X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635230906002

Well Details

Well ID: 0635230906002
Loading map...
Location: 00/06-09-063-23W5/2
Location Alias: 00/06-09-63-23 W5M
Location Alias 2: 00/06-09-063-23 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA HZ WAHIGAN 6-9-63-23
Operator Name: Ovintiv Canada ULC
License Number: 0440872
License Date: 2011-12-12
License Status: Amended
Spud Date: 2011-12-24
Final Drill Date: 2012-02-16
Well Total Depth: 5575.00 m
Surface Hole Latitude: 54.449118
Surface Hole Longitude: -117.440938

For data sources see[1][2]

Well History

Date Event
2011-12-12 Obtained License
2011-12-26 Surface Casing Operation Performed
2012-01-10 Intermediate Casing Operation Performed
2012-01-24 Direction Drilling Operation Performed - Horizontal
2012-02-02 Well Log Performed
2012-02-12 Well Log Performed
2012-02-16 Finished Drilling
2012-02-16 Well Log Performed
2012-02-16 Well Mode changed to Drilled and Cased
2012-02-19 Well Log Performed
2012-02-23 Liner Casing Operation Performed
2012-03-01 Rig Released
2012-07-28 Perforation Treatment Performed - Jet Perforation
2012-08-13 Perforation Treatment Performed - Fractured
2012-08-17 Perforation Treatment Performed - Jet Perforation
2012-08-18 Perforation Treatment Performed - Fractured
2012-08-19 Perforation Treatment Performed - Fractured
2012-08-19 Perforation Treatment Performed - Jet Perforation
2012-08-20 Perforation Treatment Performed - Fractured
2012-08-20 Perforation Treatment Performed - Jet Perforation
2012-08-21 Perforation Treatment Performed - Fractured
2012-08-21 Perforation Treatment Performed - Jet Perforation
2012-08-22 Perforation Treatment Performed - Fractured
2012-08-22 Perforation Treatment Performed - Jet Perforation
2012-08-23 Perforation Treatment Performed - Fractured
2012-08-23 Perforation Treatment Performed - Jet Perforation
2012-08-24 Perforation Treatment Performed - Fractured
2012-08-24 Perforation Treatment Performed - Jet Perforation
2012-08-25 Perforation Treatment Performed - Fractured
2012-08-25 Perforation Treatment Performed - Jet Perforation
2012-08-26 Perforation Treatment Performed - Fractured
2012-08-26 Perforation Treatment Performed - Jet Perforation
2012-08-27 Perforation Treatment Performed - Fractured
2012-08-27 Perforation Treatment Performed - Jet Perforation
2013-02-16 Well Log Performed
2013-02-17 Well Fluid changed to Shale Gas Only
2013-02-17 Well Mode changed to Testing
2013-02-25 Well Began Production
2013-02-25 Well Fluid changed to Shale Gas Only
2013-02-25 Well Mode changed to Flowing
2014-05-28 Well Fluid changed to Shale Gas Only
2014-05-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-24 3170.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-28 Perforation 5549.00 5550.50 20
2012-08-19 Perforation 5325.00 5326.50 20
2012-08-19 Perforation 5293.00 5294.50 20
2012-08-19 Fracture 5293.00 5358.50 0
2012-08-19 Perforation 5261.00 5262.50 20
2012-08-19 Perforation 5229.00 5230.50 20
2012-08-19 Perforation 5197.00 5198.50 20
2012-08-20 Fracture 5197.00 5262.50 0
2012-08-20 Perforation 5165.00 5166.50 20
2012-08-20 Perforation 5133.00 5134.50 20
2012-08-20 Perforation 5101.00 5102.50 20
2012-07-28 Perforation 5517.00 5518.50 20
