X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635231510000

Well Details

Well ID: 0635231510000
Loading map...
Location: 00/10-15-063-23W5/0
Location Alias: 00/10-15-63-23 W5M
Location Alias 2: 00/10-15-063-23 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 23
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA HZ WAHIGAN 10-15-63-23
Operator Name: Ovintiv Canada ULC
License Number: 0492181
License Date: 2018-11-23
License Status: Amended
Spud Date: 2019-03-26
Final Drill Date: 2019-04-13
Well Total Depth: 6820.00 m
Surface Hole Latitude: 54.424199
Surface Hole Longitude: -117.353777

For data sources see[1][2]

Well History

Date Event
2018-11-23 Obtained License
2019-03-26 Surface Casing Operation Performed
2019-03-28 Direction Drilling Operation Performed - Deviate
2019-04-03 Intermediate Casing Operation Performed
2019-04-05 Direction Drilling Operation Performed - Horizontal
2019-04-08 Well Log Performed
2019-04-13 Finished Drilling
2019-04-13 Well Log Performed
2019-04-13 Well Mode changed to Drilled and Cased
2019-04-16 Production Casing Operation Performed
2019-04-16 Rig Released
2019-05-16 Perforation Treatment Performed - Jet Perforation
2019-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-24 Perforation Treatment Performed - Jet Perforation
2019-05-26 Perforation Treatment Performed - Fractured
2019-05-26 Perforation Treatment Performed - Jet Perforation
2019-05-27 Perforation Treatment Performed - Fractured
2019-05-27 Perforation Treatment Performed - Jet Perforation
2019-05-28 Perforation Treatment Performed - Fractured
2019-05-28 Perforation Treatment Performed - Jet Perforation
2019-05-29 Perforation Treatment Performed - Fractured
2019-05-29 Perforation Treatment Performed - Jet Perforation
2019-05-30 Perforation Treatment Performed - Fractured
2019-05-30 Perforation Treatment Performed - Jet Perforation
2019-05-31 Perforation Treatment Performed - Fractured
2019-05-31 Perforation Treatment Performed - Jet Perforation
2019-06-01 Perforation Treatment Performed - Fractured
2019-06-01 Perforation Treatment Performed - Jet Perforation
2019-06-02 Perforation Treatment Performed - Fractured
2019-06-02 Perforation Treatment Performed - Jet Perforation
2019-06-03 Perforation Treatment Performed - Fractured
2019-06-03 Perforation Treatment Performed - Jet Perforation
2019-06-06 Perforation Treatment Performed - Fractured
2019-06-06 Perforation Treatment Performed - Jet Perforation
2019-06-07 Perforation Treatment Performed - Fractured
2019-06-07 Perforation Treatment Performed - Jet Perforation
2019-06-08 Perforation Treatment Performed - Fractured
2019-06-08 Perforation Treatment Performed - Jet Perforation
2019-06-10 Perforation Treatment Performed - Fractured
2019-06-10 Perforation Treatment Performed - Jet Perforation
2019-06-11 Perforation Treatment Performed - Fractured
2019-06-11 Perforation Treatment Performed - Jet Perforation
2019-06-12 Perforation Treatment Performed - Fractured
2019-06-12 Perforation Treatment Performed - Jet Perforation
2019-06-13 Perforation Treatment Performed - Fractured
2019-06-13 Perforation Treatment Performed - Jet Perforation
2019-06-14 Perforation Treatment Performed - Fractured
2019-06-14 Perforation Treatment Performed - Jet Perforation
2019-06-15 Perforation Treatment Performed - Fractured
