 Well Mode changed to Suspended
1986-07-09 Well Type changed to Cyclical
1987-05-04 Well Fluid changed to Crude Bitumen
1987-05-04 Well Type changed to Cyclical
1988-08-21 Well Fluid changed to Crude Bitumen
1988-08-21 Well Mode changed to Suspended
1988-08-21 Well Type changed to Cyclical
1991-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-04-22 Plug Back Performed
1991-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-07 Perforation Treatment Performed - Jet Perforation
1991-06-07 Well Log Performed
1991-06-13 Perforation Treatment Performed - Remedial Casing
1991-06-13 Well Fluid changed to Crude Bitumen
1991-06-13 Well Mode changed to Abandoned Zone
1991-06-13 Well Type changed to Cyclical
1993-06-09 Well Fluid changed to Crude Bitumen
1993-06-09 Well Mode changed to Abandoned
1993-06-09 Well Type changed to Cyclical
1993-08-08 Well Log Performed
1993-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-22 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-24 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-27 Slotted Liner 454.90 482.00 0
1991-04-22 Packing Device Capped w/Cement 400.00 447.00 0
1991-06-07 Perforation 164.00 164.90 12
1991-06-07 Acid Treatment 164.00 164.90 0
1991-06-13 Remedial Casing Cementing 164.00 164.90 0
1993-08-09 Packing Device Capped w/Cement 82.00 90.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 970 0.0 0.0 0.0
1987 1086 0.0 0.0 0.0

For data sources see[6]

References