2012-08-20 Fracture 5101.00 5166.50 0
2012-08-20 Perforation 5069.00 5071.50 20
2012-08-20 Perforation 5037.00 5038.50 20
2012-08-20 Perforation 5005.00 5006.50 20
2012-08-21 Fracture 5005.00 5071.50 0
2012-08-21 Perforation 4973.00 4974.50 20
2012-08-21 Perforation 4941.00 4942.50 20
2012-08-21 Perforation 4909.00 4910.50 20
2012-08-21 Fracture 4909.00 4974.50 0
2012-08-22 Perforation 4877.00 4878.50 20
2012-07-28 Perforation 5485.00 5486.50 20
2012-08-22 Perforation 4845.00 4846.50 20
2012-08-22 Perforation 4813.00 4814.50 20
2012-08-22 Fracture 4813.00 4878.50 0
2012-08-22 Perforation 4781.00 4782.50 20
2012-08-22 Perforation 4749.00 4750.50 20
2012-08-22 Perforation 4717.00 4718.50 20
2012-08-22 Fracture 4717.00 4782.50 0
2012-08-23 Perforation 4685.00 4686.50 20
2012-08-23 Perforation 4653.00 4654.50 20
2012-08-23 Perforation 4621.00 4622.50 20
2012-08-13 Fracture 5485.00 5550.50 0
2012-08-23 Fracture 4621.00 4686.50 0
2012-08-23 Perforation 4589.00 4590.50 20
2012-08-23 Perforation 4557.00 4558.50 20
2012-08-23 Perforation 4525.00 4526.50 20
2012-08-23 Fracture 4525.00 4590.50 0
2012-08-24 Perforation 4493.00 4494.50 20
2012-08-24 Perforation 4461.00 4462.50 20
2012-08-24 Perforation 4429.00 4430.50 20
2012-08-24 Fracture 4429.00 4494.50 0
2012-08-24 Perforation 4397.00 4398.50 20
2012-08-17 Perforation 5453.00 5454.00 20
2012-08-24 Perforation 4365.00 4366.50 20
2012-08-24 Perforation 4333.00 4334.50 20
2012-08-24 Fracture 4333.00 4398.50 0
2012-08-24 Perforation 4301.00 4302.50 20
2012-08-24 Perforation 4269.00 4270.50 20
2012-08-24 Perforation 4237.00 4238.50 20
2012-08-25 Fracture 4237.00 4302.50 0
2012-08-25 Perforation 4205.00 4206.50 20
2012-08-25 Perforation 4173.00 4174.50 20
2012-08-25 Perforation 4141.00 4142.50 20
2012-08-17 Perforation 5421.00 5422.50 20
2012-08-25 Fracture 4141.00 4206.50 0
2012-08-25 Perforation 4102.00 4103.50 20
2012-08-25 Perforation 4063.00 4064.50 20
2012-08-25 Perforation 4024.00 4025.50 20
2012-08-25 Fracture 4024.00 4103.50 0
2012-08-26 Perforation 3985.00 3986.50 20
2012-08-26 Perforation 3945.00 3946.50 20
2012-08-26 Perforation 3905.00 3906.50 20
2012-08-26 Fracture 3905.00 3986.50 0
2012-08-26 Perforation 3865.00 3866.50 20
2012-08-17 Perforation 5389.00 5390.50 20
2012-08-26 Perforation 3839.00 3840.50 20
2012-08-26 Perforation 3813.00 3814.50 20
2012-08-26 Fracture 3813.00 3866.50 0
2012-08-26 Perforation 3786.00 3787.50 20
2012-08-26 Perforation 3759.00 3760.50 20
2012-08-26 Perforation 3733.00 3734.50 20
2012-08-27 Fracture 3733.00 3787.50 0
2012-08-27 Perforation 3707.00 3708.50 20
2012-08-27 Perforation 3680.00 3681.50 20
2012-08-27 Perforation 3654.00 3655.50 20
2012-08-18 Fracture 5389.00 5454.00 0
2012-08-27 Fracture 3654.00 3708.50 0
2012-08-27 Perforation 3627.00 3628.50 20
2012-08-27 Perforation 3600.00 3601.50 20
2012-08-27 Perforation 3572.00 3573.50 20
2012-08-27 Fracture 3572.00 3628.50 0
2012-08-19 Perforation 5357.00 5358.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3492 0.0 0.0 0.0
2014 2545 0.0 0.0 0.0
2015 5538 0.0 0.0 0.0
2016 7513 0.0 0.0 0.0
2017 6685 0.0 0.0 0.0
2018 7457 0.0 0.0 0.0
2019 8610 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References