2019-06-15 Perforation Treatment Performed - Jet Perforation
2019-06-16 Perforation Treatment Performed - Fractured
2019-06-16 Perforation Treatment Performed - Jet Perforation
2019-06-17 Perforation Treatment Performed - Fractured
2019-06-17 Perforation Treatment Performed - Jet Perforation
2019-07-07 Well Began Production
2019-07-07 Well Fluid changed to Gas
2019-07-07 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-26 Horizon Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-28 1387.50 Deviate (5 - 79 degrees)
2019-04-05 3663.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-16 Perforation 6700.00 6700.30 18
2019-05-24 Perforation 6660.00 6660.30 16
2019-06-01 Perforation 5800.00 5800.30 18
2019-06-01 Perforation 5810.00 5810.30 18
2019-06-01 Perforation 5820.00 5820.30 18
2019-06-01 Perforation 5830.00 5830.30 18
2019-06-01 Perforation 5840.00 5840.30 18
2019-06-01 Perforation 5850.00 5850.30 18
2019-06-01 Perforation 5860.00 5860.30 18
2019-06-01 Perforation 5870.00 5870.30 18
2019-06-01 Perforation 5880.00 5880.30 18
2019-06-01 Perforation 5890.00 5890.30 18
2019-05-24 Perforation 6670.00 6670.30 16
2019-06-01 Perforation 5900.00 5900.30 18
2019-06-01 Perforation 5910.00 5910.30 18
2019-06-01 Perforation 5920.00 5920.30 18
2019-06-01 Perforation 5930.00 5930.30 18
2019-06-01 Perforation 5940.00 5940.30 18
2019-06-01 Fracture 5740.00 5800.30 0
2019-06-01 Fracture 5810.00 5870.30 0
2019-06-01 Fracture 5880.00 5940.30 0
2019-06-01 Fracture 5950.00 6010.30 0
2019-06-02 Perforation 5500.00 5500.30 18
2019-05-24 Perforation 6680.00 6680.30 16
2019-06-02 Perforation 5510.00 5510.30 18
2019-06-02 Perforation 5520.00 5520.30 18
2019-06-02 Perforation 5530.00 5530.30 18
2019-06-02 Perforation 5540.00 5540.30 18
2019-06-02 Perforation 5550.00 5550.30 18
2019-06-02 Perforation 5560.00 5560.30 18
2019-06-02 Perforation 5570.00 5570.30 18
2019-06-02 Perforation 5580.00 5580.30 18
2019-06-02 Perforation 5590.00 5590.30 18
2019-06-02 Perforation 5600.00 5600.30 18
2019-05-24 Perforation 6690.00 6690.30 16
2019-06-02 Perforation 5610.00 5610.30 18
2019-06-02 Perforation 5620.00 5620.30 18
2019-06-02 Perforation 5630.00 5630.30 18
2019-06-02 Perforation 5640.00 5640.30 18
2019-06-02 Perforation 5650.00 5650.30 18
2019-06-02 Perforation 5660.00 5660.30 18
2019-06-02 Perforation 5670.00 5670.30 18
2019-06-02 Perforation 5680.00 5680.30 16
2019-06-02 Perforation 5690.00 5690.30 18
2019-06-02 Perforation 5700.00 5700.30 18
2019-05-26 Perforation 6520.00 6520.30 18
2019-06-02 Perforation 5710.00 5710.30 18
2019-06-02 Perforation 5720.00 5720.30 18
2019-06-02 Perforation 5730.00 5730.30 18
2019-06-02 Fracture 5580.00 5650.30 0
2019-06-02 Fracture 5660.00 5730.30 0
2019-06-03 Perforation 5340.00 5340.30 18
2019-06-03 Perforation 5350.00 5350.30 18
2019-06-03 Perforation 5360.00 5360.30 18
2019-06-03 Perforation 5370.00 5370.30 18
2019-06-03 Perforation 5380.00 5380.30 18
2019-05-26 Perforation 6530.00 6530.30 18
2019-06-03 Perforation 5390.00 5390.30 18
2019-06-03 Perforation 5400.00 5400.30 18
2019-06-03 Perforation 5410.00 5410.30 18
2019-06-03 Perforation 5420.00 5420.30 18
2019-06-03 Perforation 5430.00 5430.30 18
2019-06-03 Perforation 5440.00 5440.30 18
2019-06-03 Perforation 5450.00 5450.30 18
2019-06-03 Perforation 5460.00 5460.30 18
2019-06-03 Perforation 5470.00 5470.30 18
