X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032209AD0

Well Details

Well ID: 0644032209AD0
Loading map...
Location: AD/09-22-064-03W4/0
Location Alias: AD/09-22-64-03 W4M
Location Alias 2: AD/09-22-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 22
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP ETHEL THX C9-22-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0030522
License Date: 1966-06-08
License Status: Abandoned
Spud Date: 1966-09-30
Final Drill Date: 1966-10-04
Well Total Depth: 490.40 m
Surface Hole Latitude: 54.554243
Surface Hole Longitude: -110.363582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-08 Obtained License
1966-10-04 Finished Drilling
1966-10-04 Well Mode changed to Drilled and Cased
1966-10-05 Production Casing Operation Performed
1966-10-09 Liner Casing Operation Performed
1966-10-10 Perforation Treatment Performed - Open-Hole Completion
1967-01-01 Well Began Production
1967-01-01 Well Fluid changed to Crude Bitumen
1967-01-01 Well Type changed to Cyclical
1968-02-07 Perforation Treatment Performed - Jet Perforation
1968-12-02 Perforation Treatment Performed - Cement Plug
1970-05-21 Well Fluid changed to Crude Bitumen
1970-05-21 Well Mode changed to Suspended
1970-05-21 Well Type changed to Cyclical
1991-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-19 Plug Back Performed
1991-10-19 Well Fluid changed to Crude Bitumen
1991-10-19 Well Mode changed to Abandoned Zone
1991-10-19 Well Type changed to Cyclical
1994-11-09 Well Abandoned
1994-11-09 Well Fluid changed to Crude Bitumen
1994-11-09 Well Mode changed to Abandoned
1994-11-09 Well Type changed to Cyclical

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-10 Open Hole/Barefoot Completion 473.60 490.40 0
1968-02-07 Perforation 454.20 460.20 13
1968-02-07 Perforation 466.30 472.40 13
1968-12-02 Cement Plug 479.70 490.10 0
1991-10-19 Packing Device Capped w/Cement 274.00 434.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 2399 0.0 0.0 0.0
1968 288 0.0 0.0 0.0
1969 5447 0.0 0.0 0.0
1970 2232 0.0 0.0 0.0

For data sources see[5]

References