2019-06-03 Perforation 5480.00 5480.30 18
2019-05-26 Perforation 6540.00 6540.30 18
2019-06-03 Perforation 5490.00 5490.30 18
2019-06-03 Fracture 5420.00 5490.30 0
2019-06-03 Fracture 5500.00 5570.30 0
2019-06-06 Perforation 5260.00 5260.30 18
2019-06-06 Perforation 5270.00 5270.30 18
2019-06-06 Perforation 5280.00 5280.30 18
2019-06-06 Perforation 5290.00 5290.30 18
2019-06-06 Perforation 5300.00 5300.30 18
2019-06-06 Perforation 5310.00 5310.30 18
2019-06-06 Perforation 5320.00 5320.30 18
2019-05-26 Perforation 6550.00 6550.30 18
2019-06-06 Perforation 5330.00 5330.30 18
2019-06-06 Fracture 5340.00 5410.30 0
2019-06-07 Perforation 5180.00 5180.30 18
2019-06-07 Perforation 5190.00 5190.30 18
2019-06-07 Perforation 5200.00 5200.30 18
2019-06-07 Perforation 5210.00 5210.30 18
2019-06-07 Perforation 5220.00 5220.30 18
2019-06-07 Perforation 5230.00 5230.30 18
2019-06-07 Perforation 5240.00 5240.30 18
2019-06-07 Perforation 5250.00 5250.30 18
2019-05-26 Perforation 6560.00 6560.30 18
2019-06-07 Fracture 5180.00 5250.30 0
2019-06-07 Fracture 5260.00 5330.30 0
2019-06-08 Perforation 5020.00 5020.30 18
2019-06-08 Perforation 5030.00 5030.30 18
2019-06-08 Perforation 5040.00 5040.30 18
2019-06-08 Perforation 5050.00 5050.30 18
2019-06-08 Perforation 5060.00 5060.30 18
2019-06-08 Perforation 5070.00 5070.30 18
2019-06-08 Perforation 5080.00 5080.30 18
2019-06-08 Perforation 5090.00 5090.30 18
2019-05-26 Perforation 6570.00 6570.30 18
2019-06-08 Perforation 5100.00 5100.30 18
2019-06-08 Perforation 5110.00 5110.30 18
2019-06-08 Perforation 5120.00 5120.30 18
2019-06-08 Perforation 5130.00 5130.30 18
2019-06-08 Perforation 5140.00 5140.30 18
2019-06-08 Perforation 5150.00 5150.30 18
2019-06-08 Perforation 5160.00 5160.30 18
2019-06-08 Perforation 5170.00 5170.30 18
2019-06-08 Fracture 5100.00 5170.30 0
2019-06-10 Perforation 4940.00 4940.30 18
2019-05-16 Perforation 6710.00 6710.30 18
2019-05-26 Perforation 6580.00 6580.30 18
2019-06-10 Perforation 4950.00 4950.30 18
2019-06-10 Perforation 4960.00 4960.30 18
2019-06-10 Perforation 4970.00 4970.30 18
2019-06-10 Perforation 4980.00 4980.30 18
2019-06-10 Perforation 4990.00 4990.30 18
2019-06-10 Perforation 5000.00 5000.30 18
2019-06-10 Perforation 5010.00 5010.30 18
2019-06-10 Fracture 4940.00 5010.30 0
2019-06-10 Fracture 5020.00 5090.30 0
2019-06-11 Perforation 4680.00 4680.30 18
2019-05-26 Perforation 6590.00 6590.30 18
2019-06-11 Perforation 4690.00 4690.30 18
2019-06-11 Perforation 4700.00 4700.30 18
2019-06-11 Perforation 4710.00 4710.30 18
2019-06-11 Perforation 4720.00 4720.30 18
2019-06-11 Perforation 4730.00 4730.30 18
2019-06-11 Perforation 4740.00 4740.30 18
2019-06-11 Perforation 4750.00 4750.30 18
2019-06-11 Perforation 4760.00 4760.30 18
2019-06-11 Perforation 4770.00 4770.30 18
2019-06-11 Perforation 4780.00 4780.30 18
2019-05-26 Perforation 6600.00 6600.30 18
2019-06-11 Perforation 4790.00 4790.30 18
2019-06-11 Perforation 4800.00 4800.30 18
2019-06-11 Perforation 4810.00 4810.30 18
2019-06-11 Perforation 4820.00 4820.30 18
2019-06-11 Perforation 4830.00 4830.30 18
2019-06-11 Perforation 4840.00 4840.30 18
2019-06-11 Perforation 4850.00 4850.30 18
2019-06-11 Perforation 4860.00 4860.30 18
2019-06-11 Perforation 4870.00 4870.30 18
2019-06-11 Perforation 4880.00 4880.30 18
2019-05-26 Perforation 6610.00 6610.30 18
2019-06-11 Perforation 4890.00 4890.30 18
2019-06-11 Perforation 4900.00 4900.30 18
2019-06-11 Perforation 4910.00 4910.30 18
2019-06-11 Perforation 4920.00 4920.30 18
2019-06-11 Perforation 4930.00 4930.30 18
2019-06-11 Fracture 4770.00 4850.30 0
2019-06-11 Fracture 4860.00 4930.30 0
2019-06-12 Perforation 4590.00 4590.30 18
2019-06-12 Perforation 4600.00 4600.30 18
2019-06-12 Perforation 4610.00 4610.30 18
2019-05-26 Perforation 6620.00 6620.30 18
2019-06-12 Perforation 4620.00 4620.30 18
2019-06-12 Perforation 4630.00 4630.30 18
2019-06-12 Perforation 4640.00 4640.30 18
2019-06-12 Perforation 4650.00 4650.30 18
2019-06-12 Perforation 4660.00 4660.30 18
2019-06-12 Perforation 4670.00 4670.30 18
2019-06-12 Fracture 4590.00 4670.30 0
2019-06-12 Fracture 4680.00 4760.30 0
2019-06-13 Perforation 4410.00 4410.30 18
2019-06-13 Perforation 4420.00 4420.30 18
2019-05-26 Perforation 6630.00 6630.30 18
2019-06-13 Perforation 4430.00 4430.30 18
2019-06-13 Perforation 4440.00 4440.30 18
2019-06-13 Perforation 4450.00 4450.30 18
2019-06-13 Perforation 4460.00 4460.30 18
2019-06-13 Perforation 4470.00 4470.30 18
2019-06-13 Perforation 4480.00 4480.30 18
2019-06-13 Perforation 4490.00 4490.30 18
2019-06-13 Perforation 4500.00 4500.30 18
2019-06-13 Perforation 4510.00 4510.30 18
2019-06-13 Perforation 4520.00 4520.30 18
2019-05-26 Fracture 6520.00 6570.30 0
2019-06-13 Perforation 4530.00 4530.30 18
2019-06-13 Perforation 4540.00 4540.30 18
2019-06-13 Perforation 4550.00 4550.30 18
2019-06-13 Perforation 4560.00 4560.30 18
2019-06-13 Perforation 4570.00 4570.30 18
2019-06-13 Perforation 4580.00 4580.30 18
2019-06-13 Fracture 4410.00 4490.30 0
2019-06-13 Fracture 4500.00 4580.30 0
2019-06-14 Perforation 4140.00 4140.30 18
2019-06-14 Perforation 4150.00 4150.30 18
2019-05-26 Fracture 6580.00 6630.30 0
2019-06-14 Perforation 4160.00 4160.30 18
2019-06-14 Perforation 4170.00 4170.30 18
2019-06-14 Perforation 4180.00 4180.30 18
2019-06-14 Perforation 4190.00 4190.30 18
2019-06-14 Perforation 4200.00 4200.30 18
2019-06-14 Perforation 4210.00 4210.30 18
2019-06-14 Perforation 4220.00 4220.30 18
2019-06-14 Perforation 4230.00 4230.30 18
2019-06-14 Perforation 4240.00 4240.30 18
2019-06-14 Perforation 4250.00 4250.30 18
2019-05-26 Fracture 6640.00 6690.30 0
2019-06-14 Perforation 4260.00 4260.30 18
2019-06-14 Perforation 4270.00 4270.30 18
2019-06-14 Perforation 4280.00 4280.30 18
2019-06-14 Perforation 4290.00 4290.30 18
2019-06-14 Perforation 4300.00 4300.30 18
2019-06-14 Perforation 4310.00 4310.30 18
2019-06-14 Perforation 4320.00 4320.30 18
2019-06-14 Perforation 4330.00 4330.30 18
2019-06-14 Perforation 4340.00 4340.30 18
2019-06-14 Perforation 4350.00 4350.30 18
2019-05-27 Perforation 6340.00 6340.30 18
2019-06-14 Perforation 4360.00 4360.30 18
2019-06-14 Perforation 4370.00 4370.30 18
2019-06-14 Perforation 4380.00 4380.30 18
2019-06-14 Perforation 4390.00 4390.30 18
2019-06-14 Perforation 4400.00 4400.30 18
2019-06-14 Fracture 4230.00 4310.30 0
2019-06-14 Fracture 4320.00 4400.30 0
2019-06-15 Perforation 3960.00 3960.30 18
2019-06-15 Perforation 3970.00 3970.30 18
2019-06-15 Perforation 3980.00 3980.30 18
2019-05-16 Perforation 6720.00 6720.30 18
2019-05-27 Perforation 6350.00 6350.30 18
2019-06-15 Perforation 3990.00 3990.30 18
2019-06-15 Perforation 4000.00 4000.30 18
2019-06-15 Perforation 4010.00 4010.30 18
2019-06-15 Perforation 4020.00 4020.30 18
2019-06-15 Perforation 4030.00 4030.30 18
2019-06-15 Perforation 4040.00 4040.30 18
2019-06-15 Perforation 4050.00 4050.30 18
2019-06-15 Perforation 4060.00 4060.30 18
2019-06-15 Perforation 4070.00 4070.30 18
2019-06-15 Perforation 4080.00 4080.30 18
2019-05-27 Perforation 6360.00 6360.30 18
2019-06-15 Perforation 4090.00 4090.30 18
2019-06-15 Perforation 4100.00 4100.30 18
2019-06-15 Perforation 4110.00 4110.30 18
2019-06-15 Perforation 4120.00 4120.30 18
2019-06-15 Perforation 4130.00 4130.30 18
2019-06-15 Fracture 3960.00 4040.30 0
2019-06-15 Fracture 4050.00 4130.30 0
2019-06-15 Fracture 4140.00 4220.30 0
2019-06-16 Perforation 3780.00 3780.30 18
2019-06-16 Perforation 3790.00 3790.30 18
2019-05-27 Perforation 6370.00 6370.30 18
2019-06-16 Perforation 3800.00 3800.30 18
2019-06-16 Perforation 3810.00 3810.30 18
2019-06-16 Perforation 3820.00 3820.30 18
2019-06-16 Perforation 3830.00 3830.30 18
2019-06-16 Perforation 3840.00 3840.30 18
2019-06-16 Perforation 3850.00 3850.30 18
2019-06-16 Perforation 3860.00 3860.30 18
2019-06-16 Perforation 3870.00 3870.30 18
2019-06-16 Perforation 3880.00 3880.30 18
2019-06-16 Perforation 3890.00 3890.30 18
2019-05-27 Perforation 6380.00 6380.30 18
2019-06-16 Perforation 3900.00 3900.30 18
2019-06-16 Perforation 3910.00 3910.30 18
2019-06-16 Perforation 3920.00 3920.30 18
2019-06-16 Perforation 3930.00 3930.30 18
2019-06-16 Perforation 3940.00 3940.30 18
2019-06-16 Perforation 3950.00 3950.30 18
2019-06-16 Fracture 3870.00 3950.30 0
2019-06-17 Perforation 3730.00 3730.30 18
2019-06-17 Perforation 3740.00 3740.30 18
2019-06-17 Perforation 3750.00 3750.30 18
2019-05-27 Perforation 6390.00 6390.30 18
2019-06-17 Perforation 3760.00 3760.30 18
2019-06-17 Perforation 3770.00 3770.30 18
2019-06-17 Fracture 3730.00 3770.30 0
2019-06-17 Fracture 3780.00 3860.30 0
2019-05-27 Perforation 6400.00 6400.30 18
2019-05-27 Perforation 6410.00 6410.30 18
2019-05-27 Perforation 6420.00 6420.30 18
2019-05-27 Perforation 6430.00 6430.30 18
2019-05-27 Perforation 6440.00 6440.30 18
2019-05-16 Perforation 6730.00 6730.30 18
2019-05-27 Perforation 6450.00 6450.30 18
2019-05-27 Perforation 6460.00 6460.30 18
2019-05-27 Perforation 6470.00 6470.30 18
2019-05-27 Perforation 6480.00 6480.30 18
2019-05-27 Perforation 6490.00 6490.30 18
2019-05-27 Perforation 6500.00 6500.30 18
2019-05-27 Perforation 6510.00 6510.30 18
2019-05-27 Fracture 6340.00 6390.30 0
2019-05-27 Fracture 6400.00 6450.30 0
2019-05-27 Fracture 6460.00 6510.30 0
2019-05-16 Perforation 6740.00 6740.30 18
2019-05-28 Perforation 6280.00 6280.30 18
2019-05-28 Perforation 6290.00 6290.30 18
2019-05-28 Perforation 6300.00 6300.30 18
2019-05-28 Perforation 6310.00 6310.30 18
2019-05-28 Perforation 6320.00 6320.30 18
2019-05-28 Perforation 6330.00 6330.30 18
2019-05-28 Fracture 6280.00 6330.30 0
2019-05-29 Perforation 6220.00 6220.30 18
2019-05-29 Perforation 6230.00 6230.30 18
2019-05-29 Perforation 6240.00 6240.30 18
2019-05-16 Perforation 6750.00 6750.30 18
2019-05-29 Perforation 6250.00 6250.30 18
2019-05-29 Perforation 6260.00 6260.30 18
2019-05-29 Perforation 6270.00 6270.30 18
2019-05-29 Fracture 6220.00 6270.30 0
2019-05-30 Perforation 6160.00 6160.30 18
2019-05-30 Perforation 6170.00 6170.30 18
2019-05-30 Perforation 6180.00 6180.30 18
2019-05-30 Perforation 6190.00 6190.30 18
2019-05-30 Perforation 6200.00 6200.30 18
2019-05-30 Perforation 6210.00 6210.30 18
2019-05-17 Multi-Stage Fracture 6700.00 6775.40 0
2019-05-30 Fracture 6160.00 6210.30 0
2019-05-31 Perforation 5950.00 5950.30 18
2019-05-31 Perforation 5960.00 5960.30 18
2019-05-31 Perforation 5970.00 5970.30 18
2019-05-31 Perforation 5980.00 5980.30 18
2019-05-31 Perforation 5990.00 5990.30 18
2019-05-31 Perforation 6000.00 6000.30 18
2019-05-31 Perforation 6010.00 6010.30 18
2019-05-31 Perforation 6020.00 6020.30 18
2019-05-31 Perforation 6030.00 6030.30 18
2019-05-24 Perforation 6640.00 6640.30 16
2019-05-31 Perforation 6040.00 6040.30 18
2019-05-31 Perforation 6050.00 6050.30 18
2019-05-31 Perforation 6060.00 6060.30 18
2019-05-31 Perforation 6070.00 6070.30 18
2019-05-31 Perforation 6080.00 6080.30 18
2019-05-31 Perforation 6090.00 6090.30 18
2019-05-31 Perforation 6100.00 6100.30 18
2019-05-31 Perforation 6110.00 6110.30 18
2019-05-31 Perforation 6120.00 6120.30 18
2019-05-31 Perforation 6130.00 6130.30 18
2019-05-24 Perforation 6650.00 6650.30 16
2019-05-31 Perforation 6140.00 6140.30 18
2019-05-31 Perforation 6150.00 6150.30 18
2019-05-31 Fracture 6020.00 6080.30 0
2019-05-31 Fracture 6090.00 6150.30 0
2019-06-01 Perforation 5740.00 5740.30 18
2019-06-01 Perforation 5750.00 5750.30 18
2019-06-01 Perforation 5760.00 5760.30 18
2019-06-01 Perforation 5770.00 5770.30 18
2019-06-01 Perforation 5780.00 5780.30 18
2019-06-01 Perforation 5790.00 5790.30 18

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-17 2019-06-17 3,437 51,625 N/A
2 2019-06-12 2019-06-15 3,437 0 N/A
3 2019-05-31 2019-06-11 3,437 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 85.4223 N/A
40/70 Import Sand Source Energy Services Crystalline Silica 14808-60-7 100 12.8813 N/A
50/140 Import Sand LaPrairie Crystalline Silica 14808-60-7 100 1.323 N/A
15% HCl Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.4451 N/A
Water 7732-18-5 100 0.4451 N/A
SAB-1 Acid Blend Additive Package Step Energy Services Acid Acetic Acid 64-19-7 100 0.0047 N/A
Ethylene Glycol 107-21-1 100 0.0047 N/A
Methyl Alcohol 67-56-1 100 0.0047 N/A
Non Hazardous Ingredients Not Available 100 0.0047 N/A
Propan-2-ol 67-63-0 100 0.0047 N/A
SABB-1 (Acid Corrosion Inhibitor) Step Energy Services Acid 2-Propanol 67-63-0 100 0.0026 N/A
Ethylene Glycol 107-21-1 100 0.0026 N/A
Methyl Alcohol 67-56-1 100 0.0026 N/A
Non-Hazardous Ingredients Not Available 100 0.0026 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0078 N/A
Cured Acrylic Resin Not Available 100 0.0078 N/A
Non-Hazardous Ingredients Not Available 100 0.0078 N/A
PFR-103 Engenium Chemicals Corp. Friction Reducer Non-Hazardous Ingredients Not Available 100 0.3138 N/A
2 PFR-308 (Friction Reducer) STEP Energy Services Friction Reducer Non Hazardous Not Available 100 0.1854 N/A
3 PFR-603 (Friction Reducer) STEP Energy Services Friction Reducer Non Hazardous Not Available 100 0.097 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-05-16 2019-06-27 Central Water Distribution Facility 52280

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4416 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-16 No Incident Encountered 0.00 0.00
2019-06-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References